



RAD offers new building modules for cancer centers
RAD Technology Medical Systems erweitert sein Portfolio an modularen Gebäudesystemen für die Bestrahlungstherapie. Die Stationen sind für die neuesten Modelle von Linearbeschleunigern ausgelegt. Damit können bereits einen Monat nach Baubeginn Patienten behandelt werden.

The area between St.Gallen and Gossau receives the green light
– Die Stadtparlamente von St.Gallen und Gossau haben grünes Licht für die Entwicklungsplanung des Areals zwischen beiden Städten gegeben. An der Entwicklung des 1,7 Millionen Quadratmeter grossen Areals beteiligen sich auch der Kanton, Gaiserwald und die

Vision for the further development of the "Metalli living space"
For Zug Estates the starting point is clear: the area around the “Metalli” shopping center has become an important meeting place for the city of Zug. In order for the quarter to be able to meet future needs after more than thirty years of existence, it must develop further. To this end, more

Two new buildings next to the Schwyz Hospital
The two new buildings are called House M and House P. In the new house M – the letter stands for multifunctional building – various uses are planned. These include, for example, service areas, staff rooms and areas used for medical purposes. The Schwyz Hospital is expanding its range of

Thalwil: development with rail connection
The “Talevo” project is to create sales and office space in the existing goods shed on the eastern part of Thalwil train station. In addition, attic apartments or offices are planned to be added. In addition to the goods shed, an architecturally and energetically high-quality residential

"Stellwerk 2": In tune with the times
The first stage, the “Stellwerk 1” office building, was completed in 2010 right next to the historic station building. In addition, the elongated property between the tracks and the station square remained in an exposed location, next to the Wülflingerstrasse underpass. The new "Stellwerk

A superlative future project
Where the SBB's repair center (Depot G) is located today, a new piece of the city is to be built in the middle of the city in the future. This is done on an area larger than four football fields. Those responsible for the project envision that different offers for living and working as well

Extended tram depot including 193 rental apartments
The new building project emerged as the winner of an architecture competition in 2016. The project was penned by Morger Partner Architects from Basel. The project was particularly convincing with its high space and volume efficiency, which, in addition to cost advantages, also promises energetic

Another skyscraper characterizes Zurich Oerlikon
The foundation stone for the project was laid in 2014 with a multi-stage general planning competition. Armon Semadeni Architects, Zurich emerged as the winner. SBB is investing around 96 million francs in the Franklinturm at Zurich Oerlikon station. The almost eighty meter high new building will

Apartments close to the center on the brewery area
The premises of the H. Müller AG brewery and the Burger heirs are directly adjacent to the Baden train station and are within walking distance of Baden's old town. Beer has been brewed on the site since 1897. Today the areas are densely built with commercial uses. The brewery H. Müller AG

Mammoth project in Niderfeld
The Niderfeld is located in the northeast of the Dietikon municipality and partly borders on Spreitenbach. With around 40 hectares, Niderfeld is Dietikon's last large reserve of building land. And good things take time: The planning of what the area used for agriculture up to 1890 will look

Urdorf-Nord: From the workplace to the town in the village
There is a master plan for Urdorf-Nord, which aims to lead the economically and urban-planning important economic area into a modern and attractive future. The district is currently struggling with structural difficulties that have led to considerable vacancies and poor quality urban space.

Letzibach D: Three autonomous building parts from three different clients
The new Letzibach D building will be built in Zurich-Altstetten between 2021 and 2025. The city of Zurich acquired the 10,000 square meter area from SBB in 2014. The area has the open track field on the north side and the busy Hohlstrasse on the south side. 250 non-profit apartments are to be built

Star architects are building on Lindenplatz
The list of her previous buildings includes the Elbphilharmonie in Hamburg and the Tate Modern in London. And now the Basel duo Jacques Herzog and Pierre de Meuron is building on Lindenplatz in Zurich-Altstetten. Between 2022 and 2024, the Badener- Strasse and Segnesstrasse the existing houses will

Urdorfer S+U Bau baut Spitalskapelle wieder auf
Urdorf/Schlieren ZH – Die wegen des Neubaus abgerissene Kapelle des Spitals Limmattal wird wieder aufgebaut. Die Urdorfer S+U Bau AG hat schon den Baukran aufgestellt. Die Kapelle aus den 60er Jahren soll original wiedererstehen und im Frühjahr eingeweiht

Helvetia invests in the RhyTech quarter
Neuhausen a.R. SH – Die Halter AG realisiert auf dem ehemaligen Alusuisse-Areal in Neuhausen am Rheinfall das RhyTech-Quartier. Dabei werden zwei Hochhäuser und ein Mehrfamilienhaus erstellt und die historische Halle 22 umgebaut. In eines der Hochhäuser wird Helvetia Versicherungen

Lake Zurich education center inaugurates new building
Das Bildungszentrum Zürichsee hat am Dienstag einen Neubau in Horgen eingeweiht. Dieser ergänzt das bestehende Gebäude, das nun saniert werden soll. Nach dem Abschluss der Arbeiten werden die Bauten Wasser aus dem Zürichsee zur Kälte- und Wärmeerzeugung








