Walo installs new flooring at Stadler

Dietikon ZH, February 2022

The Dietiker construction company Walo Bertschinger has provided the production halls at Stadler in St.Margarethen SG with a new floor covering. The Haypanol-D covering developed by Walo was used for the 19,000 square meter area.

Walo Bertschinger has provided the Stadler Rail production halls in St. Margrethen with a new floor covering. According to a message on Facebook, an area of 19,000 square meters was covered with the Haypanol-D covering in the production halls for the assembly of trains. The Haypanol-D epoxy coating developed by Walo has been tried and tested in industrial buildings and parks for years. The finally hardened epoxy forms together with the scattered material of the quartz sand a very hard, clean and even surface structure.

According to a technical explanation on Walo’s special website for floor coverings, the seamless Haypanol-D litter coverings have high mechanical and chemical resistance. The property profile of the industrial floor coverings is adapted to the respective stress class. The anti-slip properties of the covering are coordinated according to the customer’s requirements. In addition, the system can also be designed as an antistatic or electrically conductive covering. The flooring has a longevity of up to 25 years.

The Stadler site in St.Margrethen in the border triangle is the competence center for double-deck multiple units within the Stadler Group, according to the Stadler Group website. After more than 20 years in Altenrhein, this production was moved to the newly built plant in St.Margrethen in 2020.

More articles