“Insieme” education centers in Sursee

With the "Insieme" project, the joint location of the health and social services and business, IT and technology education centers in Sursee will receive a new seven-storey building along the railroad line. The Lucerne cantonal government is thus strengthening a central educational location for around 3,800 students and is focusing on urban densification, flexible learning landscapes and sustainable construction methods.

Visualization: zvg

March 2026

The project competition was announced as an open, single-stage and anonymous procedure for general planning teams, with eight teams submitting proposals on time. The jury assessed them according to functionality, cost-effectiveness, sustainability, urban planning and architecture and awarded the contract to the “Insieme” project by Bob Gysin Partner from Zurich. The centerpiece is a new seven-storey building along the railroad line, which makes a clear contribution to urban densification and orients the campus more towards the station.

Bright learning landscape
In future, the new main entrances will be oriented more towards the railroad station, thus relieving the existing access through the adjacent residential area. All gymnasiums will be accessible via the newly defined entrance area, which will simplify routing and orientation. The arrangement of classrooms, group rooms, atriums and meeting zones creates a bright, flexible learning landscape that supports different forms of teaching and informal encounters in equal measure.

Building sustainably, upgrading open spaces
In terms of construction, “Insieme” relies on a combination of existing buildings and timber construction. With the exception of the basement, the existing building in Wing B is being dismantled and extended with a timber ribbed ceiling to create a six-storey building. The design of the open space responds to the climate heating by shading the existing staircase and enhancing it with additional planting and seating. The edge of the forest will have new recreational areas and loose tree planting, which will significantly increase the quality of the outdoor space.

Next steps until commissioning
In the first quarter of 2026, the jury’s comments will be reviewed and the competition project optimized if necessary. The extended facility is currently scheduled to open in 2035. Around CHF 97.4 million has been set aside in the cantonal financial planning for the expansion and partial renovation of the BBZG W in Sursee. An investment in future-proof vocational training and a strong educational location in the region.

More articles