Urdorf-Nord: From the workplace to the town in the village
In order to strengthen the economic area Urdorf-Nord in the long term and to ensure that the trade in the transferring area has the best possible framework conditions, the municipal…
In order to strengthen the economic area Urdorf-Nord in the long term and to ensure that the trade in the transferring area has the best possible framework conditions, the municipal…
A new care center adapted to today's needs is being built on the former site of the old Limmattal Hospital.
The social mix is to be ensured on the Letzibach area with 265 new, non-profit apartments.
The internationally known Basel architects Jacques Herzog and Pierre de Meuron will provide attractive new buildings between Badenerstrasse and Segnesstrasse in Zurich-Altstetten until 2024.
The Limmat Valley from Baden to Zurich is a real powerhouse of dynamism, vitality and density of experiences. The formerly industrial region is developing into an attractive city on the…
Daniel Issler, Managing Director of Limmattalbahn AG, is responsible for the construction of the second stage from Schlieren Geissweid to Killwangen-Spreitenbach. He explains why the Limmattalbahn is more advantageous than…
The citizens of Geroldswil approved an additional loan at the ballot box for the continuation of the Baufeld Hotel project. Instead of the hotel, a central development with apartments is…
Die wegen des Neubaus abgerissene Kapelle des Spitals Limmattal wird wieder aufgebaut. Die Urdorfer S+U Bau AG hat schon den Baukran aufgestellt. Die Kapelle aus den 60er Jahren soll original wiedererstehen…
The next Limmattal Economic Panel (WIPO) planned for November 2020 has to be canceled due to the current situation. The next WIPO will therefore be held in November 2021.