{"id":77698,"date":"2024-02-26T16:00:00","date_gmt":"2024-02-26T15:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=77698"},"modified":"2024-02-26T08:45:40","modified_gmt":"2024-02-26T07:45:40","slug":"hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden","status":"publish","type":"post","link":"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/","title":{"rendered":"Indoor pool renovation in Geroldswil must be rescheduled"},"content":{"rendered":"<p class=\"bodytext\">The construction work at the <a href=\"https:\/\/www.geroldswil.ch\/verwaltungpolitik\/verwaltung\/abteilungen\/bevoelkerungsdienste\/hallenbad.html\/583\" target=\"_blank\" rel=\"noopener\">indoor swimming pool<\/a> in <a href=\"http:\/\/www.geroldswil.ch\" target=\"_blank\" rel=\"noopener\">Geroldswil<\/a> cannot be realised as planned because the renovation concept could not be implemented on schedule. In order to ensure the safety of pool visitors, the municipal council is now working on a new renovation plan, according to a <a href=\"http:\/\/www.geroldswil.ch\/aktuellesgeroldswil\/aktuelles\/aktuelle-meldungen\/detail.html\/66\/news\/3219\" target=\"_blank\" rel=\"noopener\">press release<\/a>.<\/p>\n<p class=\"bodytext\">The refurbishment concerns the supporting structure of the indoor pool roof. The original plan was to replace the old support heads with new ones. In the course of this construction measure, the cavity beams were opened up. Corrosion was found to be so severe in some of them that the existing renovation plan could not be realised. The renovation measures are now being re-planned.<\/p>\n<p class=\"bodytext\">It is currently not clear whether a completely new roof will have to be built. Further clarifications and investigations are needed first. &#8220;The municipal council is giving itself the necessary time to consider all eventualities, which could take until the end of March 2024,&#8221; it says. Swimming operations in the indoor pool have been suspended since 19 June 2023 due to renovation work.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The construction work at the Geroldswil indoor swimming pool has revealed defects in elements of the roof structure. A new renovation concept must therefore be drawn up. Safety considerations have provided the impetus.<\/p>\n","protected":false},"author":2,"featured_media":21756,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"pmpro_default_level":"0","_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[12476,12485],"tags":[44944,44945,12536,30943,15586,12819,33612,44946],"class_list":["post-77698","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-immonews","category-projects-en","tag-badebetrieb-en","tag-baumassnahme-en","tag-bauwesen-en","tag-hallenbad-en","tag-planung-en","tag-sanierung-en","tag-tragwerk-en","tag-umbauarbeiten-en","pmpro-has-access"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"The construction work at the Geroldswil indoor swimming pool has revealed defects in elements of the roof structure. A new renovation concept must therefore be drawn up. Safety considerations have provided the impetus.","autor":"ce\/heg","ort":"Geroldswil ZH ","bildunterschrift":"","zusammenfassung":"","bild_im_grid":false,"gallerie":"","newsim":""},"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"The construction work at the Geroldswil indoor swimming pool has revealed defects in elements of the roof structure. A new renovation concept must therefore be drawn up. Safety considerations have provided the impetus.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"immovestuser\"\/>\n\t<meta name=\"google-site-verification\" content=\"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Indoor pool renovation in Geroldswil must be rescheduled - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:description\" content=\"The construction work at the Geroldswil indoor swimming pool has revealed defects in elements of the roof structure. A new renovation concept must therefore be drawn up. Safety considerations have provided the impetus.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/12\/bauen-11.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/12\/bauen-11.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-02-26T15:00:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-02-26T07:45:40+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Indoor pool renovation in Geroldswil must be rescheduled - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The construction work at the Geroldswil indoor swimming pool has revealed defects in elements of the roof structure. A new renovation concept must therefore be drawn up. Safety considerations have provided the impetus.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/12\/bauen-11.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\\\/#blogposting\",\"name\":\"Indoor pool renovation in Geroldswil must be rescheduled - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"headline\":\"Indoor pool renovation in Geroldswil must be rescheduled\",\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/bauen-11.jpg\",\"width\":1200,\"height\":628},\"datePublished\":\"2024-02-26T16:00:00+01:00\",\"dateModified\":\"2024-02-26T08:45:40+01:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\\\/#webpage\"},\"articleSection\":\"immoNews, Projects, Badebetrieb, Baumassnahme, Bauwesen, Hallenbad, Planung, Sanierung, Tragwerk, Umbauarbeiten, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/immonews\\\/#listItem\",\"name\":\"immoNews\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/immonews\\\/#listItem\",\"position\":2,\"name\":\"immoNews\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/immonews\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\\\/#listItem\",\"name\":\"Indoor pool renovation in Geroldswil must be rescheduled\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\\\/#listItem\",\"position\":3,\"name\":\"Indoor pool renovation in Geroldswil must be rescheduled\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/immonews\\\/#listItem\",\"name\":\"immoNews\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"email\":\"admin@immomedia.ag\",\"telephone\":\"+41444420002\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/immoinvest_sm-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\\\/#organizationLogo\",\"width\":2560,\"height\":1340},\"image\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Immoinvest\\\/100077962920504\\\/\",\"https:\\\/\\\/x.com\\\/i\\\/flow\\\/login?redirect_after_login=immoinvest_ch\",\"https:\\\/\\\/www.instagram.com\\\/immoinvest_ch\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/immoinvest-swiss\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/\",\"name\":\"immovestuser\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"immovestuser\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\\\/#webpage\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\\\/\",\"name\":\"Indoor pool renovation in Geroldswil must be rescheduled - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"The construction work at the Geroldswil indoor swimming pool has revealed defects in elements of the roof structure. A new renovation concept must therefore be drawn up. Safety considerations have provided the impetus.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/bauen-11.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\\\/#mainImage\",\"width\":1200,\"height\":628},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\\\/#mainImage\"},\"datePublished\":\"2024-02-26T16:00:00+01:00\",\"dateModified\":\"2024-02-26T08:45:40+01:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Indoor pool renovation in Geroldswil must be rescheduled - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"The construction work at the Geroldswil indoor swimming pool has revealed defects in elements of the roof structure. A new renovation concept must therefore be drawn up. Safety considerations have provided the impetus.","canonical_url":"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/#blogposting","name":"Indoor pool renovation in Geroldswil must be rescheduled - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","headline":"Indoor pool renovation in Geroldswil must be rescheduled","author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/12\/bauen-11.jpg","width":1200,"height":628},"datePublished":"2024-02-26T16:00:00+01:00","dateModified":"2024-02-26T08:45:40+01:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/#webpage"},"isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/#webpage"},"articleSection":"immoNews, Projects, Badebetrieb, Baumassnahme, Bauwesen, Hallenbad, Planung, Sanierung, Tragwerk, Umbauarbeiten, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.immo-invest.ch\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/immonews\/#listItem","name":"immoNews"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/immonews\/#listItem","position":2,"name":"immoNews","item":"https:\/\/www.immo-invest.ch\/en\/category\/immonews\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/#listItem","name":"Indoor pool renovation in Geroldswil must be rescheduled"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/#listItem","position":3,"name":"Indoor pool renovation in Geroldswil must be rescheduled","previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/immonews\/#listItem","name":"immoNews"}}]},{"@type":"Organization","@id":"https:\/\/www.immo-invest.ch\/en\/#organization","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","url":"https:\/\/www.immo-invest.ch\/en\/","email":"admin@immomedia.ag","telephone":"+41444420002","logo":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/09\/immoinvest_sm-scaled.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/#organizationLogo","width":2560,"height":1340},"image":{"@id":"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","https:\/\/x.com\/i\/flow\/login?redirect_after_login=immoinvest_ch","https:\/\/www.instagram.com\/immoinvest_ch\/","https:\/\/www.linkedin.com\/company\/immoinvest-swiss"]},{"@type":"Person","@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author","url":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/","name":"immovestuser","image":{"@type":"ImageObject","@id":"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g","width":96,"height":96,"caption":"immovestuser"}},{"@type":"WebPage","@id":"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/#webpage","url":"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/","name":"Indoor pool renovation in Geroldswil must be rescheduled - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"The construction work at the Geroldswil indoor swimming pool has revealed defects in elements of the roof structure. A new renovation concept must therefore be drawn up. Safety considerations have provided the impetus.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/#breadcrumblist"},"author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"creator":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/12\/bauen-11.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/#mainImage","width":1200,"height":628},"primaryImageOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/#mainImage"},"datePublished":"2024-02-26T16:00:00+01:00","dateModified":"2024-02-26T08:45:40+01:00"},{"@type":"WebSite","@id":"https:\/\/www.immo-invest.ch\/en\/#website","url":"https:\/\/www.immo-invest.ch\/en\/","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien","og:type":"article","og:title":"Indoor pool renovation in Geroldswil must be rescheduled - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","og:description":"The construction work at the Geroldswil indoor swimming pool has revealed defects in elements of the roof structure. A new renovation concept must therefore be drawn up. Safety considerations have provided the impetus.","og:url":"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/","og:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/12\/bauen-11.jpg","og:image:secure_url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/12\/bauen-11.jpg","og:image:width":1200,"og:image:height":628,"article:published_time":"2024-02-26T15:00:00+00:00","article:modified_time":"2024-02-26T07:45:40+00:00","article:publisher":"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","twitter:card":"summary_large_image","twitter:site":"@i","twitter:title":"Indoor pool renovation in Geroldswil must be rescheduled - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","twitter:description":"The construction work at the Geroldswil indoor swimming pool has revealed defects in elements of the roof structure. A new renovation concept must therefore be drawn up. Safety considerations have provided the impetus.","twitter:creator":"@i","twitter:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/12\/bauen-11.jpg"},"aioseo_meta_data":{"post_id":"77698","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-09-20 16:07:58","updated":"2025-10-23 22:26:07","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/immonews\/\" title=\"immoNews\">immoNews<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tIndoor pool renovation in Geroldswil must be rescheduled\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.immo-invest.ch\/en\/"},{"label":"immoNews","link":"https:\/\/www.immo-invest.ch\/en\/category\/immonews\/"},{"label":"Indoor pool renovation in Geroldswil must be rescheduled","link":"https:\/\/www.immo-invest.ch\/en\/hallenbadsanierung-in-geroldswil-muss-neu-geplant-werden\/"}],"featured_image_src":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/12\/bauen-11-150x150.jpg","_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/77698","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=77698"}],"version-history":[{"count":0,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/77698\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/21756"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=77698"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=77698"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=77698"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}