{"id":60984,"date":"2023-08-02T16:30:00","date_gmt":"2023-08-02T14:30:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=60984"},"modified":"2023-08-02T14:06:44","modified_gmt":"2023-08-02T12:06:44","slug":"hofacker-school-complex-to-be-renovated-during-the-holidays","status":"publish","type":"post","link":"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/","title":{"rendered":"Hofacker school complex to be renovated during the holidays"},"content":{"rendered":"<p class=\"bodytext\">The beginning of the summer holidays also marks the start of construction work at the Hofacker school complex. Immediately after the weekend at the start of the holidays, &#8220;the workmen drove up with lots of building materials&#8221; on Monday, 17 July, the <a href=\"https:\/\/m.schlieren.ch\/index.php?apid=7126247\" target=\"_blank\" rel=\"noopener\">Schlieren city administration<\/a> announced in a <a href=\"https:\/\/m.schlieren.ch\/index.php?ref=search&amp;refid=4712294&amp;apid=763473781&amp;jsr=1\" target=\"_blank\" rel=\"noopener\">press<\/a> release. They invited all those involved in the project and the workmen to a fortifying breakfast. On this occasion, the city&#8217;s head of real estate, Albert Schweizer, thanked all those involved for their commitment and wished the construction work every success, according to the statement.<\/p>\n<p class=\"bodytext\">Until 2025, various renovations, maintenance and works for the implementation of building regulations are to be carried out at the school complex. The first step will be to install a handicapped-accessible lift, wheelchair-accessible toilets and access ramps to the gymnasium and the pavilions. In addition, the window fronts in the entrance area and in the singing hall are to be renewed, the basic pipes renovated and the locking system replaced.<\/p>\n<p class=\"bodytext\">These and other general repair and maintenance work will be carried out mainly during the holiday periods so that normal school operations can be maintained, explains the city administration. Since the facility is a cultural-historical building, the renovations were coordinated with the cantonal monument preservation office.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction work on the Hofacker school complex began on 17 July. The first step will be to install a handicapped-accessible lift and wheelchair-accessible toilets. All construction work is to be carried out during the school holidays.<\/p>\n","protected":false},"author":2,"featured_media":21441,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[12476],"tags":[12993,12536,41043,12525,12526,41044,41045,41046,13275,41047,41048,41049,41050],"class_list":["post-60984","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-immonews","tag-bauarbeiten-en","tag-bauwesen-en","tag-ferien-en","tag-immoinvest-en","tag-immonews-en","tag-instandhaltung-en","tag-lift-en","tag-rollstuhlzugaenglich-en","tag-schulanlage-en","tag-singsaal-en","tag-toiletten-en","tag-turnhalle-en","tag-unterhaltsarbeit-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"Construction work on the Hofacker school complex began on 17 July. The first step will be to install a handicapped-accessible lift and wheelchair-accessible toilets. All construction work is to be carried out during the school holidays.","autor":"ce\/hs","ort":"Schlieren ZH","bildunterschrift":"","zusammenfassung":"","bild_im_grid":false,"gallerie":"","newsim":""},"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.3 - aioseo.com -->\n\t<meta name=\"description\" content=\"Construction work on the Hofacker school complex began on 17 July. The first step will be to install a handicapped-accessible lift and wheelchair-accessible toilets. All construction work is to be carried out during the school holidays.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"immovestuser\"\/>\n\t<meta name=\"google-site-verification\" content=\"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.3\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Hofacker school complex to be renovated during the holidays - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:description\" content=\"Construction work on the Hofacker school complex began on 17 July. The first step will be to install a handicapped-accessible lift and wheelchair-accessible toilets. All construction work is to be carried out during the school holidays.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2021\/04\/bauen-17.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2021\/04\/bauen-17.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-08-02T14:30:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2023-08-02T12:06:44+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Hofacker school complex to be renovated during the holidays - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Construction work on the Hofacker school complex began on 17 July. The first step will be to install a handicapped-accessible lift and wheelchair-accessible toilets. All construction work is to be carried out during the school holidays.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2021\/04\/bauen-17.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hofacker-school-complex-to-be-renovated-during-the-holidays\\\/#blogposting\",\"name\":\"Hofacker school complex to be renovated during the holidays - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"headline\":\"Hofacker school complex to be renovated during the holidays\",\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2021\\\/04\\\/bauen-17.jpg\",\"width\":1200,\"height\":628},\"datePublished\":\"2023-08-02T16:30:00+02:00\",\"dateModified\":\"2023-08-02T14:06:44+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hofacker-school-complex-to-be-renovated-during-the-holidays\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hofacker-school-complex-to-be-renovated-during-the-holidays\\\/#webpage\"},\"articleSection\":\"immoNews, Bauarbeiten, Bauwesen, Ferien, Immoinvest, immoNews, Instandhaltung, Lift, Rollstuhlzug\\u00e4nglich, Schulanlage, Singsaal, Toiletten, Turnhalle, Unterhaltsarbeit, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hofacker-school-complex-to-be-renovated-during-the-holidays\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/immonews\\\/#listItem\",\"name\":\"immoNews\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/immonews\\\/#listItem\",\"position\":2,\"name\":\"immoNews\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/immonews\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hofacker-school-complex-to-be-renovated-during-the-holidays\\\/#listItem\",\"name\":\"Hofacker school complex to be renovated during the holidays\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hofacker-school-complex-to-be-renovated-during-the-holidays\\\/#listItem\",\"position\":3,\"name\":\"Hofacker school complex to be renovated during the holidays\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/immonews\\\/#listItem\",\"name\":\"immoNews\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"email\":\"admin@immomedia.ag\",\"telephone\":\"+41444420002\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/immoinvest_sm-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hofacker-school-complex-to-be-renovated-during-the-holidays\\\/#organizationLogo\",\"width\":2560,\"height\":1340},\"image\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hofacker-school-complex-to-be-renovated-during-the-holidays\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Immoinvest\\\/100077962920504\\\/\",\"https:\\\/\\\/x.com\\\/i\\\/flow\\\/login?redirect_after_login=immoinvest_ch\",\"https:\\\/\\\/www.instagram.com\\\/immoinvest_ch\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/immoinvest-swiss\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/\",\"name\":\"immovestuser\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hofacker-school-complex-to-be-renovated-during-the-holidays\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"immovestuser\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hofacker-school-complex-to-be-renovated-during-the-holidays\\\/#webpage\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hofacker-school-complex-to-be-renovated-during-the-holidays\\\/\",\"name\":\"Hofacker school complex to be renovated during the holidays - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Construction work on the Hofacker school complex began on 17 July. The first step will be to install a handicapped-accessible lift and wheelchair-accessible toilets. All construction work is to be carried out during the school holidays.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hofacker-school-complex-to-be-renovated-during-the-holidays\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2021\\\/04\\\/bauen-17.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hofacker-school-complex-to-be-renovated-during-the-holidays\\\/#mainImage\",\"width\":1200,\"height\":628},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/hofacker-school-complex-to-be-renovated-during-the-holidays\\\/#mainImage\"},\"datePublished\":\"2023-08-02T16:30:00+02:00\",\"dateModified\":\"2023-08-02T14:06:44+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Hofacker school complex to be renovated during the holidays - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Construction work on the Hofacker school complex began on 17 July. The first step will be to install a handicapped-accessible lift and wheelchair-accessible toilets. All construction work is to be carried out during the school holidays.","canonical_url":"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/#blogposting","name":"Hofacker school complex to be renovated during the holidays - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","headline":"Hofacker school complex to be renovated during the holidays","author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2021\/04\/bauen-17.jpg","width":1200,"height":628},"datePublished":"2023-08-02T16:30:00+02:00","dateModified":"2023-08-02T14:06:44+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/#webpage"},"isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/#webpage"},"articleSection":"immoNews, Bauarbeiten, Bauwesen, Ferien, Immoinvest, immoNews, Instandhaltung, Lift, Rollstuhlzug\u00e4nglich, Schulanlage, Singsaal, Toiletten, Turnhalle, Unterhaltsarbeit, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.immo-invest.ch\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/immonews\/#listItem","name":"immoNews"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/immonews\/#listItem","position":2,"name":"immoNews","item":"https:\/\/www.immo-invest.ch\/en\/category\/immonews\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/#listItem","name":"Hofacker school complex to be renovated during the holidays"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/#listItem","position":3,"name":"Hofacker school complex to be renovated during the holidays","previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/immonews\/#listItem","name":"immoNews"}}]},{"@type":"Organization","@id":"https:\/\/www.immo-invest.ch\/en\/#organization","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","url":"https:\/\/www.immo-invest.ch\/en\/","email":"admin@immomedia.ag","telephone":"+41444420002","logo":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/09\/immoinvest_sm-scaled.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/#organizationLogo","width":2560,"height":1340},"image":{"@id":"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","https:\/\/x.com\/i\/flow\/login?redirect_after_login=immoinvest_ch","https:\/\/www.instagram.com\/immoinvest_ch\/","https:\/\/www.linkedin.com\/company\/immoinvest-swiss"]},{"@type":"Person","@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author","url":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/","name":"immovestuser","image":{"@type":"ImageObject","@id":"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g","width":96,"height":96,"caption":"immovestuser"}},{"@type":"WebPage","@id":"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/#webpage","url":"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/","name":"Hofacker school complex to be renovated during the holidays - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Construction work on the Hofacker school complex began on 17 July. The first step will be to install a handicapped-accessible lift and wheelchair-accessible toilets. All construction work is to be carried out during the school holidays.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/#breadcrumblist"},"author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"creator":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2021\/04\/bauen-17.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/#mainImage","width":1200,"height":628},"primaryImageOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/#mainImage"},"datePublished":"2023-08-02T16:30:00+02:00","dateModified":"2023-08-02T14:06:44+02:00"},{"@type":"WebSite","@id":"https:\/\/www.immo-invest.ch\/en\/#website","url":"https:\/\/www.immo-invest.ch\/en\/","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien","og:type":"article","og:title":"Hofacker school complex to be renovated during the holidays - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","og:description":"Construction work on the Hofacker school complex began on 17 July. The first step will be to install a handicapped-accessible lift and wheelchair-accessible toilets. All construction work is to be carried out during the school holidays.","og:url":"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/","og:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2021\/04\/bauen-17.jpg","og:image:secure_url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2021\/04\/bauen-17.jpg","og:image:width":1200,"og:image:height":628,"article:published_time":"2023-08-02T14:30:00+00:00","article:modified_time":"2023-08-02T12:06:44+00:00","article:publisher":"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","twitter:card":"summary_large_image","twitter:site":"@i","twitter:title":"Hofacker school complex to be renovated during the holidays - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","twitter:description":"Construction work on the Hofacker school complex began on 17 July. The first step will be to install a handicapped-accessible lift and wheelchair-accessible toilets. All construction work is to be carried out during the school holidays.","twitter:creator":"@i","twitter:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2021\/04\/bauen-17.jpg"},"aioseo_meta_data":{"post_id":"60984","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-09-20 07:56:53","updated":"2025-10-23 13:48:15","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/immonews\/\" title=\"immoNews\">immoNews<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tHofacker school complex to be renovated during the holidays\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.immo-invest.ch\/en\/"},{"label":"immoNews","link":"https:\/\/www.immo-invest.ch\/en\/category\/immonews\/"},{"label":"Hofacker school complex to be renovated during the holidays","link":"https:\/\/www.immo-invest.ch\/en\/hofacker-school-complex-to-be-renovated-during-the-holidays\/"}],"featured_image_src":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2021\/04\/bauen-17-150x150.jpg","_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/60984","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=60984"}],"version-history":[{"count":0,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/60984\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/21441"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=60984"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=60984"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=60984"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}