{"id":55729,"date":"2023-05-16T11:48:54","date_gmt":"2023-05-16T09:48:54","guid":{"rendered":"https:\/\/www.immo-invest.ch\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/"},"modified":"2023-05-16T12:00:31","modified_gmt":"2023-05-16T10:00:31","slug":"zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel","status":"publish","type":"post","link":"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/","title":{"rendered":"Second tube of the Gotthard tunnel: first tunnel boring machine &#8220;Carla&#8221; at its destination"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Sometimes Carla, with her followers more than 200 m long, came slowly, sometimes much faster than planned, depending on the nature of the rock. On average, Carla covered about 17 m per day. Her record performance is 45.4 m per day, achieved in rather soft gneiss.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>TUNNEL CONSTRUCTION IS TEAMWORK<br><\/strong>&#8220;It&#8217;s great that we were able to excavate the northern access tunnel on time and, above all, without any significant accidents,&#8221; says Jacopo Cheda, head of northern construction at FEDRO. Xavier von Mandach, Implenia&#8217;s site manager in charge, emphasises the good cooperation: &#8220;Tunnel construction is always teamwork. Our team, consisting of several companies and colleagues from many nations, has a great deal of experience and works in a highly professional manner. Together we were able to successfully master the technical challenges and reach this important milestone without incident. The team did a great job.&#8221;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>WHAT&#8217;S NEXT<br><\/strong>The excavation of the access tunnel, which runs parallel to the future second tunnel tube, also provided important findings for the other construction work that will be carried out in the future, which are important for Carla&#8217;s &#8220;big sister&#8221;, which will excavate the northern section of the main tube from 2025.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In August 2022, FEDRO awarded the &#8220;secondo tubo&#8221; consortium with Implenia (60%) and Frutiger (40%) the contract for the northern main lot (Lot 241) of the second tube of the Gotthard road tunnel. The construction period for the 7.9 km long tunnel section up to the lot boundary in the middle of the tunnel is scheduled until 2029.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The construction of the second tube will be driven simultaneously from the north and from the south. A total of four TBMs will be used for this: two smaller ones (Carla and Delia) for the two access tunnels and the two large ones with a shield diameter of over twelve metres for the main tunnel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Source: <a href=\"https:\/\/implenia.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">implenia.com<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Important milestone in the construction of the second Gotthard tube: With its cutting wheel with a diameter of more than seven metres, tunnel boring machine &#8220;Carla&#8221; has been driving the access tunnel to the north fault zone into the Gotthard massif since August 2022. 3,950 m deep in the mountain, Carla arrived at its destination on 23 April 2023. A team of 120 people from the Implenia-led consortium &#8220;secondo tubo&#8221; (Implenia 40%, webuild &#038; CSC SA 40%, Frutiger AG 20%) Lot 243 had worked around the clock for this, in three shifts and without accidents. Together they excavated around 370,000 t of rock for the client, the Federal Roads Office FEDRO. <\/p>\n","protected":false},"author":2,"featured_media":55724,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"pmpro_default_level":"","_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[22358],"tags":[14421,13231,12533,38819,38820,20295,38821,38822,38823,38824,14776,12955,16567,38825,38826,32882,38827,20354,38828,28620,38829],"class_list":["post-55729","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","tag-arge-en","tag-astra-it-en","tag-bau-en","tag-bauherrschaft-en","tag-berg-en","tag-bundesamt-en","tag-carla-en","tag-durchmesser-en","tag-gestein-en","tag-gotthardmassiv-en","tag-gotthardroehre-en","tag-implenia-en","tag-meilenstein-en","tag-schichten-en","tag-schneidrad-en","tag-secondo-tubo-en","tag-stoerzone-en","tag-strassen-en","tag-tunnelbohrmaschine-en","tag-ziel-2-en","tag-zugangsstollen-en","pmpro-has-access"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"Important milestone in the construction of the second Gotthard tube: With its cutting wheel with a diameter of more than seven metres, tunnel boring machine \"Carla\" has been driving the access tunnel to the north fault zone into the Gotthard massif since August 2022. 3,950 m deep in the mountain, Carla arrived at its destination on 23 April 2023. A team of 120 people from the Implenia-led consortium \"secondo tubo\" (Implenia 40%, webuild & CSC SA 40%, Frutiger AG 20%) Lot 243 had worked around the clock for this, in three shifts and without accidents. Together they excavated around 370,000 t of rock for the client, the Federal Roads Office FEDRO. ","autor":"","ort":"","bildunterschrift":"","zusammenfassung":"","bild_im_grid":false,"gallerie":"","newsim":""},"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Important milestone in the construction of the second Gotthard tube: With its cutting wheel with a diameter of more than seven metres, tunnel boring machine &quot;Carla&quot; has been driving the access tunnel to the north fault zone into the Gotthard massif since August 2022. 3,950 m deep in the mountain, Carla arrived at its destination on 23 April 2023. A team of 120 people from the Implenia-led consortium &quot;secondo tubo&quot; (Implenia 40%, webuild &amp; CSC SA 40%, Frutiger AG 20%) Lot 243 had worked around the clock for this, in three shifts and without accidents. Together they excavated around 370,000 t of rock for the client, the Federal Roads Office FEDRO.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"immovestuser\"\/>\n\t<meta name=\"google-site-verification\" content=\"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Second tube of the Gotthard tunnel: first tunnel boring machine \u201cCarla\u201d at its destination - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:description\" content=\"Important milestone in the construction of the second Gotthard tube: With its cutting wheel with a diameter of more than seven metres, tunnel boring machine &quot;Carla&quot; has been driving the access tunnel to the north fault zone into the Gotthard massif since August 2022. 3,950 m deep in the mountain, Carla arrived at its destination on 23 April 2023. A team of 120 people from the Implenia-led consortium &quot;secondo tubo&quot; (Implenia 40%, webuild &amp; CSC SA 40%, Frutiger AG 20%) Lot 243 had worked around the clock for this, in three shifts and without accidents. Together they excavated around 370,000 t of rock for the client, the Federal Roads Office FEDRO.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/05\/csm_20220818_ASTRA_2TG_4__1__b1d79d51ca.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/05\/csm_20220818_ASTRA_2TG_4__1__b1d79d51ca.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1800\" \/>\n\t\t<meta property=\"og:image:height\" content=\"1011\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-05-16T09:48:54+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2023-05-16T10:00:31+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Second tube of the Gotthard tunnel: first tunnel boring machine \u201cCarla\u201d at its destination - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Important milestone in the construction of the second Gotthard tube: With its cutting wheel with a diameter of more than seven metres, tunnel boring machine &quot;Carla&quot; has been driving the access tunnel to the north fault zone into the Gotthard massif since August 2022. 3,950 m deep in the mountain, Carla arrived at its destination on 23 April 2023. A team of 120 people from the Implenia-led consortium &quot;secondo tubo&quot; (Implenia 40%, webuild &amp; CSC SA 40%, Frutiger AG 20%) Lot 243 had worked around the clock for this, in three shifts and without accidents. Together they excavated around 370,000 t of rock for the client, the Federal Roads Office FEDRO.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/05\/csm_20220818_ASTRA_2TG_4__1__b1d79d51ca.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\\\/#blogposting\",\"name\":\"Second tube of the Gotthard tunnel: first tunnel boring machine \\u201cCarla\\u201d at its destination - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"headline\":\"Second tube of the Gotthard tunnel: first tunnel boring machine &#8220;Carla&#8221; at its destination\",\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/csm_20220818_ASTRA_2TG_4__1__b1d79d51ca.jpg\",\"width\":1800,\"height\":1011},\"datePublished\":\"2023-05-16T11:48:54+02:00\",\"dateModified\":\"2023-05-16T12:00:31+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\\\/#webpage\"},\"articleSection\":\"Construction, ARGE, ASTRA, Bau, Bauherrschaft, Berg, bundesamt, Carla, Durchmesser, Gestein, Gotthardmassiv, Gotthardr\\u00f6hre, implenia, Meilenstein, Schichten, Schneidrad, secondo tubo, St\\u00f6rzone, Strassen, Tunnelbohrmaschine, Ziel, Zugangsstollen, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/#listItem\",\"name\":\"Trends\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/#listItem\",\"position\":2,\"name\":\"Trends\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/construction\\\/#listItem\",\"name\":\"Construction\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/construction\\\/#listItem\",\"position\":3,\"name\":\"Construction\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/construction\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\\\/#listItem\",\"name\":\"Second tube of the Gotthard tunnel: first tunnel boring machine &#8220;Carla&#8221; at its destination\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/#listItem\",\"name\":\"Trends\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\\\/#listItem\",\"position\":4,\"name\":\"Second tube of the Gotthard tunnel: first tunnel boring machine &#8220;Carla&#8221; at its destination\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/construction\\\/#listItem\",\"name\":\"Construction\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"email\":\"admin@immomedia.ag\",\"telephone\":\"+41444420002\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/immoinvest_sm-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\\\/#organizationLogo\",\"width\":2560,\"height\":1340},\"image\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Immoinvest\\\/100077962920504\\\/\",\"https:\\\/\\\/x.com\\\/i\\\/flow\\\/login?redirect_after_login=immoinvest_ch\",\"https:\\\/\\\/www.instagram.com\\\/immoinvest_ch\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/immoinvest-swiss\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/\",\"name\":\"immovestuser\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"immovestuser\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\\\/#webpage\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\\\/\",\"name\":\"Second tube of the Gotthard tunnel: first tunnel boring machine \\u201cCarla\\u201d at its destination - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Important milestone in the construction of the second Gotthard tube: With its cutting wheel with a diameter of more than seven metres, tunnel boring machine \\\"Carla\\\" has been driving the access tunnel to the north fault zone into the Gotthard massif since August 2022. 3,950 m deep in the mountain, Carla arrived at its destination on 23 April 2023. A team of 120 people from the Implenia-led consortium \\\"secondo tubo\\\" (Implenia 40%, webuild & CSC SA 40%, Frutiger AG 20%) Lot 243 had worked around the clock for this, in three shifts and without accidents. Together they excavated around 370,000 t of rock for the client, the Federal Roads Office FEDRO.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/csm_20220818_ASTRA_2TG_4__1__b1d79d51ca.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\\\/#mainImage\",\"width\":1800,\"height\":1011},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\\\/#mainImage\"},\"datePublished\":\"2023-05-16T11:48:54+02:00\",\"dateModified\":\"2023-05-16T12:00:31+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Second tube of the Gotthard tunnel: first tunnel boring machine \u201cCarla\u201d at its destination - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Important milestone in the construction of the second Gotthard tube: With its cutting wheel with a diameter of more than seven metres, tunnel boring machine \"Carla\" has been driving the access tunnel to the north fault zone into the Gotthard massif since August 2022. 3,950 m deep in the mountain, Carla arrived at its destination on 23 April 2023. A team of 120 people from the Implenia-led consortium \"secondo tubo\" (Implenia 40%, webuild & CSC SA 40%, Frutiger AG 20%) Lot 243 had worked around the clock for this, in three shifts and without accidents. Together they excavated around 370,000 t of rock for the client, the Federal Roads Office FEDRO.","canonical_url":"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/#blogposting","name":"Second tube of the Gotthard tunnel: first tunnel boring machine \u201cCarla\u201d at its destination - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","headline":"Second tube of the Gotthard tunnel: first tunnel boring machine &#8220;Carla&#8221; at its destination","author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/05\/csm_20220818_ASTRA_2TG_4__1__b1d79d51ca.jpg","width":1800,"height":1011},"datePublished":"2023-05-16T11:48:54+02:00","dateModified":"2023-05-16T12:00:31+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/#webpage"},"isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/#webpage"},"articleSection":"Construction, ARGE, ASTRA, Bau, Bauherrschaft, Berg, bundesamt, Carla, Durchmesser, Gestein, Gotthardmassiv, Gotthardr\u00f6hre, implenia, Meilenstein, Schichten, Schneidrad, secondo tubo, St\u00f6rzone, Strassen, Tunnelbohrmaschine, Ziel, Zugangsstollen, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.immo-invest.ch\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/#listItem","name":"Trends"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/#listItem","position":2,"name":"Trends","item":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/construction\/#listItem","name":"Construction"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/construction\/#listItem","position":3,"name":"Construction","item":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/construction\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/#listItem","name":"Second tube of the Gotthard tunnel: first tunnel boring machine &#8220;Carla&#8221; at its destination"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/#listItem","name":"Trends"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/#listItem","position":4,"name":"Second tube of the Gotthard tunnel: first tunnel boring machine &#8220;Carla&#8221; at its destination","previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/construction\/#listItem","name":"Construction"}}]},{"@type":"Organization","@id":"https:\/\/www.immo-invest.ch\/en\/#organization","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","url":"https:\/\/www.immo-invest.ch\/en\/","email":"admin@immomedia.ag","telephone":"+41444420002","logo":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/09\/immoinvest_sm-scaled.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/#organizationLogo","width":2560,"height":1340},"image":{"@id":"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","https:\/\/x.com\/i\/flow\/login?redirect_after_login=immoinvest_ch","https:\/\/www.instagram.com\/immoinvest_ch\/","https:\/\/www.linkedin.com\/company\/immoinvest-swiss"]},{"@type":"Person","@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author","url":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/","name":"immovestuser","image":{"@type":"ImageObject","@id":"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g","width":96,"height":96,"caption":"immovestuser"}},{"@type":"WebPage","@id":"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/#webpage","url":"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/","name":"Second tube of the Gotthard tunnel: first tunnel boring machine \u201cCarla\u201d at its destination - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Important milestone in the construction of the second Gotthard tube: With its cutting wheel with a diameter of more than seven metres, tunnel boring machine \"Carla\" has been driving the access tunnel to the north fault zone into the Gotthard massif since August 2022. 3,950 m deep in the mountain, Carla arrived at its destination on 23 April 2023. A team of 120 people from the Implenia-led consortium \"secondo tubo\" (Implenia 40%, webuild & CSC SA 40%, Frutiger AG 20%) Lot 243 had worked around the clock for this, in three shifts and without accidents. Together they excavated around 370,000 t of rock for the client, the Federal Roads Office FEDRO.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/#breadcrumblist"},"author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"creator":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/05\/csm_20220818_ASTRA_2TG_4__1__b1d79d51ca.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/#mainImage","width":1800,"height":1011},"primaryImageOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/#mainImage"},"datePublished":"2023-05-16T11:48:54+02:00","dateModified":"2023-05-16T12:00:31+02:00"},{"@type":"WebSite","@id":"https:\/\/www.immo-invest.ch\/en\/#website","url":"https:\/\/www.immo-invest.ch\/en\/","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien","og:type":"article","og:title":"Second tube of the Gotthard tunnel: first tunnel boring machine \u201cCarla\u201d at its destination - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","og:description":"Important milestone in the construction of the second Gotthard tube: With its cutting wheel with a diameter of more than seven metres, tunnel boring machine &quot;Carla&quot; has been driving the access tunnel to the north fault zone into the Gotthard massif since August 2022. 3,950 m deep in the mountain, Carla arrived at its destination on 23 April 2023. A team of 120 people from the Implenia-led consortium &quot;secondo tubo&quot; (Implenia 40%, webuild &amp; CSC SA 40%, Frutiger AG 20%) Lot 243 had worked around the clock for this, in three shifts and without accidents. Together they excavated around 370,000 t of rock for the client, the Federal Roads Office FEDRO.","og:url":"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/","og:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/05\/csm_20220818_ASTRA_2TG_4__1__b1d79d51ca.jpg","og:image:secure_url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/05\/csm_20220818_ASTRA_2TG_4__1__b1d79d51ca.jpg","og:image:width":1800,"og:image:height":1011,"article:published_time":"2023-05-16T09:48:54+00:00","article:modified_time":"2023-05-16T10:00:31+00:00","article:publisher":"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","twitter:card":"summary_large_image","twitter:site":"@i","twitter:title":"Second tube of the Gotthard tunnel: first tunnel boring machine \u201cCarla\u201d at its destination - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","twitter:description":"Important milestone in the construction of the second Gotthard tube: With its cutting wheel with a diameter of more than seven metres, tunnel boring machine &quot;Carla&quot; has been driving the access tunnel to the north fault zone into the Gotthard massif since August 2022. 3,950 m deep in the mountain, Carla arrived at its destination on 23 April 2023. A team of 120 people from the Implenia-led consortium &quot;secondo tubo&quot; (Implenia 40%, webuild &amp; CSC SA 40%, Frutiger AG 20%) Lot 243 had worked around the clock for this, in three shifts and without accidents. Together they excavated around 370,000 t of rock for the client, the Federal Roads Office FEDRO.","twitter:creator":"@i","twitter:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/05\/csm_20220818_ASTRA_2TG_4__1__b1d79d51ca.jpg"},"aioseo_meta_data":{"post_id":"55729","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-09-20 04:50:50","updated":"2025-10-23 10:42:12","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/\" title=\"Trends\">Trends<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/construction\/\" title=\"Construction\">Construction<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tSecond tube of the Gotthard tunnel: first tunnel boring machine \u201cCarla\u201d at its destination\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.immo-invest.ch\/en\/"},{"label":"Trends","link":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/"},{"label":"Construction","link":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/construction\/"},{"label":"Second tube of the Gotthard tunnel: first tunnel boring machine &#8220;Carla&#8221; at its destination","link":"https:\/\/www.immo-invest.ch\/en\/zweite-roehre-gotthard-tunnel-erste-tunnelbohrmaschine-carla-am-ziel\/"}],"featured_image_src":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/05\/csm_20220818_ASTRA_2TG_4__1__b1d79d51ca-336x168.jpg","_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/55729","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=55729"}],"version-history":[{"count":0,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/55729\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/55724"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=55729"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=55729"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=55729"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}