{"id":40458,"date":"2022-06-27T12:00:00","date_gmt":"2022-06-27T10:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=40458"},"modified":"2022-06-24T10:34:01","modified_gmt":"2022-06-24T08:34:01","slug":"new-nest-unit-sprint-demolition-departure-breakthrough","status":"publish","type":"post","link":"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/","title":{"rendered":"New NEST unit sprint: demolition, departure, breakthrough"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The new NEST unit Sprint offers 200 square meters of office space made mostly from reused materials and components. Partitions made of different materials that can be flexibly removed divide the office unit into twelve individual offices. The unit was built on the lowest platform of the NEST building, the research and innovation platform of Empa and Eawag. It took only ten months from the ground-breaking ceremony to the opening.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> The entire sprint unit follows the &#8220;Design for Disassembly&#8221; approach. Their design already takes dismantling into account, and their construction facilitates future modifications and dismantling to recover components and materials. In this way, the premises can be efficiently transferred to another cycle at the end of their service life.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> The sprint unit wants to find solutions that are as universal as possible and thus simplify the reuse of building materials. The project is a collaboration between various actors from research, business and the public sector. During the construction and subsequent use of Sprint, the opportunities and challenges of the reuse process are continuously documented and compiled &#8211; with the aim of making the construction more marketable. The sprint unit shows that building with reused materials and components is a viable alternative to building with new material that meets the market requirements for flexible and fast building.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> Building with reused materials is a step-by-step approach &#8211; the issue of available materials runs through the whole process. This requires, among other things, a rethinking of planning and execution, a flexible schedule and flexibility in design. For example, the material found also determines the final design. Sprint shows &#8220;that reused material is by no means a hurdle for the design, but that creativity can be used to achieve design elements that you would not have originally thought of,&#8221; says Oliver Seidel, architect and member of the management board at baub\u00fcro in situ AG. An example are the different partition walls. Some are built from scrap bricks, some from old books, and still others from old carpet.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> The reuse of materials is not necessarily cheaper in today&#8217;s market situation. However, Seidel is convinced: &#8220;As soon as a competitive market with reused materials and components has been established, there will also be cost advantages with reuse.&#8221; In addition, certain reused materials such as natural stone or automatically closing fire protection doors would suddenly become affordable, in contrast to the same components made of new material.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"480\" src=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_07-960x480.jpg\" alt=\"\" class=\"wp-image-40446\" srcset=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_07-960x480.jpg 960w, https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_07-600x300.jpg 600w, https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_07-692x346.jpg 692w, https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_07-336x168.jpg 336w, https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_07-768x384.jpg 768w, https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_07.jpg 1000w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><figcaption> One of the office partitions in the sprint unit is made of bricks that would actually have ended up as waste in the landfill. <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"480\" src=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_01-960x480.jpg\" alt=\"\" class=\"wp-image-40450\" srcset=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_01-960x480.jpg 960w, https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_01-600x300.jpg 600w, https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_01-692x346.jpg 692w, https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_01-336x168.jpg 336w, https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_01-768x384.jpg 768w, https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_01.jpg 1000w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><figcaption> The sprint unit was completed in just ten months &#8211; re-use does not necessarily have to have an impact on the construction time.<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>In der Forschungs- und Innovationsplattform NEST wurde im August 2021 die Unit Sprint er\u00f6ffnet. Die Unit demonstriert, dass das Bauen mit wiederverwendeten Materialien den Marktanforderungen gerecht wird und zu kreativen L\u00f6sungen f\u00fchren kann.<\/p>\n","protected":false},"author":2,"featured_media":40443,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"pmpro_default_level":"","_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[12489,22698,12493],"tags":[29521,29522,12573,12525,12526,29523,12528,29524,29525],"class_list":["post-40458","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-new-construction","category-sustainability","category-region-zurich-en","tag-baubuero-in-situ-ag-en","tag-design-for-disassembly-en","tag-eawag-en","tag-immoinvest-en","tag-immonews-en","tag-nest-unit-sprint-en","tag-news-en","tag-oliver-seidel-en","tag-re-use-prozess-en","pmpro-has-access"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"The Sprint unit was opened in the NEST research and innovation platform in August 2021. The unit demonstrates that building with reused materials meets market requirements and can lead to creative solutions.","autor":"Text: Antonia Janina Fischer, Bilder: Martin Zeller","ort":"Z\u00fcrich","bildunterschrift":"","zusammenfassung":"","bild_im_grid":false,"gallerie":"","newsim":""},"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"In der Forschungs- und Innovationsplattform NEST wurde im August 2021 die Unit Sprint er\u00f6ffnet. Die Unit demonstriert, dass das Bauen mit wiederverwendeten Materialien den Marktanforderungen gerecht wird und zu kreativen L\u00f6sungen f\u00fchren kann.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"immovestuser\"\/>\n\t<meta name=\"google-site-verification\" content=\"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"New NEST unit sprint: demolition, departure, breakthrough - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:description\" content=\"In der Forschungs- und Innovationsplattform NEST wurde im August 2021 die Unit Sprint er\u00f6ffnet. Die Unit demonstriert, dass das Bauen mit wiederverwendeten Materialien den Marktanforderungen gerecht wird und zu kreativen L\u00f6sungen f\u00fchren kann.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_12.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_12.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2022-06-27T10:00:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2022-06-24T08:34:01+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:title\" content=\"New NEST unit sprint: demolition, departure, breakthrough - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta name=\"twitter:description\" content=\"In der Forschungs- und Innovationsplattform NEST wurde im August 2021 die Unit Sprint er\u00f6ffnet. Die Unit demonstriert, dass das Bauen mit wiederverwendeten Materialien den Marktanforderungen gerecht wird und zu kreativen L\u00f6sungen f\u00fchren kann.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_12.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/new-nest-unit-sprint-demolition-departure-breakthrough\\\/#blogposting\",\"name\":\"New NEST unit sprint: demolition, departure, breakthrough - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"headline\":\"New NEST unit sprint: demolition, departure, breakthrough\",\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/Sprint_12.jpg\",\"width\":1000,\"height\":500},\"datePublished\":\"2022-06-27T12:00:00+02:00\",\"dateModified\":\"2022-06-24T10:34:01+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/new-nest-unit-sprint-demolition-departure-breakthrough\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/new-nest-unit-sprint-demolition-departure-breakthrough\\\/#webpage\"},\"articleSection\":\"New construction, Sustainability, Zurich, baub\\u00fcro in situ AG, Design for Disassembly, Eawag, Immoinvest, immoNews, NEST-Unit Sprint, News, Oliver Seidel, Re-Use-Prozess, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/new-nest-unit-sprint-demolition-departure-breakthrough\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"position\":2,\"name\":\"Regions\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"position\":3,\"name\":\"Switzerland\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zurich-en\\\/#listItem\",\"name\":\"Zurich\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zurich-en\\\/#listItem\",\"position\":4,\"name\":\"Zurich\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zurich-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/new-nest-unit-sprint-demolition-departure-breakthrough\\\/#listItem\",\"name\":\"New NEST unit sprint: demolition, departure, breakthrough\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/new-nest-unit-sprint-demolition-departure-breakthrough\\\/#listItem\",\"position\":5,\"name\":\"New NEST unit sprint: demolition, departure, breakthrough\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zurich-en\\\/#listItem\",\"name\":\"Zurich\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"email\":\"admin@immomedia.ag\",\"telephone\":\"+41444420002\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/immoinvest_sm-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/new-nest-unit-sprint-demolition-departure-breakthrough\\\/#organizationLogo\",\"width\":2560,\"height\":1340},\"image\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/new-nest-unit-sprint-demolition-departure-breakthrough\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Immoinvest\\\/100077962920504\\\/\",\"https:\\\/\\\/x.com\\\/i\\\/flow\\\/login?redirect_after_login=immoinvest_ch\",\"https:\\\/\\\/www.instagram.com\\\/immoinvest_ch\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/immoinvest-swiss\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/\",\"name\":\"immovestuser\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/new-nest-unit-sprint-demolition-departure-breakthrough\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"immovestuser\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/new-nest-unit-sprint-demolition-departure-breakthrough\\\/#webpage\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/new-nest-unit-sprint-demolition-departure-breakthrough\\\/\",\"name\":\"New NEST unit sprint: demolition, departure, breakthrough - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"In der Forschungs- und Innovationsplattform NEST wurde im August 2021 die Unit Sprint er\\u00f6ffnet. Die Unit demonstriert, dass das Bauen mit wiederverwendeten Materialien den Marktanforderungen gerecht wird und zu kreativen L\\u00f6sungen f\\u00fchren kann.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/new-nest-unit-sprint-demolition-departure-breakthrough\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/Sprint_12.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/new-nest-unit-sprint-demolition-departure-breakthrough\\\/#mainImage\",\"width\":1000,\"height\":500},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/new-nest-unit-sprint-demolition-departure-breakthrough\\\/#mainImage\"},\"datePublished\":\"2022-06-27T12:00:00+02:00\",\"dateModified\":\"2022-06-24T10:34:01+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"New NEST unit sprint: demolition, departure, breakthrough - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"In der Forschungs- und Innovationsplattform NEST wurde im August 2021 die Unit Sprint er\u00f6ffnet. Die Unit demonstriert, dass das Bauen mit wiederverwendeten Materialien den Marktanforderungen gerecht wird und zu kreativen L\u00f6sungen f\u00fchren kann.","canonical_url":"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/#blogposting","name":"New NEST unit sprint: demolition, departure, breakthrough - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","headline":"New NEST unit sprint: demolition, departure, breakthrough","author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_12.jpg","width":1000,"height":500},"datePublished":"2022-06-27T12:00:00+02:00","dateModified":"2022-06-24T10:34:01+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/#webpage"},"isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/#webpage"},"articleSection":"New construction, Sustainability, Zurich, baub\u00fcro in situ AG, Design for Disassembly, Eawag, Immoinvest, immoNews, NEST-Unit Sprint, News, Oliver Seidel, Re-Use-Prozess, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.immo-invest.ch\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","position":2,"name":"Regions","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","position":3,"name":"Switzerland","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/#listItem","name":"Zurich"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/#listItem","position":4,"name":"Zurich","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/#listItem","name":"New NEST unit sprint: demolition, departure, breakthrough"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/#listItem","position":5,"name":"New NEST unit sprint: demolition, departure, breakthrough","previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/#listItem","name":"Zurich"}}]},{"@type":"Organization","@id":"https:\/\/www.immo-invest.ch\/en\/#organization","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","url":"https:\/\/www.immo-invest.ch\/en\/","email":"admin@immomedia.ag","telephone":"+41444420002","logo":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/09\/immoinvest_sm-scaled.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/#organizationLogo","width":2560,"height":1340},"image":{"@id":"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","https:\/\/x.com\/i\/flow\/login?redirect_after_login=immoinvest_ch","https:\/\/www.instagram.com\/immoinvest_ch\/","https:\/\/www.linkedin.com\/company\/immoinvest-swiss"]},{"@type":"Person","@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author","url":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/","name":"immovestuser","image":{"@type":"ImageObject","@id":"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g","width":96,"height":96,"caption":"immovestuser"}},{"@type":"WebPage","@id":"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/#webpage","url":"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/","name":"New NEST unit sprint: demolition, departure, breakthrough - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"In der Forschungs- und Innovationsplattform NEST wurde im August 2021 die Unit Sprint er\u00f6ffnet. Die Unit demonstriert, dass das Bauen mit wiederverwendeten Materialien den Marktanforderungen gerecht wird und zu kreativen L\u00f6sungen f\u00fchren kann.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/#breadcrumblist"},"author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"creator":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_12.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/#mainImage","width":1000,"height":500},"primaryImageOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/#mainImage"},"datePublished":"2022-06-27T12:00:00+02:00","dateModified":"2022-06-24T10:34:01+02:00"},{"@type":"WebSite","@id":"https:\/\/www.immo-invest.ch\/en\/#website","url":"https:\/\/www.immo-invest.ch\/en\/","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien","og:type":"article","og:title":"New NEST unit sprint: demolition, departure, breakthrough - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","og:description":"In der Forschungs- und Innovationsplattform NEST wurde im August 2021 die Unit Sprint er\u00f6ffnet. Die Unit demonstriert, dass das Bauen mit wiederverwendeten Materialien den Marktanforderungen gerecht wird und zu kreativen L\u00f6sungen f\u00fchren kann.","og:url":"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/","og:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_12.jpg","og:image:secure_url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_12.jpg","og:image:width":1000,"og:image:height":500,"article:published_time":"2022-06-27T10:00:00+00:00","article:modified_time":"2022-06-24T08:34:01+00:00","article:publisher":"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","twitter:card":"summary_large_image","twitter:site":"@i","twitter:title":"New NEST unit sprint: demolition, departure, breakthrough - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","twitter:description":"In der Forschungs- und Innovationsplattform NEST wurde im August 2021 die Unit Sprint er\u00f6ffnet. Die Unit demonstriert, dass das Bauen mit wiederverwendeten Materialien den Marktanforderungen gerecht wird und zu kreativen L\u00f6sungen f\u00fchren kann.","twitter:creator":"@i","twitter:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_12.jpg"},"aioseo_meta_data":{"post_id":"40458","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-09-19 17:49:47","updated":"2025-10-22 23:26:16","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/\" title=\"Regions\">Regions<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/\" title=\"Switzerland\">Switzerland<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/\" title=\"Zurich\">Zurich<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tNew NEST unit sprint: demolition, departure, breakthrough\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.immo-invest.ch\/en\/"},{"label":"Regions","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/"},{"label":"Switzerland","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/"},{"label":"Zurich","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/"},{"label":"New NEST unit sprint: demolition, departure, breakthrough","link":"https:\/\/www.immo-invest.ch\/en\/new-nest-unit-sprint-demolition-departure-breakthrough\/"}],"featured_image_src":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/06\/Sprint_12-336x168.jpg","_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/40458","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=40458"}],"version-history":[{"count":0,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/40458\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/40443"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=40458"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=40458"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=40458"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}