{"id":29416,"date":"2020-10-29T17:00:00","date_gmt":"2020-10-29T16:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/stellwerk-2-am-puls-der-zeit\/"},"modified":"2022-01-03T16:09:20","modified_gmt":"2022-01-03T15:09:20","slug":"stellwerk-2-am-puls-der-zeit","status":"publish","type":"post","link":"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/","title":{"rendered":"&quot;Stellwerk 2&quot;: In tune with the times"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The first stage, the \u201cStellwerk 1\u201d office building, was completed in 2010 right next to the historic station building. In addition, the elongated property between the tracks and the station square remained in an exposed location, next to the W\u00fclflingerstrasse underpass. The new &quot;Stellwerk 2&quot; building will be built on this centrally located open space, on which the SBB staff restaurant was formerly located and which houses an underground signal box that is to be preserved. The area forms the north-eastern end of a high-quality urban space that has undergone significant changes in recent years, emphasizes the team of architects. A new building in this exposed location will be very easy to see from many sides, which underlines its importance as an important building block in Winterthur&#39;s urban structure, according to the architects. &quot;Stellwerk 2&quot; is a mixed-use building with seventy apartments, two office floors, retail and catering areas on the ground floor and 500 bicycle parking spaces in the basement. \u25a0<\/p>","protected":false},"excerpt":{"rendered":"<p>The first stage, the \u201cStellwerk 1\u201d office building, was completed in 2010 right next to the historic station building. In addition, the elongated property between the tracks and the station square remained in an exposed location, next to the W\u00fclflingerstrasse underpass. The new &quot;Stellwerk 2&quot; building will be built on this centrally located open space, [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":29419,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"pmpro_default_level":"","_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[12489,12485,12487,12493],"tags":[19856,12894,19858,12558],"class_list":["post-29416","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-new-construction","category-projects-en","category-regions-en","category-region-zurich-en","tag-bahnhof-winterthur-en","tag-gza-en","tag-stellwerk2-en","tag-zuerich-en","pmpro-has-access"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"Immediately next to today&#39;s &quot;Stellwerk 1&quot;, the new &quot;Stellwerk 2&quot; building is being built at the northern end of Winterthur train station. If everything goes according to plan, the opening is planned for April 2024.","autor":"Text: Philipp Dreyer \/ Quelle: SBB \/ Visualisierungen: zVg","ort":"Kanton Z\u00fcrich","bildunterschrift":"","zusammenfassung":"","bild_im_grid":false,"gallerie":null,"newsim":""},"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"The first stage, the \u201cStellwerk 1\u201d office building, was completed in 2010 right next to the historic station building. In addition, the elongated property between the tracks and the station square remained in an exposed location, next to the W\u00fclflingerstrasse underpass. The new &quot;Stellwerk 2&quot; building will be built on this centrally located open space,\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"immovestuser\"\/>\n\t<meta name=\"google-site-verification\" content=\"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"&quot;Stellwerk 2&quot;: In tune with the times - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:description\" content=\"The first stage, the \u201cStellwerk 1\u201d office building, was completed in 2010 right next to the historic station building. In addition, the elongated property between the tracks and the station square remained in an exposed location, next to the W\u00fclflingerstrasse underpass. The new &quot;Stellwerk 2&quot; building will be built on this centrally located open space,\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/10\/3-winterthur-stellwerk.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/10\/3-winterthur-stellwerk.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t\t<meta property=\"og:image:height\" content=\"693\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2020-10-29T16:00:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2022-01-03T15:09:20+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:title\" content=\"&quot;Stellwerk 2&quot;: In tune with the times - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The first stage, the \u201cStellwerk 1\u201d office building, was completed in 2010 right next to the historic station building. In addition, the elongated property between the tracks and the station square remained in an exposed location, next to the W\u00fclflingerstrasse underpass. The new &quot;Stellwerk 2&quot; building will be built on this centrally located open space,\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/10\/3-winterthur-stellwerk.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/stellwerk-2-am-puls-der-zeit\\\/#blogposting\",\"name\":\"\\\"Stellwerk 2\\\": In tune with the times - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"headline\":\"&quot;Stellwerk 2&quot;: In tune with the times\",\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/3-winterthur-stellwerk.jpg\",\"width\":1920,\"height\":693},\"datePublished\":\"2020-10-29T17:00:00+01:00\",\"dateModified\":\"2022-01-03T16:09:20+01:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/stellwerk-2-am-puls-der-zeit\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/stellwerk-2-am-puls-der-zeit\\\/#webpage\"},\"articleSection\":\"New construction, Projects, Regions, Zurich, Bahnhof Winterthur, GZA, Stellwerk2, Z\\u00fcrich, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/stellwerk-2-am-puls-der-zeit\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"position\":2,\"name\":\"Regions\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"position\":3,\"name\":\"Switzerland\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zurich-en\\\/#listItem\",\"name\":\"Zurich\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zurich-en\\\/#listItem\",\"position\":4,\"name\":\"Zurich\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zurich-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/stellwerk-2-am-puls-der-zeit\\\/#listItem\",\"name\":\"&quot;Stellwerk 2&quot;: In tune with the times\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/stellwerk-2-am-puls-der-zeit\\\/#listItem\",\"position\":5,\"name\":\"&quot;Stellwerk 2&quot;: In tune with the times\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zurich-en\\\/#listItem\",\"name\":\"Zurich\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"email\":\"admin@immomedia.ag\",\"telephone\":\"+41444420002\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/immoinvest_sm-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/stellwerk-2-am-puls-der-zeit\\\/#organizationLogo\",\"width\":2560,\"height\":1340},\"image\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/stellwerk-2-am-puls-der-zeit\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Immoinvest\\\/100077962920504\\\/\",\"https:\\\/\\\/x.com\\\/i\\\/flow\\\/login?redirect_after_login=immoinvest_ch\",\"https:\\\/\\\/www.instagram.com\\\/immoinvest_ch\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/immoinvest-swiss\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/\",\"name\":\"immovestuser\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/stellwerk-2-am-puls-der-zeit\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"immovestuser\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/stellwerk-2-am-puls-der-zeit\\\/#webpage\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/stellwerk-2-am-puls-der-zeit\\\/\",\"name\":\"\\\"Stellwerk 2\\\": In tune with the times - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"The first stage, the \\u201cStellwerk 1\\u201d office building, was completed in 2010 right next to the historic station building. In addition, the elongated property between the tracks and the station square remained in an exposed location, next to the W\\u00fclflingerstrasse underpass. The new \\\"Stellwerk 2\\\" building will be built on this centrally located open space,\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/stellwerk-2-am-puls-der-zeit\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/3-winterthur-stellwerk.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/stellwerk-2-am-puls-der-zeit\\\/#mainImage\",\"width\":1920,\"height\":693},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/stellwerk-2-am-puls-der-zeit\\\/#mainImage\"},\"datePublished\":\"2020-10-29T17:00:00+01:00\",\"dateModified\":\"2022-01-03T16:09:20+01:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"\"Stellwerk 2\": In tune with the times - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"The first stage, the \u201cStellwerk 1\u201d office building, was completed in 2010 right next to the historic station building. In addition, the elongated property between the tracks and the station square remained in an exposed location, next to the W\u00fclflingerstrasse underpass. The new \"Stellwerk 2\" building will be built on this centrally located open space,","canonical_url":"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/#blogposting","name":"\"Stellwerk 2\": In tune with the times - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","headline":"&quot;Stellwerk 2&quot;: In tune with the times","author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/10\/3-winterthur-stellwerk.jpg","width":1920,"height":693},"datePublished":"2020-10-29T17:00:00+01:00","dateModified":"2022-01-03T16:09:20+01:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/#webpage"},"isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/#webpage"},"articleSection":"New construction, Projects, Regions, Zurich, Bahnhof Winterthur, GZA, Stellwerk2, Z\u00fcrich, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.immo-invest.ch\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","position":2,"name":"Regions","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","position":3,"name":"Switzerland","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/#listItem","name":"Zurich"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/#listItem","position":4,"name":"Zurich","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/#listItem","name":"&quot;Stellwerk 2&quot;: In tune with the times"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/#listItem","position":5,"name":"&quot;Stellwerk 2&quot;: In tune with the times","previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/#listItem","name":"Zurich"}}]},{"@type":"Organization","@id":"https:\/\/www.immo-invest.ch\/en\/#organization","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","url":"https:\/\/www.immo-invest.ch\/en\/","email":"admin@immomedia.ag","telephone":"+41444420002","logo":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/09\/immoinvest_sm-scaled.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/#organizationLogo","width":2560,"height":1340},"image":{"@id":"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","https:\/\/x.com\/i\/flow\/login?redirect_after_login=immoinvest_ch","https:\/\/www.instagram.com\/immoinvest_ch\/","https:\/\/www.linkedin.com\/company\/immoinvest-swiss"]},{"@type":"Person","@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author","url":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/","name":"immovestuser","image":{"@type":"ImageObject","@id":"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g","width":96,"height":96,"caption":"immovestuser"}},{"@type":"WebPage","@id":"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/#webpage","url":"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/","name":"\"Stellwerk 2\": In tune with the times - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"The first stage, the \u201cStellwerk 1\u201d office building, was completed in 2010 right next to the historic station building. In addition, the elongated property between the tracks and the station square remained in an exposed location, next to the W\u00fclflingerstrasse underpass. The new \"Stellwerk 2\" building will be built on this centrally located open space,","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/#breadcrumblist"},"author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"creator":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/10\/3-winterthur-stellwerk.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/#mainImage","width":1920,"height":693},"primaryImageOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/#mainImage"},"datePublished":"2020-10-29T17:00:00+01:00","dateModified":"2022-01-03T16:09:20+01:00"},{"@type":"WebSite","@id":"https:\/\/www.immo-invest.ch\/en\/#website","url":"https:\/\/www.immo-invest.ch\/en\/","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien","og:type":"article","og:title":"&quot;Stellwerk 2&quot;: In tune with the times - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","og:description":"The first stage, the \u201cStellwerk 1\u201d office building, was completed in 2010 right next to the historic station building. In addition, the elongated property between the tracks and the station square remained in an exposed location, next to the W\u00fclflingerstrasse underpass. The new &quot;Stellwerk 2&quot; building will be built on this centrally located open space,","og:url":"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/","og:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/10\/3-winterthur-stellwerk.jpg","og:image:secure_url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/10\/3-winterthur-stellwerk.jpg","og:image:width":1920,"og:image:height":693,"article:published_time":"2020-10-29T16:00:00+00:00","article:modified_time":"2022-01-03T15:09:20+00:00","article:publisher":"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","twitter:card":"summary_large_image","twitter:site":"@i","twitter:title":"&quot;Stellwerk 2&quot;: In tune with the times - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","twitter:description":"The first stage, the \u201cStellwerk 1\u201d office building, was completed in 2010 right next to the historic station building. In addition, the elongated property between the tracks and the station square remained in an exposed location, next to the W\u00fclflingerstrasse underpass. The new &quot;Stellwerk 2&quot; building will be built on this centrally located open space,","twitter:creator":"@i","twitter:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/10\/3-winterthur-stellwerk.jpg"},"aioseo_meta_data":{"post_id":"29416","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-09-19 10:28:52","updated":"2025-10-22 16:03:12","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/\" title=\"Regions\">Regions<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/\" title=\"Switzerland\">Switzerland<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/\" title=\"Zurich\">Zurich<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t\"Stellwerk 2\": In tune with the times\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.immo-invest.ch\/en\/"},{"label":"Regions","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/"},{"label":"Switzerland","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/"},{"label":"Zurich","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/"},{"label":"&quot;Stellwerk 2&quot;: In tune with the times","link":"https:\/\/www.immo-invest.ch\/en\/stellwerk-2-am-puls-der-zeit\/"}],"featured_image_src":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/10\/3-winterthur-stellwerk-150x150.jpg","_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/29416","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=29416"}],"version-history":[{"count":0,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/29416\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/29419"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=29416"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=29416"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=29416"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}