{"id":26829,"date":"2020-12-03T08:32:42","date_gmt":"2020-12-03T07:32:42","guid":{"rendered":"https:\/\/www.immo-invest.ch\/ceneri-basistunnel-erhaelt-gruenes-licht\/"},"modified":"2021-11-02T10:31:15","modified_gmt":"2021-11-02T09:31:15","slug":"ceneri-basistunnel-erhaelt-gruenes-licht","status":"publish","type":"post","link":"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/","title":{"rendered":"Ceneri Base Tunnel receives the green light"},"content":{"rendered":"<p class=\"bodytext\">The New Railway-Alpen-Transversale ( <a href=\"https:\/\/www.bav.admin.ch\/bav\/de\/home\/verkehrsmittel\/eisenbahn\/bahninfrastruktur\/ausbauprogramme\/neat.html\" target=\"_blank\" rel=\"noopener noreferrer\">NEAT<\/a> ) is largely completed. The Federal Office of Transport ( <a href=\"http:\/\/www.bav.admin.ch\" target=\"_blank\" rel=\"noopener noreferrer\">FOT<\/a> ) has issued the permit for the scheduled operation of the Ceneri base tunnel, it writes in a <a href=\"https:\/\/www.admin.ch\/gov\/de\/start\/dokumentation\/medienmitteilungen.msg-id-81417.html\" target=\"_blank\" rel=\"noopener noreferrer\">message<\/a> . This means that the tunnel will be available for scheduled passenger and freight trains from the timetable change on December 13th.<\/p>\n<p class=\"bodytext\"> The Ceneri Base Tunnel was inaugurated on September 4th. Since then, around 5,800 commercial passenger and freight trains have been run through the tunnel in a trial run.<\/p>\n<p class=\"bodytext\"> The 15 kilometer long tunnel is the third of the three large base tunnels that were built as part of the NEAT. It also enables direct connections between Lugano and Locarno. These form a central element of the Ticino S-Bahn.<\/p>\n<p class=\"bodytext\"> The L\u00f6tschberg Base Tunnel with a length of 35 kilometers was the first of the three large tunnels to go into operation in 2007, the Gotthard Base Tunnel with a length of 57 kilometers followed in 2016. The almost 20 kilometers long Simplon Tunnel has been in operation since 1906. Switzerland now has two flat rail routes through the Alps.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Der Ceneri-Basistunnel steht ab dem Fahrplanwechsel am 13. Dezember f\u00fcr den fahrplanm\u00e4ssigen Betrieb zur Verf\u00fcgung. Das Bundesamt f\u00fcr Verkehr hat die daf\u00fcr n\u00f6tige Bewilligung erteilt. Damit kann auch der dritte der drei grossen NEAT-Tunnel den Betrieb aufnehmen.<\/p>\n","protected":false},"author":2,"featured_media":22271,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[12476,12487,12502],"tags":[17350,17353,17354,17355,17356,17357,17358,12525,12526,12859,17359,14941,17360,12528,17361,17362,13389],"class_list":["post-26829","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-immonews","category-regions-en","category-region-tessin-en","tag-bav-en","tag-ceneri-en","tag-ceneri-basistunnel-en","tag-einsenbahn-alpen-transversale-en","tag-eisenbahn-en","tag-eisenbahn-alpen-en","tag-gueterzuege-en","tag-immoinvest-en","tag-immonews-en","tag-infrastruktur-en","tag-locarno-en","tag-lugano-en","tag-neat-en","tag-news-en","tag-passagierzuege-en","tag-s-bahn-en","tag-tunnel-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"The Ceneri Base Tunnel will be available for regular operation from the timetable change on December 13th. The Federal Office of Transport has issued the necessary permit. This means that the third of the three large NEAT tunnels can also go into operation.","autor":"stk","ort":"Bern","bildunterschrift":"","zusammenfassung":"","bild_im_grid":false,"gallerie":null,"newsim":""},"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.3 - aioseo.com -->\n\t<meta name=\"description\" content=\"Der Ceneri-Basistunnel steht ab dem Fahrplanwechsel am 13. Dezember f\u00fcr den fahrplanm\u00e4ssigen Betrieb zur Verf\u00fcgung. Das Bundesamt f\u00fcr Verkehr hat die daf\u00fcr n\u00f6tige Bewilligung erteilt. Damit kann auch der dritte der drei grossen NEAT-Tunnel den Betrieb aufnehmen.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"immovestuser\"\/>\n\t<meta name=\"google-site-verification\" content=\"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.3\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Ceneri Base Tunnel receives the green light - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:description\" content=\"Der Ceneri-Basistunnel steht ab dem Fahrplanwechsel am 13. Dezember f\u00fcr den fahrplanm\u00e4ssigen Betrieb zur Verf\u00fcgung. Das Bundesamt f\u00fcr Verkehr hat die daf\u00fcr n\u00f6tige Bewilligung erteilt. Damit kann auch der dritte der drei grossen NEAT-Tunnel den Betrieb aufnehmen.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/07\/oeffentlicher_verkehr_3.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/07\/oeffentlicher_verkehr_3.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2020-12-03T07:32:42+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2021-11-02T09:31:15+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Ceneri Base Tunnel receives the green light - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Der Ceneri-Basistunnel steht ab dem Fahrplanwechsel am 13. Dezember f\u00fcr den fahrplanm\u00e4ssigen Betrieb zur Verf\u00fcgung. Das Bundesamt f\u00fcr Verkehr hat die daf\u00fcr n\u00f6tige Bewilligung erteilt. Damit kann auch der dritte der drei grossen NEAT-Tunnel den Betrieb aufnehmen.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/07\/oeffentlicher_verkehr_3.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/ceneri-basistunnel-erhaelt-gruenes-licht\\\/#blogposting\",\"name\":\"Ceneri Base Tunnel receives the green light - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"headline\":\"Ceneri Base Tunnel receives the green light\",\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/oeffentlicher_verkehr_3.png\",\"width\":1200,\"height\":628},\"datePublished\":\"2020-12-03T08:32:42+01:00\",\"dateModified\":\"2021-11-02T10:31:15+01:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/ceneri-basistunnel-erhaelt-gruenes-licht\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/ceneri-basistunnel-erhaelt-gruenes-licht\\\/#webpage\"},\"articleSection\":\"immoNews, Regions, Tessin, BAV, Ceneri, Ceneri-Basistunnel, Einsenbahn-Alpen-Transversale, Eisenbahn, Eisenbahn-Alpen, G\\u00fcterz\\u00fcge, Immoinvest, immoNews, Infrastruktur, locarno, Lugano, NEAT, News, Passagierz\\u00fcge, S-Bahn, tunnel, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/ceneri-basistunnel-erhaelt-gruenes-licht\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"position\":2,\"name\":\"Regions\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"position\":3,\"name\":\"Switzerland\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-tessin-en\\\/#listItem\",\"name\":\"Tessin\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-tessin-en\\\/#listItem\",\"position\":4,\"name\":\"Tessin\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-tessin-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/ceneri-basistunnel-erhaelt-gruenes-licht\\\/#listItem\",\"name\":\"Ceneri Base Tunnel receives the green light\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/ceneri-basistunnel-erhaelt-gruenes-licht\\\/#listItem\",\"position\":5,\"name\":\"Ceneri Base Tunnel receives the green light\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-tessin-en\\\/#listItem\",\"name\":\"Tessin\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"email\":\"admin@immomedia.ag\",\"telephone\":\"+41444420002\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/immoinvest_sm-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/ceneri-basistunnel-erhaelt-gruenes-licht\\\/#organizationLogo\",\"width\":2560,\"height\":1340},\"image\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/ceneri-basistunnel-erhaelt-gruenes-licht\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Immoinvest\\\/100077962920504\\\/\",\"https:\\\/\\\/x.com\\\/i\\\/flow\\\/login?redirect_after_login=immoinvest_ch\",\"https:\\\/\\\/www.instagram.com\\\/immoinvest_ch\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/immoinvest-swiss\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/\",\"name\":\"immovestuser\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/ceneri-basistunnel-erhaelt-gruenes-licht\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"immovestuser\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/ceneri-basistunnel-erhaelt-gruenes-licht\\\/#webpage\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/ceneri-basistunnel-erhaelt-gruenes-licht\\\/\",\"name\":\"Ceneri Base Tunnel receives the green light - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Der Ceneri-Basistunnel steht ab dem Fahrplanwechsel am 13. Dezember f\\u00fcr den fahrplanm\\u00e4ssigen Betrieb zur Verf\\u00fcgung. Das Bundesamt f\\u00fcr Verkehr hat die daf\\u00fcr n\\u00f6tige Bewilligung erteilt. Damit kann auch der dritte der drei grossen NEAT-Tunnel den Betrieb aufnehmen.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/ceneri-basistunnel-erhaelt-gruenes-licht\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/oeffentlicher_verkehr_3.png\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/ceneri-basistunnel-erhaelt-gruenes-licht\\\/#mainImage\",\"width\":1200,\"height\":628},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/ceneri-basistunnel-erhaelt-gruenes-licht\\\/#mainImage\"},\"datePublished\":\"2020-12-03T08:32:42+01:00\",\"dateModified\":\"2021-11-02T10:31:15+01:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Ceneri Base Tunnel receives the green light - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Der Ceneri-Basistunnel steht ab dem Fahrplanwechsel am 13. Dezember f\u00fcr den fahrplanm\u00e4ssigen Betrieb zur Verf\u00fcgung. Das Bundesamt f\u00fcr Verkehr hat die daf\u00fcr n\u00f6tige Bewilligung erteilt. Damit kann auch der dritte der drei grossen NEAT-Tunnel den Betrieb aufnehmen.","canonical_url":"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/#blogposting","name":"Ceneri Base Tunnel receives the green light - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","headline":"Ceneri Base Tunnel receives the green light","author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/07\/oeffentlicher_verkehr_3.png","width":1200,"height":628},"datePublished":"2020-12-03T08:32:42+01:00","dateModified":"2021-11-02T10:31:15+01:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/#webpage"},"isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/#webpage"},"articleSection":"immoNews, Regions, Tessin, BAV, Ceneri, Ceneri-Basistunnel, Einsenbahn-Alpen-Transversale, Eisenbahn, Eisenbahn-Alpen, G\u00fcterz\u00fcge, Immoinvest, immoNews, Infrastruktur, locarno, Lugano, NEAT, News, Passagierz\u00fcge, S-Bahn, tunnel, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.immo-invest.ch\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","position":2,"name":"Regions","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","position":3,"name":"Switzerland","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-tessin-en\/#listItem","name":"Tessin"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-tessin-en\/#listItem","position":4,"name":"Tessin","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-tessin-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/#listItem","name":"Ceneri Base Tunnel receives the green light"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/#listItem","position":5,"name":"Ceneri Base Tunnel receives the green light","previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-tessin-en\/#listItem","name":"Tessin"}}]},{"@type":"Organization","@id":"https:\/\/www.immo-invest.ch\/en\/#organization","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","url":"https:\/\/www.immo-invest.ch\/en\/","email":"admin@immomedia.ag","telephone":"+41444420002","logo":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/09\/immoinvest_sm-scaled.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/#organizationLogo","width":2560,"height":1340},"image":{"@id":"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","https:\/\/x.com\/i\/flow\/login?redirect_after_login=immoinvest_ch","https:\/\/www.instagram.com\/immoinvest_ch\/","https:\/\/www.linkedin.com\/company\/immoinvest-swiss"]},{"@type":"Person","@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author","url":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/","name":"immovestuser","image":{"@type":"ImageObject","@id":"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g","width":96,"height":96,"caption":"immovestuser"}},{"@type":"WebPage","@id":"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/#webpage","url":"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/","name":"Ceneri Base Tunnel receives the green light - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Der Ceneri-Basistunnel steht ab dem Fahrplanwechsel am 13. Dezember f\u00fcr den fahrplanm\u00e4ssigen Betrieb zur Verf\u00fcgung. Das Bundesamt f\u00fcr Verkehr hat die daf\u00fcr n\u00f6tige Bewilligung erteilt. Damit kann auch der dritte der drei grossen NEAT-Tunnel den Betrieb aufnehmen.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/#breadcrumblist"},"author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"creator":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/07\/oeffentlicher_verkehr_3.png","@id":"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/#mainImage","width":1200,"height":628},"primaryImageOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/#mainImage"},"datePublished":"2020-12-03T08:32:42+01:00","dateModified":"2021-11-02T10:31:15+01:00"},{"@type":"WebSite","@id":"https:\/\/www.immo-invest.ch\/en\/#website","url":"https:\/\/www.immo-invest.ch\/en\/","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien","og:type":"article","og:title":"Ceneri Base Tunnel receives the green light - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","og:description":"Der Ceneri-Basistunnel steht ab dem Fahrplanwechsel am 13. Dezember f\u00fcr den fahrplanm\u00e4ssigen Betrieb zur Verf\u00fcgung. Das Bundesamt f\u00fcr Verkehr hat die daf\u00fcr n\u00f6tige Bewilligung erteilt. Damit kann auch der dritte der drei grossen NEAT-Tunnel den Betrieb aufnehmen.","og:url":"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/","og:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/07\/oeffentlicher_verkehr_3.png","og:image:secure_url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/07\/oeffentlicher_verkehr_3.png","og:image:width":1200,"og:image:height":628,"article:published_time":"2020-12-03T07:32:42+00:00","article:modified_time":"2021-11-02T09:31:15+00:00","article:publisher":"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","twitter:card":"summary_large_image","twitter:site":"@i","twitter:title":"Ceneri Base Tunnel receives the green light - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","twitter:description":"Der Ceneri-Basistunnel steht ab dem Fahrplanwechsel am 13. Dezember f\u00fcr den fahrplanm\u00e4ssigen Betrieb zur Verf\u00fcgung. Das Bundesamt f\u00fcr Verkehr hat die daf\u00fcr n\u00f6tige Bewilligung erteilt. Damit kann auch der dritte der drei grossen NEAT-Tunnel den Betrieb aufnehmen.","twitter:creator":"@i","twitter:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/07\/oeffentlicher_verkehr_3.png"},"aioseo_meta_data":{"post_id":"26829","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-09-19 08:21:47","updated":"2025-10-22 13:57:14","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/\" title=\"Regions\">Regions<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/\" title=\"Switzerland\">Switzerland<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-tessin-en\/\" title=\"Tessin\">Tessin<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tCeneri Base Tunnel receives the green light\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.immo-invest.ch\/en\/"},{"label":"Regions","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/"},{"label":"Switzerland","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/"},{"label":"Tessin","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-tessin-en\/"},{"label":"Ceneri Base Tunnel receives the green light","link":"https:\/\/www.immo-invest.ch\/en\/ceneri-basistunnel-erhaelt-gruenes-licht\/"}],"featured_image_src":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2020\/07\/oeffentlicher_verkehr_3-150x150.png","_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/26829","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=26829"}],"version-history":[{"count":0,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/26829\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/22271"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=26829"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=26829"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=26829"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}