{"id":169966,"date":"2026-11-25T09:00:00","date_gmt":"2026-11-25T08:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=169966"},"modified":"2026-11-23T09:41:56","modified_gmt":"2026-11-23T08:41:56","slug":"das-naechste-kapitel-am-luks","status":"publish","type":"post","link":"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/","title":{"rendered":"The next chapter at LUKS"},"content":{"rendered":"\n\n<p class=\"wp-block-paragraph\">With the submission of the planning application for the preparatory work, the project has taken a significant step forward. The planning application covers the demolition of the existing buildings, the excavation work and the installation of around 200 geothermal probes. These will create the energy and structural conditions required for the new building.<br><br><strong>Demolition creates space for the second phase<\/strong><br>In autumn 2026, the Children\u2019s Hospital and the Women\u2019s Clinic, including the underground car park, are due to commence operations in the new building. As a result, the current Children\u2019s Hospital and the visitor car park will cease to serve their current functions. Demolition is scheduled to take place between early 2027 and mid-2028.<br><br>LUKS regards the demolition as part of its commitment to sustainability. Reusable materials are to be kept within recycling loops wherever possible. This is intended to reduce waste, landfill volumes and CO\u2082 emissions. At the same time, the planned geothermal probes are set to expand the site\u2019s sustainable energy supply.<br><br>The process will be carried out in phases. First, the necessary technical and structural preparatory work will be carried out. In parallel, the LUKS is continuing to develop the actual new-build project and aligning it with ongoing strategic development. The infrastructure is intended to meet the needs of an ageing population, be compatible with future health policy frameworks and remain economically viable in the long term.<br><br><strong>Outpatient services under one roof<\/strong><br>The Outpatient Centre is envisaged as the second major component of the regeneration of the LUKS site. The plan is for a building without inpatient wards that brings together outpatient medical and surgical services. These include, amongst other things, consultations, diagnostics, procedures and operations, physiotherapy and occupational therapy, dialysis and infusion therapies.<br><br>This consolidation is intended to enable shorter distances and better-coordinated processes for both patients and staff. Examination, treatment and work rooms are to be available for interdisciplinary use. This creates flexibility, facilitates adaptation to changing medical needs and reduces the need for duplicate infrastructure.<br><br>LUKS is thus responding to a fundamental shift in healthcare provision. Many procedures and treatments that previously required an inpatient stay can now be carried out on an outpatient basis. For a central hospital, outpatient infrastructure is therefore becoming a decisive factor in terms of quality, capacity and cost-effectiveness.<br><br><strong>Two buildings and a new hospital square<\/strong><br>The winning design proposes two building blocks. The larger building will house outpatient facilities close to patient care areas. The smaller building is intended to accommodate separate functions or those further removed from patient care. An emergency clinic is also planned, which will be physically separated from scheduled treatments.<br><br>The new building is to comprise up to seven storeys and will feature an additional entrance leading onto the hospital promenade. This is intended to improve access to the site and integrate the new hospital square more closely with its surroundings. The project forms part of a long-term reorganisation of the entire LUKS site, whose existing structure is being gradually replaced by functionally linked new buildings.<br><br><strong>Costs, timetable and outstanding issues<\/strong><br>In 2024, a rough cost estimate of around 195 million Swiss francs was available for the clinic building. Added to this were around 35 million Swiss francs for car parking and around 10 million Swiss francs for the hospital square and the surrounding area. This totalled around 240 million Swiss francs. The estimate was stated with a margin of error of plus or minus 30 per cent. Additional costs for demolition, medical technology, equipment, temporary facilities and inflation were not included at that time.<br><br>The planning-law basis is in place following the City of Lucerne\u2019s amendment to the local development plan. Access to the hospital centre is to be guaranteed at all times during demolition and excavation work, even though there will be gradual changes to paths and access routes.<br><br>The aim remains to open the Outpatient Centre in 2031. By then, it will become clear to what extent LUKS will further develop the strategy, the space allocation plan and the financing of the project.<br><br>The new building is not simply intended to create additional space. It is designed as an infrastructural response to the shift from inpatient to outpatient care and to the long-term development of healthcare provision in Central Switzerland.<br><br><\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>Following the move into the Children\u2019s Hospital and the Women\u2019s Clinic in autumn 2026, Lucerne Cantonal Hospital is preparing for the second major phase of its site development. By 2031, an outpatient centre will be built on the space that becomes available, bringing together medical services and positioning the Lucerne site to meet the growing demand for outpatient care.<\/p>\n","protected":false},"author":57,"featured_media":169967,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[12489,56026,12490,22698],"tags":[63779,14593,13465,63780,12525,12526,19415,12528,63781],"class_list":["post-169966","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-new-construction","category-planning-development","category-refurbishment","category-sustainability","tag-ambulantes-zentrum","tag-arealentwicklung-en","tag-erdsonden-en","tag-gesundheitsinfrastruktur","tag-immoinvest-en","tag-immonews-en","tag-kreislaufwirtschaft-en","tag-news-en","tag-spitalbau"],"acf":{"bild_mit_ki_erstellt_worden":"","lead":"Following the move into the Children\u2019s Hospital and the Women\u2019s Clinic in autumn 2026, Lucerne Cantonal Hospital is preparing for the second major phase of its site development. By 2031, an outpatient centre will be built on the space that becomes available, bringing together medical services and positioning the Lucerne site to meet the growing demand for outpatient care.","autor":"Text: Karin Ibach \u2022 Bild: Luzerner Kantonsspital","ort":"","bildunterschrift":"","zusammenfassung":"","bild_im_grid":false,"gallerie":"","newsim":""},"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Following the move into the Children\u2019s Hospital and the Women\u2019s Clinic in autumn 2026, Lucerne Cantonal Hospital is preparing for the second major phase of its site development. By 2031, an outpatient centre will be built on the space that becomes available, bringing together medical services and positioning the Lucerne site to meet the growing demand for outpatient care.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"immoinv_redakteur\"\/>\n\t<meta name=\"google-site-verification\" content=\"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"The next chapter at LUKS - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:description\" content=\"Following the move into the Children\u2019s Hospital and the Women\u2019s Clinic in autumn 2026, Lucerne Cantonal Hospital is preparing for the second major phase of its site development. By 2031, an outpatient centre will be built on the space that becomes available, bringing together medical services and positioning the Lucerne site to meet the growing demand for outpatient care.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/11\/Bild3-e1795422479667.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/11\/Bild3-e1795422479667.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1176\" \/>\n\t\t<meta property=\"og:image:height\" content=\"662\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-11-25T09:00:00+01:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-11-25T09:00:00+01:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"The next chapter at LUKS - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Following the move into the Children\u2019s Hospital and the Women\u2019s Clinic in autumn 2026, Lucerne Cantonal Hospital is preparing for the second major phase of its site development. By 2031, an outpatient centre will be built on the space that becomes available, bringing together medical services and positioning the Lucerne site to meet the growing demand for outpatient care.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/11\/Bild3-e1795422479667.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/das-naechste-kapitel-am-luks\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/projects-en\\\/#listItem\",\"name\":\"Projects\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/projects-en\\\/#listItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/projects-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/projects-en\\\/new-construction\\\/#listItem\",\"name\":\"New construction\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/projects-en\\\/new-construction\\\/#listItem\",\"position\":3,\"name\":\"New construction\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/projects-en\\\/new-construction\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/das-naechste-kapitel-am-luks\\\/#listItem\",\"name\":\"The next chapter at LUKS\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/projects-en\\\/#listItem\",\"name\":\"Projects\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/das-naechste-kapitel-am-luks\\\/#listItem\",\"position\":4,\"name\":\"The next chapter at LUKS\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/projects-en\\\/new-construction\\\/#listItem\",\"name\":\"New construction\"}}]},{\"@type\":\"NewsArticle\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/das-naechste-kapitel-am-luks\\\/#blogposting\",\"name\":\"The next chapter at LUKS - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"headline\":\"The next chapter at LUKS\",\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immoinv_redakteur\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Bild3-e1795422479667.png\",\"width\":1176,\"height\":662},\"datePublished\":\"2026-11-25T09:00:00+01:00\",\"dateModified\":\"2026-11-25T09:00:00+01:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/das-naechste-kapitel-am-luks\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/das-naechste-kapitel-am-luks\\\/#webpage\"},\"articleSection\":\"New construction, Planning \\\/ Development, Refurbishment, Sustainability, Ambulantes Zentrum, Arealentwicklung, Erdsonden, Gesundheitsinfrastruktur, Immoinvest, immoNews, Kreislaufwirtschaft, News, Spitalbau\",\"isAccessibleForFree\":true},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"email\":\"admin@immomedia.ag\",\"telephone\":\"+41444420002\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/immoinvest_sm-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/das-naechste-kapitel-am-luks\\\/#organizationLogo\",\"width\":2560,\"height\":1340},\"image\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/das-naechste-kapitel-am-luks\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Immoinvest\\\/100077962920504\\\/\",\"https:\\\/\\\/www.instagram.com\\\/immoinvest_ch\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/immoinvest-swiss\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immoinv_redakteur\\\/#author\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immoinv_redakteur\\\/\",\"name\":\"immoinv_redakteur\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/das-naechste-kapitel-am-luks\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c880e25d853edfb649661cf7cf8a7571fd0af3883a77197f45a3f15520d284a3?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"immoinv_redakteur\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/das-naechste-kapitel-am-luks\\\/#webpage\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/das-naechste-kapitel-am-luks\\\/\",\"name\":\"The next chapter at LUKS - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Following the move into the Children\\u2019s Hospital and the Women\\u2019s Clinic in autumn 2026, Lucerne Cantonal Hospital is preparing for the second major phase of its site development. By 2031, an outpatient centre will be built on the space that becomes available, bringing together medical services and positioning the Lucerne site to meet the growing demand for outpatient care.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/das-naechste-kapitel-am-luks\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immoinv_redakteur\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immoinv_redakteur\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Bild3-e1795422479667.png\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/das-naechste-kapitel-am-luks\\\/#mainImage\",\"width\":1176,\"height\":662},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/das-naechste-kapitel-am-luks\\\/#mainImage\"},\"datePublished\":\"2026-11-25T09:00:00+01:00\",\"dateModified\":\"2026-11-25T09:00:00+01:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"The next chapter at LUKS - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Following the move into the Children\u2019s Hospital and the Women\u2019s Clinic in autumn 2026, Lucerne Cantonal Hospital is preparing for the second major phase of its site development. By 2031, an outpatient centre will be built on the space that becomes available, bringing together medical services and positioning the Lucerne site to meet the growing demand for outpatient care.","canonical_url":"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.immo-invest.ch\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/#listItem","name":"Projects"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/#listItem","position":2,"name":"Projects","item":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/new-construction\/#listItem","name":"New construction"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/new-construction\/#listItem","position":3,"name":"New construction","item":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/new-construction\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/#listItem","name":"The next chapter at LUKS"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/#listItem","name":"Projects"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/#listItem","position":4,"name":"The next chapter at LUKS","previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/new-construction\/#listItem","name":"New construction"}}]},{"@type":"NewsArticle","@id":"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/#blogposting","name":"The next chapter at LUKS - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","headline":"The next chapter at LUKS","author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immoinv_redakteur\/#author"},"publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/11\/Bild3-e1795422479667.png","width":1176,"height":662},"datePublished":"2026-11-25T09:00:00+01:00","dateModified":"2026-11-25T09:00:00+01:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/#webpage"},"isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/#webpage"},"articleSection":"New construction, Planning \/ Development, Refurbishment, Sustainability, Ambulantes Zentrum, Arealentwicklung, Erdsonden, Gesundheitsinfrastruktur, Immoinvest, immoNews, Kreislaufwirtschaft, News, Spitalbau","isAccessibleForFree":true},{"@type":"Organization","@id":"https:\/\/www.immo-invest.ch\/en\/#organization","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","url":"https:\/\/www.immo-invest.ch\/en\/","email":"admin@immomedia.ag","telephone":"+41444420002","logo":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/09\/immoinvest_sm-scaled.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/#organizationLogo","width":2560,"height":1340},"image":{"@id":"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","https:\/\/www.instagram.com\/immoinvest_ch\/","https:\/\/www.linkedin.com\/company\/immoinvest-swiss"]},{"@type":"Person","@id":"https:\/\/www.immo-invest.ch\/en\/author\/immoinv_redakteur\/#author","url":"https:\/\/www.immo-invest.ch\/en\/author\/immoinv_redakteur\/","name":"immoinv_redakteur","image":{"@type":"ImageObject","@id":"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/c880e25d853edfb649661cf7cf8a7571fd0af3883a77197f45a3f15520d284a3?s=96&d=mm&r=g","width":96,"height":96,"caption":"immoinv_redakteur"}},{"@type":"WebPage","@id":"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/#webpage","url":"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/","name":"The next chapter at LUKS - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Following the move into the Children\u2019s Hospital and the Women\u2019s Clinic in autumn 2026, Lucerne Cantonal Hospital is preparing for the second major phase of its site development. By 2031, an outpatient centre will be built on the space that becomes available, bringing together medical services and positioning the Lucerne site to meet the growing demand for outpatient care.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/#breadcrumblist"},"author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immoinv_redakteur\/#author"},"creator":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immoinv_redakteur\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/11\/Bild3-e1795422479667.png","@id":"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/#mainImage","width":1176,"height":662},"primaryImageOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/#mainImage"},"datePublished":"2026-11-25T09:00:00+01:00","dateModified":"2026-11-25T09:00:00+01:00"},{"@type":"WebSite","@id":"https:\/\/www.immo-invest.ch\/en\/#website","url":"https:\/\/www.immo-invest.ch\/en\/","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien","og:type":"article","og:title":"The next chapter at LUKS - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","og:description":"Following the move into the Children\u2019s Hospital and the Women\u2019s Clinic in autumn 2026, Lucerne Cantonal Hospital is preparing for the second major phase of its site development. By 2031, an outpatient centre will be built on the space that becomes available, bringing together medical services and positioning the Lucerne site to meet the growing demand for outpatient care.","og:url":"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/","og:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/11\/Bild3-e1795422479667.png","og:image:secure_url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/11\/Bild3-e1795422479667.png","og:image:width":1176,"og:image:height":662,"article:published_time":"2026-11-25T09:00:00+01:00","article:modified_time":"2026-11-25T09:00:00+01:00","article:publisher":"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","twitter:card":"summary_large_image","twitter:title":"The next chapter at LUKS - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","twitter:description":"Following the move into the Children\u2019s Hospital and the Women\u2019s Clinic in autumn 2026, Lucerne Cantonal Hospital is preparing for the second major phase of its site development. By 2031, an outpatient centre will be built on the space that becomes available, bringing together medical services and positioning the Lucerne site to meet the growing demand for outpatient care.","twitter:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/11\/Bild3-e1795422479667.png"},"aioseo_meta_data":{"post_id":"169966","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-11-23 08:41:56","updated":"2026-11-23 08:41:56","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/\" title=\"Projects\">Projects<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/new-construction\/\" title=\"New construction\">New construction<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tThe next chapter at LUKS\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.immo-invest.ch\/en\/"},{"label":"Projects","link":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/"},{"label":"New construction","link":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/new-construction\/"},{"label":"The next chapter at LUKS","link":"https:\/\/www.immo-invest.ch\/en\/das-naechste-kapitel-am-luks\/"}],"featured_image_src":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/11\/Bild3-e1795422479667-336x168.png","_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/169966","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/57"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=169966"}],"version-history":[{"count":2,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/169966\/revisions"}],"predecessor-version":[{"id":169979,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/169966\/revisions\/169979"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/169967"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=169966"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=169966"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=169966"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}