{"id":169813,"date":"2026-11-19T17:30:00","date_gmt":"2026-11-19T16:30:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=169813"},"modified":"2026-11-19T16:36:27","modified_gmt":"2026-11-19T15:36:27","slug":"oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab","status":"publish","type":"post","link":"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/","title":{"rendered":"Oerlikon\u2019s sports centre project has been delayed by a year"},"content":{"rendered":"\n\n<p class=\"wp-block-paragraph\">The City of Zurich submitted the planning application for the northern section of the new Oerlikon Sports Centre on 13 November 2026. This application marks the start of the planning permission process for the first phase. However, the earlier timetable set out in the referendum of 28 September 2025 will not be met. Instead of construction starting in the summer of 2027, work is now expected to begin in the second quarter of 2028, subject to planning permission being granted.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\">This postpones the opening of the main building until 2032. For day-to-day operations, the disruption will remain limited for the time being, as the indoor swimming pool and ice rinks are to continue to be used until the new buildings open. According to the city, the CHF 373 million loan approved in 2025 is also set to be honoured despite the delayed start.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\"><strong>First phase brings the centrepiece<br><\/strong>The main building of this major project is being constructed on the northern site, north of Wallisellenstrasse. Plans include a combined swimming complex with indoor and outdoor pools, two ice rinks open all year round, a public restaurant, a maintenance depot and one of a total of three artificial turf pitches on the roof. The new combined swimming complex is set to offer around 60 per cent more water surface area than the current indoor swimming pool.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Second phase remains tricky<br><\/strong>The city intends to develop the southern site only after the main building has opened. A changing room block and further grass sports pitches are planned there between 2033 and 2034. The final phase, comprising green spaces and sports pitches, is now scheduled for 2035 to 2037. It is precisely at this point that the project becomes vulnerable from both a political and planning perspective, as the demolition of the existing indoor swimming pool had previously been planned for the southern site.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Opposition to the demolition is growing<br><\/strong>The Sporthalle Oerlikon association is campaigning against this demolition. It wants to preserve the building, which opened in 1978, and convert it into a multi-sports hall. The city has not yet communicated a policy decision on this matter. In its statement regarding the planning application, it merely announces that further investigations into the existing indoor swimming pool will be carried out as part of the detailed planning for the southern site. As regards the site\u2019s future development, it therefore remains to be seen whether the one-year delay will merely be a scheduling issue or whether it will give rise to a new conflict over the site\u2019s use.<\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>In Zurich-Oerlikon, the start of construction on the new sports centre has been postponed until the second quarter of 2028. This means the main building will not open until 2032 instead of 2031. At the same time, pressure is mounting on the second phase, as the demolition of the existing indoor swimming pool is controversial both politically and in terms of architectural heritage.<\/p>\n","protected":false},"author":2,"featured_media":169810,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[22358,55990,12489,56026,12493],"tags":[21570,37343,63709,12525,12526,12528,63710,63253],"class_list":["post-169813","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","category-districts-areas","category-new-construction","category-planning-development","category-region-zurich-en","tag-baugesuch-en","tag-grossprojekt-en","tag-hallenbad-oerlikon","tag-immoinvest-en","tag-immonews-en","tag-news-en","tag-sportzentrum-oerlikon","tag-zurich-oerlikon"],"acf":{"bild_mit_ki_erstellt_worden":["Ja"],"lead":"In Zurich-Oerlikon, the start of construction on the new sports centre has been postponed until the second quarter of 2028. This means the main building will not open until 2032 instead of 2031. At the same time, pressure is mounting on the second phase, as the demolition of the existing indoor swimming pool is controversial both politically and in terms of architectural heritage.","autor":"","ort":"Z\u00fcrich","bildunterschrift":"","zusammenfassung":"<ul>\r\n<li>Der Baustart in Oerlikon verschiebt sich auf 2028.<\/li>\r\n<li>Das Hauptgeb\u00e4ude des Sportzentrums \u00f6ffnet neu erst 2032.<\/li>\r\n<li>Der geplante Abriss des Hallenbads st\u00f6sst auf Widerstand.<\/li>\r\n<\/ul>\r\n","bild_im_grid":false,"gallerie":"","newsim":"5071"},"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"In Zurich-Oerlikon, the start of construction on the new sports centre has been postponed until the second quarter of 2028. This means the main building will not open until 2032 instead of 2031. At the same time, pressure is mounting on the second phase, as the demolition of the existing indoor swimming pool is controversial both politically and in terms of architectural heritage.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"immovestuser\"\/>\n\t<meta name=\"google-site-verification\" content=\"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Oerlikon\u2019s sports centre project has been delayed by a year - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:description\" content=\"In Zurich-Oerlikon, the start of construction on the new sports centre has been postponed until the second quarter of 2028. This means the main building will not open until 2032 instead of 2031. At the same time, pressure is mounting on the second phase, as the demolition of the existing indoor swimming pool is controversial both politically and in terms of architectural heritage.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/11\/Oerlikon-rutscht-beim-Sportzentrum-um-ein-Jahr-ab-immo-invest.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/11\/Oerlikon-rutscht-beim-Sportzentrum-um-ein-Jahr-ab-immo-invest.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-11-19T17:30:00+01:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-11-19T17:30:00+01:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Oerlikon\u2019s sports centre project has been delayed by a year - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta name=\"twitter:description\" content=\"In Zurich-Oerlikon, the start of construction on the new sports centre has been postponed until the second quarter of 2028. This means the main building will not open until 2032 instead of 2031. At the same time, pressure is mounting on the second phase, as the demolition of the existing indoor swimming pool is controversial both politically and in terms of architectural heritage.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/11\/Oerlikon-rutscht-beim-Sportzentrum-um-ein-Jahr-ab-immo-invest.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"position\":2,\"name\":\"Regions\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"position\":3,\"name\":\"Switzerland\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zurich-en\\\/#listItem\",\"name\":\"Zurich\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zurich-en\\\/#listItem\",\"position\":4,\"name\":\"Zurich\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zurich-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\\\/#listItem\",\"name\":\"Oerlikon\\u2019s sports centre project has been delayed by a year\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\\\/#listItem\",\"position\":5,\"name\":\"Oerlikon\\u2019s sports centre project has been delayed by a year\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zurich-en\\\/#listItem\",\"name\":\"Zurich\"}}]},{\"@type\":\"NewsArticle\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\\\/#blogposting\",\"name\":\"Oerlikon\\u2019s sports centre project has been delayed by a year - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"headline\":\"Oerlikon\\u2019s sports centre project has been delayed by a year\",\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Oerlikon-rutscht-beim-Sportzentrum-um-ein-Jahr-ab-immo-invest.png\",\"width\":1536,\"height\":768},\"datePublished\":\"2026-11-19T17:30:00+01:00\",\"dateModified\":\"2026-11-19T17:30:00+01:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\\\/#webpage\"},\"articleSection\":\"Construction, Districts \\\/ Areas, New construction, Planning \\\/ Development, Zurich, Baugesuch, Grossprojekt, Hallenbad Oerlikon, Immoinvest, immoNews, News, Sportzentrum Oerlikon, Z\\u00fcrich-Oerlikon\",\"isAccessibleForFree\":true},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"email\":\"admin@immomedia.ag\",\"telephone\":\"+41444420002\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/immoinvest_sm-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\\\/#organizationLogo\",\"width\":2560,\"height\":1340},\"image\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Immoinvest\\\/100077962920504\\\/\",\"https:\\\/\\\/www.instagram.com\\\/immoinvest_ch\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/immoinvest-swiss\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/\",\"name\":\"immovestuser\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"immovestuser\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\\\/#webpage\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\\\/\",\"name\":\"Oerlikon\\u2019s sports centre project has been delayed by a year - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"In Zurich-Oerlikon, the start of construction on the new sports centre has been postponed until the second quarter of 2028. This means the main building will not open until 2032 instead of 2031. At the same time, pressure is mounting on the second phase, as the demolition of the existing indoor swimming pool is controversial both politically and in terms of architectural heritage.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Oerlikon-rutscht-beim-Sportzentrum-um-ein-Jahr-ab-immo-invest.png\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\\\/#mainImage\",\"width\":1536,\"height\":768},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\\\/#mainImage\"},\"datePublished\":\"2026-11-19T17:30:00+01:00\",\"dateModified\":\"2026-11-19T17:30:00+01:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Oerlikon\u2019s sports centre project has been delayed by a year - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"In Zurich-Oerlikon, the start of construction on the new sports centre has been postponed until the second quarter of 2028. This means the main building will not open until 2032 instead of 2031. At the same time, pressure is mounting on the second phase, as the demolition of the existing indoor swimming pool is controversial both politically and in terms of architectural heritage.","canonical_url":"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.immo-invest.ch\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","position":2,"name":"Regions","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","position":3,"name":"Switzerland","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/#listItem","name":"Zurich"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/#listItem","position":4,"name":"Zurich","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/#listItem","name":"Oerlikon\u2019s sports centre project has been delayed by a year"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/#listItem","position":5,"name":"Oerlikon\u2019s sports centre project has been delayed by a year","previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/#listItem","name":"Zurich"}}]},{"@type":"NewsArticle","@id":"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/#blogposting","name":"Oerlikon\u2019s sports centre project has been delayed by a year - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","headline":"Oerlikon\u2019s sports centre project has been delayed by a year","author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/11\/Oerlikon-rutscht-beim-Sportzentrum-um-ein-Jahr-ab-immo-invest.png","width":1536,"height":768},"datePublished":"2026-11-19T17:30:00+01:00","dateModified":"2026-11-19T17:30:00+01:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/#webpage"},"isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/#webpage"},"articleSection":"Construction, Districts \/ Areas, New construction, Planning \/ Development, Zurich, Baugesuch, Grossprojekt, Hallenbad Oerlikon, Immoinvest, immoNews, News, Sportzentrum Oerlikon, Z\u00fcrich-Oerlikon","isAccessibleForFree":true},{"@type":"Organization","@id":"https:\/\/www.immo-invest.ch\/en\/#organization","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","url":"https:\/\/www.immo-invest.ch\/en\/","email":"admin@immomedia.ag","telephone":"+41444420002","logo":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/09\/immoinvest_sm-scaled.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/#organizationLogo","width":2560,"height":1340},"image":{"@id":"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","https:\/\/www.instagram.com\/immoinvest_ch\/","https:\/\/www.linkedin.com\/company\/immoinvest-swiss"]},{"@type":"Person","@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author","url":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/","name":"immovestuser","image":{"@type":"ImageObject","@id":"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g","width":96,"height":96,"caption":"immovestuser"}},{"@type":"WebPage","@id":"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/#webpage","url":"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/","name":"Oerlikon\u2019s sports centre project has been delayed by a year - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"In Zurich-Oerlikon, the start of construction on the new sports centre has been postponed until the second quarter of 2028. This means the main building will not open until 2032 instead of 2031. At the same time, pressure is mounting on the second phase, as the demolition of the existing indoor swimming pool is controversial both politically and in terms of architectural heritage.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/#breadcrumblist"},"author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"creator":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/11\/Oerlikon-rutscht-beim-Sportzentrum-um-ein-Jahr-ab-immo-invest.png","@id":"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/#mainImage","width":1536,"height":768},"primaryImageOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/#mainImage"},"datePublished":"2026-11-19T17:30:00+01:00","dateModified":"2026-11-19T17:30:00+01:00"},{"@type":"WebSite","@id":"https:\/\/www.immo-invest.ch\/en\/#website","url":"https:\/\/www.immo-invest.ch\/en\/","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien","og:type":"article","og:title":"Oerlikon\u2019s sports centre project has been delayed by a year - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","og:description":"In Zurich-Oerlikon, the start of construction on the new sports centre has been postponed until the second quarter of 2028. This means the main building will not open until 2032 instead of 2031. At the same time, pressure is mounting on the second phase, as the demolition of the existing indoor swimming pool is controversial both politically and in terms of architectural heritage.","og:url":"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/","og:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/11\/Oerlikon-rutscht-beim-Sportzentrum-um-ein-Jahr-ab-immo-invest.png","og:image:secure_url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/11\/Oerlikon-rutscht-beim-Sportzentrum-um-ein-Jahr-ab-immo-invest.png","og:image:width":1536,"og:image:height":768,"article:published_time":"2026-11-19T17:30:00+01:00","article:modified_time":"2026-11-19T17:30:00+01:00","article:publisher":"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","twitter:card":"summary_large_image","twitter:title":"Oerlikon\u2019s sports centre project has been delayed by a year - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","twitter:description":"In Zurich-Oerlikon, the start of construction on the new sports centre has been postponed until the second quarter of 2028. This means the main building will not open until 2032 instead of 2031. At the same time, pressure is mounting on the second phase, as the demolition of the existing indoor swimming pool is controversial both politically and in terms of architectural heritage.","twitter:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/11\/Oerlikon-rutscht-beim-Sportzentrum-um-ein-Jahr-ab-immo-invest.png"},"aioseo_meta_data":{"post_id":"169813","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-11-19 15:35:43","updated":"2026-11-19 15:36:28","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/\" title=\"Regions\">Regions<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/\" title=\"Switzerland\">Switzerland<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/\" title=\"Zurich\">Zurich<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tOerlikon\u2019s sports centre project has been delayed by a year\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.immo-invest.ch\/en\/"},{"label":"Regions","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/"},{"label":"Switzerland","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/"},{"label":"Zurich","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/"},{"label":"Oerlikon\u2019s sports centre project has been delayed by a year","link":"https:\/\/www.immo-invest.ch\/en\/oerlikon-rutscht-beim-sportzentrum-um-ein-jahr-ab\/"}],"featured_image_src":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/11\/Oerlikon-rutscht-beim-Sportzentrum-um-ein-Jahr-ab-immo-invest-336x168.png","_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/169813","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=169813"}],"version-history":[{"count":2,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/169813\/revisions"}],"predecessor-version":[{"id":169820,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/169813\/revisions\/169820"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/169810"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=169813"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=169813"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=169813"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}