{"id":168395,"date":"2026-10-27T09:20:07","date_gmt":"2026-10-27T08:20:07","guid":{"rendered":"https:\/\/www.immo-invest.ch\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/"},"modified":"2026-10-27T09:21:51","modified_gmt":"2026-10-27T08:21:51","slug":"birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme","status":"publish","type":"post","link":"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/","title":{"rendered":"Birr Opens 250,000 Square Meters for Data and Heating"},"content":{"rendered":"\n\n<p class=\"wp-block-paragraph\">The change in ownership is taking place in an area that has already been designated in planning documents as a priority for economic development. The municipality of Birr and the canton of Aargau have been driving the further development of Grossacher and Gr\u00e4ndel since 2023. The collaboration is scheduled to run through 2027, and the supplemental plan for the area is part of the revised building and land-use code.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\">Green has acquired the approximately 250,000-square-meter Grossacher and Gr\u00e4ndel site from ABB and plans to develop the location into a data center campus in phases. Additional space is also planned for industry and commerce, as well as publicly accessible green spaces. For Birr, this is more than just a land sale. An industrial site long held in reserve is thus being given a concrete development path.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\"><strong>From Reserve to Infrastructure<br><\/strong>The area west of the railroad tracks is part of the Eigenamt economic development hub, which is of cantonal significance. The municipality had already identified Grossacher and Gr\u00e4ndel in 2024 as an important step toward greater planning and investment certainty. The fact that a data center infrastructure operator is now coming on board increases the pressure to take the site\u2019s development, energy supply, and marketing to the next level.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\">The scale of the project is remarkable. Since October 2026, Green has been seeking a project manager to oversee a large-scale strategic data center project involving multiple construction sites, central energy and site infrastructure, a planned capacity of approximately 300 megawatts, and an investment volume in the billions. The job posting does not explicitly name the location, but the description aligns with the announced phased campus development in Birr.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Waste Heat to Become a Location Factor<br><\/strong>The project focuses on more than just additional computing power. Green aims to utilize the waste heat from the future data centers as process heat and also make it available for a district heating network. In addition, there is a cooling concept featuring closed-loop systems in which water circulates but is not consumed. For property owners, municipalities, and utility companies, it is precisely this integration that is crucial. The value of a data center location is increasingly measured by whether electricity procurement, grid connectivity, and heat utilization can be integrated into a local energy system.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\">It remains to be seen what specific industrial and commercial uses will be accommodated on the site alongside the data centers. According to the municipality of Birr, the potential analysis for the entire development area is intended to clarify issues related to utility connections, access to the train station, and marketing. While the land purchase marks a significant first step, the actual development of the site depends on the next planning and infrastructure steps.<\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>In Birr, a 250,000-square-meter ABB site is changing hands and will become a new data center location. This move brings a long-stalled industrial development project to fruition and integrates digital infrastructure with waste heat recovery, commercial space, and public green spaces.<\/p>\n","protected":false},"author":2,"featured_media":168444,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[55990,55993,22698,55969],"tags":[12888,14593,63046,42817,52323,12525,12526,12528],"class_list":["post-168395","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-districts-areas","category-office-commercial","category-sustainability","category-transactions-deals","tag-aargau-en","tag-arealentwicklung-en","tag-birr","tag-datacenter-en","tag-digitale-infrastruktur-en","tag-immoinvest-en","tag-immonews-en","tag-news-en"],"acf":{"bild_mit_ki_erstellt_worden":["Ja"],"lead":"In Birr, a 250,000-square-meter ABB site is changing hands and will become a new data center location. This move brings a long-stalled industrial development project to fruition and integrates digital infrastructure with waste heat recovery, commercial space, and public green spaces.","autor":"","ort":"Aargau","bildunterschrift":"","zusammenfassung":"<ul>\r\n<li>Green \u00fcbernimmt in Birr ein 250\u2019000 Quadratmeter grosses Areal.<\/li>\r\n<li>Geplant ist ein Datacenter-Campus mit Abw\u00e4rmenutzung und Gewerbefl\u00e4chen.<\/li>\r\n<li>Die Entwicklung des Gebiets erfolgt etappenweise bis mindestens 2027.<\/li>\r\n<\/ul>\r\n","bild_im_grid":false,"gallerie":"","newsim":"4664"},"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"In Birr, a 250,000-square-meter ABB site is changing hands and will become a new data center location. This move brings a long-stalled industrial development project to fruition and integrates digital infrastructure with waste heat recovery, commercial space, and public green spaces.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"immovestuser\"\/>\n\t<meta name=\"google-site-verification\" content=\"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Birr Opens 250,000 Square Meters for Data and Heating - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:description\" content=\"In Birr, a 250,000-square-meter ABB site is changing hands and will become a new data center location. This move brings a long-stalled industrial development project to fruition and integrates digital infrastructure with waste heat recovery, commercial space, and public green spaces.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Green_Campus_ZRH1_Datacenter_4_redaktionelle_Nutzung.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Green_Campus_ZRH1_Datacenter_4_redaktionelle_Nutzung.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1299\" \/>\n\t\t<meta property=\"og:image:height\" content=\"798\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-10-27T08:20:07+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-27T08:21:51+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Birr Opens 250,000 Square Meters for Data and Heating - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta name=\"twitter:description\" content=\"In Birr, a 250,000-square-meter ABB site is changing hands and will become a new data center location. This move brings a long-stalled industrial development project to fruition and integrates digital infrastructure with waste heat recovery, commercial space, and public green spaces.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Green_Campus_ZRH1_Datacenter_4_redaktionelle_Nutzung.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\\\/#blogposting\",\"name\":\"Birr Opens 250,000 Square Meters for Data and Heating - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"headline\":\"Birr Opens 250,000 Square Meters for Data and Heating\",\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Green_Campus_ZRH1_Datacenter_4_redaktionelle_Nutzung.jpg\",\"width\":1299,\"height\":798},\"datePublished\":\"2026-10-27T09:20:07+01:00\",\"dateModified\":\"2026-10-27T09:21:51+01:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\\\/#webpage\"},\"articleSection\":\"Districts \\\/ Areas, Office \\\/ Commercial, Sustainability, Transactions \\\/ Deals, aargau, Arealentwicklung, Birr, Datacenter, digitale Infrastruktur, Immoinvest, immoNews, News, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/#listItem\",\"name\":\"Trends\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/#listItem\",\"position\":2,\"name\":\"Trends\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/sustainability\\\/#listItem\",\"name\":\"Sustainability\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/sustainability\\\/#listItem\",\"position\":3,\"name\":\"Sustainability\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/sustainability\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\\\/#listItem\",\"name\":\"Birr Opens 250,000 Square Meters for Data and Heating\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/#listItem\",\"name\":\"Trends\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\\\/#listItem\",\"position\":4,\"name\":\"Birr Opens 250,000 Square Meters for Data and Heating\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/sustainability\\\/#listItem\",\"name\":\"Sustainability\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"email\":\"admin@immomedia.ag\",\"telephone\":\"+41444420002\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/immoinvest_sm-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\\\/#organizationLogo\",\"width\":2560,\"height\":1340},\"image\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Immoinvest\\\/100077962920504\\\/\",\"https:\\\/\\\/x.com\\\/i\\\/flow\\\/login?redirect_after_login=immoinvest_ch\",\"https:\\\/\\\/www.instagram.com\\\/immoinvest_ch\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/immoinvest-swiss\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/\",\"name\":\"immovestuser\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"immovestuser\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\\\/#webpage\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\\\/\",\"name\":\"Birr Opens 250,000 Square Meters for Data and Heating - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"In Birr, a 250,000-square-meter ABB site is changing hands and will become a new data center location. This move brings a long-stalled industrial development project to fruition and integrates digital infrastructure with waste heat recovery, commercial space, and public green spaces.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Green_Campus_ZRH1_Datacenter_4_redaktionelle_Nutzung.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\\\/#mainImage\",\"width\":1299,\"height\":798},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\\\/#mainImage\"},\"datePublished\":\"2026-10-27T09:20:07+01:00\",\"dateModified\":\"2026-10-27T09:21:51+01:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Birr Opens 250,000 Square Meters for Data and Heating - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"In Birr, a 250,000-square-meter ABB site is changing hands and will become a new data center location. This move brings a long-stalled industrial development project to fruition and integrates digital infrastructure with waste heat recovery, commercial space, and public green spaces.","canonical_url":"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/#blogposting","name":"Birr Opens 250,000 Square Meters for Data and Heating - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","headline":"Birr Opens 250,000 Square Meters for Data and Heating","author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Green_Campus_ZRH1_Datacenter_4_redaktionelle_Nutzung.jpg","width":1299,"height":798},"datePublished":"2026-10-27T09:20:07+01:00","dateModified":"2026-10-27T09:21:51+01:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/#webpage"},"isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/#webpage"},"articleSection":"Districts \/ Areas, Office \/ Commercial, Sustainability, Transactions \/ Deals, aargau, Arealentwicklung, Birr, Datacenter, digitale Infrastruktur, Immoinvest, immoNews, News, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.immo-invest.ch\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/#listItem","name":"Trends"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/#listItem","position":2,"name":"Trends","item":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/sustainability\/#listItem","name":"Sustainability"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/sustainability\/#listItem","position":3,"name":"Sustainability","item":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/sustainability\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/#listItem","name":"Birr Opens 250,000 Square Meters for Data and Heating"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/#listItem","name":"Trends"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/#listItem","position":4,"name":"Birr Opens 250,000 Square Meters for Data and Heating","previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/sustainability\/#listItem","name":"Sustainability"}}]},{"@type":"Organization","@id":"https:\/\/www.immo-invest.ch\/en\/#organization","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","url":"https:\/\/www.immo-invest.ch\/en\/","email":"admin@immomedia.ag","telephone":"+41444420002","logo":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/09\/immoinvest_sm-scaled.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/#organizationLogo","width":2560,"height":1340},"image":{"@id":"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","https:\/\/x.com\/i\/flow\/login?redirect_after_login=immoinvest_ch","https:\/\/www.instagram.com\/immoinvest_ch\/","https:\/\/www.linkedin.com\/company\/immoinvest-swiss"]},{"@type":"Person","@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author","url":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/","name":"immovestuser","image":{"@type":"ImageObject","@id":"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g","width":96,"height":96,"caption":"immovestuser"}},{"@type":"WebPage","@id":"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/#webpage","url":"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/","name":"Birr Opens 250,000 Square Meters for Data and Heating - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"In Birr, a 250,000-square-meter ABB site is changing hands and will become a new data center location. This move brings a long-stalled industrial development project to fruition and integrates digital infrastructure with waste heat recovery, commercial space, and public green spaces.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/#breadcrumblist"},"author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"creator":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Green_Campus_ZRH1_Datacenter_4_redaktionelle_Nutzung.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/#mainImage","width":1299,"height":798},"primaryImageOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/#mainImage"},"datePublished":"2026-10-27T09:20:07+01:00","dateModified":"2026-10-27T09:21:51+01:00"},{"@type":"WebSite","@id":"https:\/\/www.immo-invest.ch\/en\/#website","url":"https:\/\/www.immo-invest.ch\/en\/","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien","og:type":"article","og:title":"Birr Opens 250,000 Square Meters for Data and Heating - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","og:description":"In Birr, a 250,000-square-meter ABB site is changing hands and will become a new data center location. This move brings a long-stalled industrial development project to fruition and integrates digital infrastructure with waste heat recovery, commercial space, and public green spaces.","og:url":"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/","og:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Green_Campus_ZRH1_Datacenter_4_redaktionelle_Nutzung.jpg","og:image:secure_url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Green_Campus_ZRH1_Datacenter_4_redaktionelle_Nutzung.jpg","og:image:width":1299,"og:image:height":798,"article:published_time":"2026-10-27T08:20:07+00:00","article:modified_time":"2026-10-27T08:21:51+00:00","article:publisher":"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","twitter:card":"summary_large_image","twitter:site":"@i","twitter:title":"Birr Opens 250,000 Square Meters for Data and Heating - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","twitter:description":"In Birr, a 250,000-square-meter ABB site is changing hands and will become a new data center location. This move brings a long-stalled industrial development project to fruition and integrates digital infrastructure with waste heat recovery, commercial space, and public green spaces.","twitter:creator":"@i","twitter:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Green_Campus_ZRH1_Datacenter_4_redaktionelle_Nutzung.jpg"},"aioseo_meta_data":{"post_id":"168395","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-10-27 08:21:51","updated":"2026-10-27 08:47:07","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/\" title=\"Trends\">Trends<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/sustainability\/\" title=\"Sustainability\">Sustainability<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tBirr Opens 250,000 Square Meters for Data and Heating\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.immo-invest.ch\/en\/"},{"label":"Trends","link":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/"},{"label":"Sustainability","link":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/sustainability\/"},{"label":"Birr Opens 250,000 Square Meters for Data and Heating","link":"https:\/\/www.immo-invest.ch\/en\/birr-oeffnet-250000-quadratmeter-fuer-daten-und-waerme\/"}],"featured_image_src":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Green_Campus_ZRH1_Datacenter_4_redaktionelle_Nutzung-336x168.jpg","_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/168395","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=168395"}],"version-history":[{"count":2,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/168395\/revisions"}],"predecessor-version":[{"id":168402,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/168395\/revisions\/168402"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/168444"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=168395"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=168395"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=168395"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}