{"id":168240,"date":"2026-10-23T07:30:00","date_gmt":"2026-10-23T05:30:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=168240"},"modified":"2026-10-21T10:21:47","modified_gmt":"2026-10-21T08:21:47","slug":"wittenbach-bekommt-62-wohnungen-bis-herbst-2028","status":"publish","type":"post","link":"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/","title":{"rendered":"Wittenbach is set to gain 62 flats by autumn 2028"},"content":{"rendered":"<p>Construction work has been underway since August 2026. This was preceded by a design competition, which was concluded in 2022, and the planning and approval process, for which planning permission was granted in August 2026. The project in Wittenbach is therefore moving from the planning stage to the implementation stage.<\/p>\n<p><strong>Four blocks in a central location<br \/><\/strong>Four four-storey blocks of flats are to be built, comprising a total of 62 rental flats. The plan is for a mix of 15 flats with 2.5 rooms, 22 units each with 3.5 and 4.5 rooms, and three flats with 5.5 rooms. The development is therefore aimed at households of various sizes and will strengthen the supply of rental flats near the railway station.<\/p>\n<p>The investment volume amounts to around 36 million Swiss francs, including land acquisition. Letting is due to begin in autumn 2027, with occupancy scheduled for autumn 2028. For institutional owners, the project demonstrates that substantial investment in new rental accommodation continues in well-connected communities in Eastern Switzerland.<\/p>\n<p><strong>Green spaces, energy and mobility<br \/><\/strong>The staggered building blocks open up to the west towards the Widenbach, giving all flats a direct connection to the green space. The plans also include fa\u00e7ades made of regional spruce, as well as an energy supply system comprising heat pumps and photovoltaic panels on the roofs. The mobility provision comprises 62 car parking spaces, eight motorbike spaces and 233 bicycle parking spaces, 201 of which are in dedicated bicycle storage areas.<\/p>\n<p>For the implementation, the client is relying on an eastern Swiss project team, with Itten Brechb\u00fchl responsible for the architecture and Forol for general planning and turnkey contracting. The Aurora Investment Foundation had already described the scheme as a key part of its project pipeline. With the start of construction, this pipeline entry is now becoming a real residential development with foreseeable market impact.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction has begun on the Widenbach development in Wittenbach. Four four-storey blocks of flats, comprising 62 rental flats built to the Minergie standard, are being built on the site. Around 36 million Swiss francs are being invested in the project, and letting is due to begin in autumn 2027.<\/p>\n","protected":false},"author":2,"featured_media":168241,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[12489,56026,56002,12501,22698],"tags":[12525,12526,13562,12679,12528,18741,12529,62327,62976],"class_list":["post-168240","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-new-construction","category-planning-development","category-residential","category-region-st-gallen-en","category-sustainability","tag-immoinvest-en","tag-immonews-en","tag-mietwohnungen-en","tag-minergie-en","tag-news-en","tag-ostschweiz-en","tag-photovoltaik-en","tag-wittenbach","tag-wohnuberbauung-widenbach"],"acf":{"bild_mit_ki_erstellt_worden":["Ja"],"lead":"Construction has begun on the Widenbach development in Wittenbach. Four four-storey blocks of flats, comprising 62 rental flats built to the Minergie standard, are being built on the site. Around 36 million Swiss francs are being invested in the project, and letting is due to begin in autumn 2027.","autor":"","ort":"Wittenbach\/St. Gallen","bildunterschrift":"","zusammenfassung":"<ul>\r\n \t<li>In Wittenbach hat der Bau von 62 Mietwohnungen begonnen.<\/li>\r\n \t<li>Die vier Mehrfamilienh\u00e4user sollen bis Herbst 2028 fertig sein.<\/li>\r\n \t<li>Rund 36 Millionen Franken fliessen in das Wohnprojekt.<\/li>\r\n<\/ul>","bild_im_grid":false,"gallerie":"","newsim":"4608"},"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.3 - aioseo.com -->\n\t<meta name=\"description\" content=\"Construction has begun on the Widenbach development in Wittenbach. Four four-storey blocks of flats, comprising 62 rental flats built to the Minergie standard, are being built on the site. Around 36 million Swiss francs are being invested in the project, and letting is due to begin in autumn 2027.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"immovestuser\"\/>\n\t<meta name=\"google-site-verification\" content=\"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.3\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Wittenbach is set to gain 62 flats by autumn 2028 - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:description\" content=\"Construction has begun on the Widenbach development in Wittenbach. Four four-storey blocks of flats, comprising 62 rental flats built to the Minergie standard, are being built on the site. Around 36 million Swiss francs are being invested in the project, and letting is due to begin in autumn 2027.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Wittenbach-bekommt-62-Wohnungen-bis-Herbst-2028-immo-invest.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Wittenbach-bekommt-62-Wohnungen-bis-Herbst-2028-immo-invest.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-10-23T05:30:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-21T08:21:47+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Wittenbach is set to gain 62 flats by autumn 2028 - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Construction has begun on the Widenbach development in Wittenbach. Four four-storey blocks of flats, comprising 62 rental flats built to the Minergie standard, are being built on the site. Around 36 million Swiss francs are being invested in the project, and letting is due to begin in autumn 2027.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Wittenbach-bekommt-62-Wohnungen-bis-Herbst-2028-immo-invest.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\\\/#blogposting\",\"name\":\"Wittenbach is set to gain 62 flats by autumn 2028 - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"headline\":\"Wittenbach is set to gain 62 flats by autumn 2028\",\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Wittenbach-bekommt-62-Wohnungen-bis-Herbst-2028-immo-invest.png\",\"width\":1536,\"height\":768},\"datePublished\":\"2026-10-23T07:30:00+02:00\",\"dateModified\":\"2026-10-21T10:21:47+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\\\/#webpage\"},\"articleSection\":\"New construction, Planning \\\/ Development, Residential, St. Gallen, Sustainability, Immoinvest, immoNews, Mietwohnungen, Minergie, News, Ostschweiz, Photovoltaik, Wittenbach, Wohn\\u00fcberbauung Widenbach, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"position\":2,\"name\":\"Regions\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"position\":3,\"name\":\"Switzerland\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/#listItem\",\"name\":\"Eastern Switzerland\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/#listItem\",\"position\":4,\"name\":\"Eastern Switzerland\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/region-st-gallen-en\\\/#listItem\",\"name\":\"St. Gallen\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/region-st-gallen-en\\\/#listItem\",\"position\":5,\"name\":\"St. Gallen\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/region-st-gallen-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\\\/#listItem\",\"name\":\"Wittenbach is set to gain 62 flats by autumn 2028\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/#listItem\",\"name\":\"Eastern Switzerland\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\\\/#listItem\",\"position\":6,\"name\":\"Wittenbach is set to gain 62 flats by autumn 2028\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/region-st-gallen-en\\\/#listItem\",\"name\":\"St. Gallen\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"email\":\"admin@immomedia.ag\",\"telephone\":\"+41444420002\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/immoinvest_sm-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\\\/#organizationLogo\",\"width\":2560,\"height\":1340},\"image\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Immoinvest\\\/100077962920504\\\/\",\"https:\\\/\\\/x.com\\\/i\\\/flow\\\/login?redirect_after_login=immoinvest_ch\",\"https:\\\/\\\/www.instagram.com\\\/immoinvest_ch\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/immoinvest-swiss\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/\",\"name\":\"immovestuser\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"immovestuser\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\\\/#webpage\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\\\/\",\"name\":\"Wittenbach is set to gain 62 flats by autumn 2028 - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Construction has begun on the Widenbach development in Wittenbach. Four four-storey blocks of flats, comprising 62 rental flats built to the Minergie standard, are being built on the site. Around 36 million Swiss francs are being invested in the project, and letting is due to begin in autumn 2027.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Wittenbach-bekommt-62-Wohnungen-bis-Herbst-2028-immo-invest.png\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\\\/#mainImage\",\"width\":1536,\"height\":768},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\\\/#mainImage\"},\"datePublished\":\"2026-10-23T07:30:00+02:00\",\"dateModified\":\"2026-10-21T10:21:47+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Wittenbach is set to gain 62 flats by autumn 2028 - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Construction has begun on the Widenbach development in Wittenbach. Four four-storey blocks of flats, comprising 62 rental flats built to the Minergie standard, are being built on the site. Around 36 million Swiss francs are being invested in the project, and letting is due to begin in autumn 2027.","canonical_url":"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/#blogposting","name":"Wittenbach is set to gain 62 flats by autumn 2028 - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","headline":"Wittenbach is set to gain 62 flats by autumn 2028","author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Wittenbach-bekommt-62-Wohnungen-bis-Herbst-2028-immo-invest.png","width":1536,"height":768},"datePublished":"2026-10-23T07:30:00+02:00","dateModified":"2026-10-21T10:21:47+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/#webpage"},"isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/#webpage"},"articleSection":"New construction, Planning \/ Development, Residential, St. Gallen, Sustainability, Immoinvest, immoNews, Mietwohnungen, Minergie, News, Ostschweiz, Photovoltaik, Wittenbach, Wohn\u00fcberbauung Widenbach, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.immo-invest.ch\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","position":2,"name":"Regions","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","position":3,"name":"Switzerland","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/#listItem","name":"Eastern Switzerland"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/#listItem","position":4,"name":"Eastern Switzerland","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/region-st-gallen-en\/#listItem","name":"St. Gallen"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/region-st-gallen-en\/#listItem","position":5,"name":"St. Gallen","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/region-st-gallen-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/#listItem","name":"Wittenbach is set to gain 62 flats by autumn 2028"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/#listItem","name":"Eastern Switzerland"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/#listItem","position":6,"name":"Wittenbach is set to gain 62 flats by autumn 2028","previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/region-st-gallen-en\/#listItem","name":"St. Gallen"}}]},{"@type":"Organization","@id":"https:\/\/www.immo-invest.ch\/en\/#organization","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","url":"https:\/\/www.immo-invest.ch\/en\/","email":"admin@immomedia.ag","telephone":"+41444420002","logo":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/09\/immoinvest_sm-scaled.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/#organizationLogo","width":2560,"height":1340},"image":{"@id":"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","https:\/\/x.com\/i\/flow\/login?redirect_after_login=immoinvest_ch","https:\/\/www.instagram.com\/immoinvest_ch\/","https:\/\/www.linkedin.com\/company\/immoinvest-swiss"]},{"@type":"Person","@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author","url":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/","name":"immovestuser","image":{"@type":"ImageObject","@id":"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g","width":96,"height":96,"caption":"immovestuser"}},{"@type":"WebPage","@id":"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/#webpage","url":"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/","name":"Wittenbach is set to gain 62 flats by autumn 2028 - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Construction has begun on the Widenbach development in Wittenbach. Four four-storey blocks of flats, comprising 62 rental flats built to the Minergie standard, are being built on the site. Around 36 million Swiss francs are being invested in the project, and letting is due to begin in autumn 2027.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/#breadcrumblist"},"author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"creator":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Wittenbach-bekommt-62-Wohnungen-bis-Herbst-2028-immo-invest.png","@id":"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/#mainImage","width":1536,"height":768},"primaryImageOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/#mainImage"},"datePublished":"2026-10-23T07:30:00+02:00","dateModified":"2026-10-21T10:21:47+02:00"},{"@type":"WebSite","@id":"https:\/\/www.immo-invest.ch\/en\/#website","url":"https:\/\/www.immo-invest.ch\/en\/","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien","og:type":"article","og:title":"Wittenbach is set to gain 62 flats by autumn 2028 - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","og:description":"Construction has begun on the Widenbach development in Wittenbach. Four four-storey blocks of flats, comprising 62 rental flats built to the Minergie standard, are being built on the site. Around 36 million Swiss francs are being invested in the project, and letting is due to begin in autumn 2027.","og:url":"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/","og:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Wittenbach-bekommt-62-Wohnungen-bis-Herbst-2028-immo-invest.png","og:image:secure_url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Wittenbach-bekommt-62-Wohnungen-bis-Herbst-2028-immo-invest.png","og:image:width":1536,"og:image:height":768,"article:published_time":"2026-10-23T05:30:00+00:00","article:modified_time":"2026-10-21T08:21:47+00:00","article:publisher":"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","twitter:card":"summary_large_image","twitter:site":"@i","twitter:title":"Wittenbach is set to gain 62 flats by autumn 2028 - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","twitter:description":"Construction has begun on the Widenbach development in Wittenbach. Four four-storey blocks of flats, comprising 62 rental flats built to the Minergie standard, are being built on the site. Around 36 million Swiss francs are being invested in the project, and letting is due to begin in autumn 2027.","twitter:creator":"@i","twitter:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Wittenbach-bekommt-62-Wohnungen-bis-Herbst-2028-immo-invest.png"},"aioseo_meta_data":{"post_id":"168240","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-10-21 08:21:50","updated":"2026-10-21 08:21:50","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/\" title=\"Regions\">Regions<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/\" title=\"Switzerland\">Switzerland<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/\" title=\"Eastern Switzerland\">Eastern Switzerland<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/region-st-gallen-en\/\" title=\"St. Gallen\">St. Gallen<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tWittenbach is set to gain 62 flats by autumn 2028\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.immo-invest.ch\/en\/"},{"label":"Regions","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/"},{"label":"Switzerland","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/"},{"label":"Eastern Switzerland","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/"},{"label":"St. Gallen","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/region-st-gallen-en\/"},{"label":"Wittenbach is set to gain 62 flats by autumn 2028","link":"https:\/\/www.immo-invest.ch\/en\/wittenbach-bekommt-62-wohnungen-bis-herbst-2028\/"}],"featured_image_src":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Wittenbach-bekommt-62-Wohnungen-bis-Herbst-2028-immo-invest-336x168.png","_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/168240","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=168240"}],"version-history":[{"count":2,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/168240\/revisions"}],"predecessor-version":[{"id":168251,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/168240\/revisions\/168251"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/168241"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=168240"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=168240"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=168240"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}