{"id":167840,"date":"2026-10-20T11:00:00","date_gmt":"2026-10-20T09:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=167840"},"modified":"2026-10-19T10:12:22","modified_gmt":"2026-10-19T08:12:22","slug":"flims-zieht-154245-quadratmeter-aus-der-bauzone","status":"publish","type":"post","link":"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/","title":{"rendered":"Flims is removing 154,245 square metres from the building zone"},"content":{"rendered":"<p>The government\u2019s decision of 15 October 2026 brings into force a local authority proposal that brings Flims into line with the requirements of the revised spatial planning legislation. The key point is the reduction in the size of the residential, mixed-use and town centre zones by around 154,245 square metres. In addition, there are higher minimum densities, a moderate increase in gross floor area and guidelines for subsequent planning.<\/p>\n<p><strong>Inward development becomes mandatory<br \/><\/strong>With this partial revision, Flims is responding to the first stage of the revised Spatial Planning Act, which aims to limit oversized building zones and steer settlement development inwards. This will have concrete implications for property owners in existing building zones. The municipality is introducing a building obligation with deadlines ranging from five to eight years, thereby increasing the pressure to actually utilise zoned land.<\/p>\n<p>It is also worth noting what Flims is not doing. According to a government statement, the municipality is largely refraining from additional measures to mobilise building land in existing garden and surrounding areas. Rather than a blanket intervention, the revision therefore relies on a combination of rezoning, densification and the time-limited activation of existing reserves.<\/p>\n<p><strong>Strategy and digital foundations adapted<br \/><\/strong>At the same time, the local plan has been adapted to the spatial development objectives set out in the \u2018Spatial Strategy for the Future of Flims\u2019. This strategy has served as the basis for the municipality\u2019s Spatial Planning Act-compliant revision of the plan for several years now. Furthermore, the proposal has been aligned with the latest standards for official surveying and the requirements of digitalisation.<\/p>\n<p>For the property and development sector, the Flims case is more than just a local planning measure. It demonstrates that tourism-oriented municipalities in Graub\u00fcnden must not only formally review their building zones, but also visibly reduce reserves and allocate building land with clear deadlines. Anyone pursuing housing projects in Flims will therefore face tighter planning guidelines and, at the same time, greater pressure to focus on the internal development of existing building areas.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Flims is drastically reducing its building zone. The Graub\u00fcnden cantonal government has approved the partial revision of the local development plan, which was adopted on 5 February 2025. At the same time, the municipality is stepping up the pressure on undeveloped building land by imposing construction deadlines of between five and eight years.<\/p>\n","protected":false},"author":2,"featured_media":167844,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[22349,56026,56002,22698],"tags":[45765,62894,12932,12525,12526,16968,12528,52822,39400],"class_list":["post-167840","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-graubuenden-en","category-planning-development","category-residential","category-sustainability","tag-bauzone-en","tag-flims","tag-graubuenden-en","tag-immoinvest-en","tag-immonews-en","tag-innenentwicklung-en","tag-news-en","tag-ortsplanung-en","tag-raumplanungsgesetz-en"],"acf":{"bild_mit_ki_erstellt_worden":["Ja"],"lead":"Flims is drastically reducing its building zone. The Graub\u00fcnden cantonal government has approved the partial revision of the local development plan, which was adopted on 5 February 2025. At the same time, the municipality is stepping up the pressure on undeveloped building land by imposing construction deadlines of between five and eight years.","autor":"","ort":"Flims\/Graub\u00fcnden","bildunterschrift":"","zusammenfassung":"<ul>\r\n \t<li>Flims verkleinert seine Bauzone um 154\u2019245 Quadratmeter.<\/li>\r\n \t<li>Die Regierung genehmigte die Teilrevision am 15. Oktober 2026.<\/li>\r\n \t<li>F\u00fcr Bauland gelten neu Baufristen von f\u00fcnf bis acht Jahren.<\/li>\r\n<\/ul>","bild_im_grid":false,"gallerie":"","newsim":"4485"},"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.3 - aioseo.com -->\n\t<meta name=\"description\" content=\"Flims is drastically reducing its building zone. The Graub\u00fcnden cantonal government has approved the partial revision of the local development plan, which was adopted on 5 February 2025. At the same time, the municipality is stepping up the pressure on undeveloped building land by imposing construction deadlines of between five and eight years.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"immovestuser\"\/>\n\t<meta name=\"google-site-verification\" content=\"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.3\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Flims is removing 154,245 square metres from the building zone - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:description\" content=\"Flims is drastically reducing its building zone. The Graub\u00fcnden cantonal government has approved the partial revision of the local development plan, which was adopted on 5 February 2025. At the same time, the municipality is stepping up the pressure on undeveloped building land by imposing construction deadlines of between five and eight years.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Flims-zieht-154245-Quadratmeter-aus-der-Bauzone-immo-invest.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Flims-zieht-154245-Quadratmeter-aus-der-Bauzone-immo-invest.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-10-20T09:00:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-19T08:12:22+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Flims is removing 154,245 square metres from the building zone - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Flims is drastically reducing its building zone. The Graub\u00fcnden cantonal government has approved the partial revision of the local development plan, which was adopted on 5 February 2025. At the same time, the municipality is stepping up the pressure on undeveloped building land by imposing construction deadlines of between five and eight years.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Flims-zieht-154245-Quadratmeter-aus-der-Bauzone-immo-invest.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/flims-zieht-154245-quadratmeter-aus-der-bauzone\\\/#blogposting\",\"name\":\"Flims is removing 154,245 square metres from the building zone - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"headline\":\"Flims is removing 154,245 square metres from the building zone\",\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Flims-zieht-154245-Quadratmeter-aus-der-Bauzone-immo-invest.png\",\"width\":1536,\"height\":768},\"datePublished\":\"2026-10-20T11:00:00+02:00\",\"dateModified\":\"2026-10-19T10:12:22+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/flims-zieht-154245-quadratmeter-aus-der-bauzone\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/flims-zieht-154245-quadratmeter-aus-der-bauzone\\\/#webpage\"},\"articleSection\":\"Graub\\u00fcnden, Planning \\\/ Development, Residential, Sustainability, Bauzone, Flims, Graub\\u00fcnden, Immoinvest, immoNews, Innenentwicklung, News, Ortsplanung, Raumplanungsgesetz, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/flims-zieht-154245-quadratmeter-aus-der-bauzone\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"position\":2,\"name\":\"Regions\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"position\":3,\"name\":\"Switzerland\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/#listItem\",\"name\":\"Eastern Switzerland\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/#listItem\",\"position\":4,\"name\":\"Eastern Switzerland\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/graubuenden-en\\\/#listItem\",\"name\":\"Graub\\u00fcnden\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/graubuenden-en\\\/#listItem\",\"position\":5,\"name\":\"Graub\\u00fcnden\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/graubuenden-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/flims-zieht-154245-quadratmeter-aus-der-bauzone\\\/#listItem\",\"name\":\"Flims is removing 154,245 square metres from the building zone\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/#listItem\",\"name\":\"Eastern Switzerland\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/flims-zieht-154245-quadratmeter-aus-der-bauzone\\\/#listItem\",\"position\":6,\"name\":\"Flims is removing 154,245 square metres from the building zone\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/graubuenden-en\\\/#listItem\",\"name\":\"Graub\\u00fcnden\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"email\":\"admin@immomedia.ag\",\"telephone\":\"+41444420002\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/immoinvest_sm-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/flims-zieht-154245-quadratmeter-aus-der-bauzone\\\/#organizationLogo\",\"width\":2560,\"height\":1340},\"image\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/flims-zieht-154245-quadratmeter-aus-der-bauzone\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Immoinvest\\\/100077962920504\\\/\",\"https:\\\/\\\/x.com\\\/i\\\/flow\\\/login?redirect_after_login=immoinvest_ch\",\"https:\\\/\\\/www.instagram.com\\\/immoinvest_ch\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/immoinvest-swiss\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/\",\"name\":\"immovestuser\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/flims-zieht-154245-quadratmeter-aus-der-bauzone\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"immovestuser\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/flims-zieht-154245-quadratmeter-aus-der-bauzone\\\/#webpage\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/flims-zieht-154245-quadratmeter-aus-der-bauzone\\\/\",\"name\":\"Flims is removing 154,245 square metres from the building zone - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Flims is drastically reducing its building zone. The Graub\\u00fcnden cantonal government has approved the partial revision of the local development plan, which was adopted on 5 February 2025. At the same time, the municipality is stepping up the pressure on undeveloped building land by imposing construction deadlines of between five and eight years.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/flims-zieht-154245-quadratmeter-aus-der-bauzone\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Flims-zieht-154245-Quadratmeter-aus-der-Bauzone-immo-invest.png\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/flims-zieht-154245-quadratmeter-aus-der-bauzone\\\/#mainImage\",\"width\":1536,\"height\":768},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/flims-zieht-154245-quadratmeter-aus-der-bauzone\\\/#mainImage\"},\"datePublished\":\"2026-10-20T11:00:00+02:00\",\"dateModified\":\"2026-10-19T10:12:22+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Flims is removing 154,245 square metres from the building zone - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Flims is drastically reducing its building zone. The Graub\u00fcnden cantonal government has approved the partial revision of the local development plan, which was adopted on 5 February 2025. At the same time, the municipality is stepping up the pressure on undeveloped building land by imposing construction deadlines of between five and eight years.","canonical_url":"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/#blogposting","name":"Flims is removing 154,245 square metres from the building zone - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","headline":"Flims is removing 154,245 square metres from the building zone","author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Flims-zieht-154245-Quadratmeter-aus-der-Bauzone-immo-invest.png","width":1536,"height":768},"datePublished":"2026-10-20T11:00:00+02:00","dateModified":"2026-10-19T10:12:22+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/#webpage"},"isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/#webpage"},"articleSection":"Graub\u00fcnden, Planning \/ Development, Residential, Sustainability, Bauzone, Flims, Graub\u00fcnden, Immoinvest, immoNews, Innenentwicklung, News, Ortsplanung, Raumplanungsgesetz, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.immo-invest.ch\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","position":2,"name":"Regions","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","position":3,"name":"Switzerland","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/#listItem","name":"Eastern Switzerland"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/#listItem","position":4,"name":"Eastern Switzerland","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/graubuenden-en\/#listItem","name":"Graub\u00fcnden"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/graubuenden-en\/#listItem","position":5,"name":"Graub\u00fcnden","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/graubuenden-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/#listItem","name":"Flims is removing 154,245 square metres from the building zone"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/#listItem","name":"Eastern Switzerland"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/#listItem","position":6,"name":"Flims is removing 154,245 square metres from the building zone","previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/graubuenden-en\/#listItem","name":"Graub\u00fcnden"}}]},{"@type":"Organization","@id":"https:\/\/www.immo-invest.ch\/en\/#organization","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","url":"https:\/\/www.immo-invest.ch\/en\/","email":"admin@immomedia.ag","telephone":"+41444420002","logo":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/09\/immoinvest_sm-scaled.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/#organizationLogo","width":2560,"height":1340},"image":{"@id":"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","https:\/\/x.com\/i\/flow\/login?redirect_after_login=immoinvest_ch","https:\/\/www.instagram.com\/immoinvest_ch\/","https:\/\/www.linkedin.com\/company\/immoinvest-swiss"]},{"@type":"Person","@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author","url":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/","name":"immovestuser","image":{"@type":"ImageObject","@id":"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g","width":96,"height":96,"caption":"immovestuser"}},{"@type":"WebPage","@id":"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/#webpage","url":"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/","name":"Flims is removing 154,245 square metres from the building zone - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Flims is drastically reducing its building zone. The Graub\u00fcnden cantonal government has approved the partial revision of the local development plan, which was adopted on 5 February 2025. At the same time, the municipality is stepping up the pressure on undeveloped building land by imposing construction deadlines of between five and eight years.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/#breadcrumblist"},"author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"creator":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Flims-zieht-154245-Quadratmeter-aus-der-Bauzone-immo-invest.png","@id":"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/#mainImage","width":1536,"height":768},"primaryImageOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/#mainImage"},"datePublished":"2026-10-20T11:00:00+02:00","dateModified":"2026-10-19T10:12:22+02:00"},{"@type":"WebSite","@id":"https:\/\/www.immo-invest.ch\/en\/#website","url":"https:\/\/www.immo-invest.ch\/en\/","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien","og:type":"article","og:title":"Flims is removing 154,245 square metres from the building zone - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","og:description":"Flims is drastically reducing its building zone. The Graub\u00fcnden cantonal government has approved the partial revision of the local development plan, which was adopted on 5 February 2025. At the same time, the municipality is stepping up the pressure on undeveloped building land by imposing construction deadlines of between five and eight years.","og:url":"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/","og:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Flims-zieht-154245-Quadratmeter-aus-der-Bauzone-immo-invest.png","og:image:secure_url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Flims-zieht-154245-Quadratmeter-aus-der-Bauzone-immo-invest.png","og:image:width":1536,"og:image:height":768,"article:published_time":"2026-10-20T09:00:00+00:00","article:modified_time":"2026-10-19T08:12:22+00:00","article:publisher":"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","twitter:card":"summary_large_image","twitter:site":"@i","twitter:title":"Flims is removing 154,245 square metres from the building zone - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","twitter:description":"Flims is drastically reducing its building zone. The Graub\u00fcnden cantonal government has approved the partial revision of the local development plan, which was adopted on 5 February 2025. At the same time, the municipality is stepping up the pressure on undeveloped building land by imposing construction deadlines of between five and eight years.","twitter:creator":"@i","twitter:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Flims-zieht-154245-Quadratmeter-aus-der-Bauzone-immo-invest.png"},"aioseo_meta_data":{"post_id":"167840","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-10-19 08:12:24","updated":"2026-10-20 09:13:32","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/\" title=\"Regions\">Regions<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/\" title=\"Switzerland\">Switzerland<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/\" title=\"Eastern Switzerland\">Eastern Switzerland<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/graubuenden-en\/\" title=\"Graub\u00fcnden\">Graub\u00fcnden<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tFlims is removing 154,245 square metres from the building zone\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.immo-invest.ch\/en\/"},{"label":"Regions","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/"},{"label":"Switzerland","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/"},{"label":"Eastern Switzerland","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/"},{"label":"Graub\u00fcnden","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/graubuenden-en\/"},{"label":"Flims is removing 154,245 square metres from the building zone","link":"https:\/\/www.immo-invest.ch\/en\/flims-zieht-154245-quadratmeter-aus-der-bauzone\/"}],"featured_image_src":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/10\/Flims-zieht-154245-Quadratmeter-aus-der-Bauzone-immo-invest-336x168.png","_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/167840","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=167840"}],"version-history":[{"count":2,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/167840\/revisions"}],"predecessor-version":[{"id":167852,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/167840\/revisions\/167852"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/167844"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=167840"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=167840"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=167840"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}