{"id":162926,"date":"2026-08-15T14:00:00","date_gmt":"2026-08-15T12:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=162926"},"modified":"2026-08-14T09:26:42","modified_gmt":"2026-08-14T07:26:42","slug":"bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe","status":"publish","type":"post","link":"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/","title":{"rendered":"Bruggerberg removes 27 flats from the waiting list"},"content":{"rendered":"<p>The planning permission for the \u2018Am Bruggerberg\u2019 development has been legally binding since 8 July. This means that a project can now go ahead which, according to the developers involved and media reports, had been held up for years by objections and legal proceedings. Three blocks of flats comprising a total of 27 owner-occupied flats are planned at Baslerstrasse 36 in Brugg.<\/p>\n<p>The project is valued at 16.6 million Swiss francs. The development was undertaken by the construction company M\u00fclig\u00e4ssli, which had already acquired the site in 2018. Merlo Architekten from Gebenstorf is named as the architectural firm, whilst UTA Immobilien is set to handle the marketing. According to those responsible for the project, the sales documentation is due to be published in September.<\/p>\n<p><strong>A rare plot on the<\/strong>Brugger<strong><br \/> slope<\/strong>The site is one of the last remaining large reserves of building land on the Bruggerberg. For this very reason, the project is more than just a routine development for the local housing market. New owner-occupied flats in this location are rare in Brugg, particularly as the range \u2013 featuring 3.5- to 5.5-room layouts and wheelchair-accessible designs \u2013 is deliberately aimed at a broad spectrum of buyers.<\/p>\n<p><strong>Costs drive up the price range<br \/><\/strong>Whilst the developers do not wish to refer to these as luxury flats, it is clear that the combination of the hillside location, lengthy procedures, technical requirements and Minergie standards is increasing cost pressures. The flats with large terraces on the upper floors are likely to be priced higher in particular.<\/p>\n<p><strong>Legal proceedings give way to sales<br \/><\/strong>For Brugg, the next step is no longer the<strong>legal<\/strong>process, but proving its worth on the market. After years of delays, it remains to be seen how viable the existing list of prospective buyers still is and how quickly new buyers can be attracted to one of the few larger residential developments on the Bruggerberg.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>At Baslerstrasse 36 in Brugg, a housing project that has been delayed for years has taken a decisive step forward. The planning permission for three blocks of flats comprising 27 owner-occupied flats is now legally binding, and marketing is set to begin in September.<\/p>\n","protected":false},"author":2,"featured_media":162927,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[12489,56026,56002,56029],"tags":[12888,14074,33525,61127,12562,12525,12526,12528,34492],"class_list":["post-162926","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-new-construction","category-planning-development","category-residential","category-sales-brokerage","tag-aargau-en","tag-baubewilligung-en","tag-brugg-en","tag-bruggerberg","tag-eigentumswohnungen-en","tag-immoinvest-en","tag-immonews-en","tag-news-en","tag-wohnprojekt-en"],"acf":{"bild_mit_ki_erstellt_worden":["Ja"],"lead":"At Baslerstrasse 36 in Brugg, a housing project that has been delayed for years has taken a decisive step forward. The planning permission for three blocks of flats comprising 27 owner-occupied flats is now legally binding, and marketing is set to begin in September.","autor":"","ort":"","bildunterschrift":"","zusammenfassung":"","bild_im_grid":false,"gallerie":"","newsim":"3671"},"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.2.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"At Baslerstrasse 36 in Brugg, a housing project that has been delayed for years has taken a decisive step forward. The planning permission for three blocks of flats comprising 27 owner-occupied flats is now legally binding, and marketing is set to begin in September.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"immovestuser\"\/>\n\t<meta name=\"google-site-verification\" content=\"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.2.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Bruggerberg removes 27 flats from the waiting list - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:description\" content=\"At Baslerstrasse 36 in Brugg, a housing project that has been delayed for years has taken a decisive step forward. The planning permission for three blocks of flats comprising 27 owner-occupied flats is now legally binding, and marketing is set to begin in September.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/08\/Bruggerberg-holt-27-Wohnungen-aus-der-Warteschlaufe-immo-invest.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/08\/Bruggerberg-holt-27-Wohnungen-aus-der-Warteschlaufe-immo-invest.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-08-15T12:00:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-08-14T07:26:42+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Bruggerberg removes 27 flats from the waiting list - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta name=\"twitter:description\" content=\"At Baslerstrasse 36 in Brugg, a housing project that has been delayed for years has taken a decisive step forward. The planning permission for three blocks of flats comprising 27 owner-occupied flats is now legally binding, and marketing is set to begin in September.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/08\/Bruggerberg-holt-27-Wohnungen-aus-der-Warteschlaufe-immo-invest.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\\\/#blogposting\",\"name\":\"Bruggerberg removes 27 flats from the waiting list - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"headline\":\"Bruggerberg removes 27 flats from the waiting list\",\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Bruggerberg-holt-27-Wohnungen-aus-der-Warteschlaufe-immo-invest.png\",\"width\":1536,\"height\":768},\"datePublished\":\"2026-08-15T14:00:00+02:00\",\"dateModified\":\"2026-08-14T09:26:42+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\\\/#webpage\"},\"articleSection\":\"New construction, Planning \\\/ Development, Residential, Sales \\\/ Brokerage, aargau, Baubewilligung, brugg, Bruggerberg, Eigentumswohnungen, Immoinvest, immoNews, News, Wohnprojekt, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/projects-en\\\/#listItem\",\"name\":\"Projects\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/projects-en\\\/#listItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/projects-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/projects-en\\\/new-construction\\\/#listItem\",\"name\":\"New construction\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/projects-en\\\/new-construction\\\/#listItem\",\"position\":3,\"name\":\"New construction\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/projects-en\\\/new-construction\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\\\/#listItem\",\"name\":\"Bruggerberg removes 27 flats from the waiting list\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/projects-en\\\/#listItem\",\"name\":\"Projects\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\\\/#listItem\",\"position\":4,\"name\":\"Bruggerberg removes 27 flats from the waiting list\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/projects-en\\\/new-construction\\\/#listItem\",\"name\":\"New construction\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"email\":\"admin@immomedia.ag\",\"telephone\":\"+41444420002\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/immoinvest_sm-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\\\/#organizationLogo\",\"width\":2560,\"height\":1340},\"image\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Immoinvest\\\/100077962920504\\\/\",\"https:\\\/\\\/x.com\\\/i\\\/flow\\\/login?redirect_after_login=immoinvest_ch\",\"https:\\\/\\\/www.instagram.com\\\/immoinvest_ch\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/immoinvest-swiss\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/\",\"name\":\"immovestuser\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"immovestuser\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\\\/#webpage\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\\\/\",\"name\":\"Bruggerberg removes 27 flats from the waiting list - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"At Baslerstrasse 36 in Brugg, a housing project that has been delayed for years has taken a decisive step forward. The planning permission for three blocks of flats comprising 27 owner-occupied flats is now legally binding, and marketing is set to begin in September.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Bruggerberg-holt-27-Wohnungen-aus-der-Warteschlaufe-immo-invest.png\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\\\/#mainImage\",\"width\":1536,\"height\":768},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\\\/#mainImage\"},\"datePublished\":\"2026-08-15T14:00:00+02:00\",\"dateModified\":\"2026-08-14T09:26:42+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Bruggerberg removes 27 flats from the waiting list - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"At Baslerstrasse 36 in Brugg, a housing project that has been delayed for years has taken a decisive step forward. The planning permission for three blocks of flats comprising 27 owner-occupied flats is now legally binding, and marketing is set to begin in September.","canonical_url":"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/#blogposting","name":"Bruggerberg removes 27 flats from the waiting list - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","headline":"Bruggerberg removes 27 flats from the waiting list","author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/08\/Bruggerberg-holt-27-Wohnungen-aus-der-Warteschlaufe-immo-invest.png","width":1536,"height":768},"datePublished":"2026-08-15T14:00:00+02:00","dateModified":"2026-08-14T09:26:42+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/#webpage"},"isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/#webpage"},"articleSection":"New construction, Planning \/ Development, Residential, Sales \/ Brokerage, aargau, Baubewilligung, brugg, Bruggerberg, Eigentumswohnungen, Immoinvest, immoNews, News, Wohnprojekt, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.immo-invest.ch\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/#listItem","name":"Projects"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/#listItem","position":2,"name":"Projects","item":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/new-construction\/#listItem","name":"New construction"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/new-construction\/#listItem","position":3,"name":"New construction","item":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/new-construction\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/#listItem","name":"Bruggerberg removes 27 flats from the waiting list"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/#listItem","name":"Projects"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/#listItem","position":4,"name":"Bruggerberg removes 27 flats from the waiting list","previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/new-construction\/#listItem","name":"New construction"}}]},{"@type":"Organization","@id":"https:\/\/www.immo-invest.ch\/en\/#organization","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","url":"https:\/\/www.immo-invest.ch\/en\/","email":"admin@immomedia.ag","telephone":"+41444420002","logo":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/09\/immoinvest_sm-scaled.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/#organizationLogo","width":2560,"height":1340},"image":{"@id":"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","https:\/\/x.com\/i\/flow\/login?redirect_after_login=immoinvest_ch","https:\/\/www.instagram.com\/immoinvest_ch\/","https:\/\/www.linkedin.com\/company\/immoinvest-swiss"]},{"@type":"Person","@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author","url":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/","name":"immovestuser","image":{"@type":"ImageObject","@id":"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g","width":96,"height":96,"caption":"immovestuser"}},{"@type":"WebPage","@id":"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/#webpage","url":"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/","name":"Bruggerberg removes 27 flats from the waiting list - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"At Baslerstrasse 36 in Brugg, a housing project that has been delayed for years has taken a decisive step forward. The planning permission for three blocks of flats comprising 27 owner-occupied flats is now legally binding, and marketing is set to begin in September.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/#breadcrumblist"},"author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"creator":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/08\/Bruggerberg-holt-27-Wohnungen-aus-der-Warteschlaufe-immo-invest.png","@id":"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/#mainImage","width":1536,"height":768},"primaryImageOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/#mainImage"},"datePublished":"2026-08-15T14:00:00+02:00","dateModified":"2026-08-14T09:26:42+02:00"},{"@type":"WebSite","@id":"https:\/\/www.immo-invest.ch\/en\/#website","url":"https:\/\/www.immo-invest.ch\/en\/","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien","og:type":"article","og:title":"Bruggerberg removes 27 flats from the waiting list - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","og:description":"At Baslerstrasse 36 in Brugg, a housing project that has been delayed for years has taken a decisive step forward. The planning permission for three blocks of flats comprising 27 owner-occupied flats is now legally binding, and marketing is set to begin in September.","og:url":"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/","og:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/08\/Bruggerberg-holt-27-Wohnungen-aus-der-Warteschlaufe-immo-invest.png","og:image:secure_url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/08\/Bruggerberg-holt-27-Wohnungen-aus-der-Warteschlaufe-immo-invest.png","og:image:width":1536,"og:image:height":768,"article:published_time":"2026-08-15T12:00:00+00:00","article:modified_time":"2026-08-14T07:26:42+00:00","article:publisher":"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","twitter:card":"summary_large_image","twitter:site":"@i","twitter:title":"Bruggerberg removes 27 flats from the waiting list - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","twitter:description":"At Baslerstrasse 36 in Brugg, a housing project that has been delayed for years has taken a decisive step forward. The planning permission for three blocks of flats comprising 27 owner-occupied flats is now legally binding, and marketing is set to begin in September.","twitter:creator":"@i","twitter:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/08\/Bruggerberg-holt-27-Wohnungen-aus-der-Warteschlaufe-immo-invest.png"},"aioseo_meta_data":{"post_id":"162926","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-08-14 07:25:54","updated":"2026-08-16 05:23:30","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/\" title=\"Projects\">Projects<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/new-construction\/\" title=\"New construction\">New construction<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tBruggerberg removes 27 flats from the waiting list\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.immo-invest.ch\/en\/"},{"label":"Projects","link":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/"},{"label":"New construction","link":"https:\/\/www.immo-invest.ch\/en\/category\/projects-en\/new-construction\/"},{"label":"Bruggerberg removes 27 flats from the waiting list","link":"https:\/\/www.immo-invest.ch\/en\/bruggerberg-holt-27-wohnungen-aus-der-warteschlaufe\/"}],"featured_image_src":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/08\/Bruggerberg-holt-27-Wohnungen-aus-der-Warteschlaufe-immo-invest-336x168.png","_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/162926","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=162926"}],"version-history":[{"count":3,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/162926\/revisions"}],"predecessor-version":[{"id":162934,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/162926\/revisions\/162934"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/162927"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=162926"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=162926"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=162926"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}