{"id":149297,"date":"2026-02-16T08:20:00","date_gmt":"2026-02-16T07:20:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=149297"},"modified":"2026-02-13T08:27:15","modified_gmt":"2026-02-13T07:27:15","slug":"rueckkehr-der-wilden-wasser-am-schaenzli","status":"publish","type":"post","link":"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/","title":{"rendered":"Return of the wild waters at Sch\u00e4nzli"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The Sch&auml;nzli site marks the beginning of a new <span class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;ERA&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Electronic Realty Associates; internationales Maklernetzwerk mit Schweizer Niederlassungen&nbsp;&lt;\/div&gt;\"  data-mobile-support=\"0\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex='0' role='link'>era<\/span> in landscape planning along the River Birs. The winning project, &ldquo;Aqua fera&rdquo; by Berchtold.Lenzin Landscape Architects, Versaplan and Holinger, frees the river from its rigid form and gives it freedom of movement. Shallow water zones, low-water channels and near-natural banks create habitats for fish, birds and amphibians, strengthen groundwater protection and make the floodplain landscape accessible again.<br><br>Visitor guidance via wooden walkways, piles of branches and defined paths protects sensitive areas, while a refreshment bar and small <span class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Event&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Erlebnisorientierte Veranstaltung zwecks Inszenierung von Produkten, Unternehmen oder Dienstleistungen&lt;\/div&gt;\"  data-mobile-support=\"0\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex='0' role='link'>event<\/span> areas at the northern entrance provide space for people to meet. Towards the south, the terrain becomes quieter, merging into the Vogelh&ouml;lzli nature reserve and opening up new perspectives on a revitalised Birs. Noise barriers along the motorway shield the area and at the same time form a new connection to the K&auml;ppeli district.<br><br><strong>City on the river<\/strong><br>The new Am Sch&auml;nzli quarter borders directly on the nature reserve. Three high-rise buildings with around 400 flats, offices, restaurants and leisure facilities, together with spacious open areas and commercial space, form a lively urban fragment at the gateway to Basel. The development meets the <span class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;SNBS&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Standard nachhaltiges Bauen Schweiz; Ziel des Standards ist es, die drei Dimensionen des nachhaltigen Bauens (Gesellschaft, Wirtschaft, Umwelt) m&ouml;glichst umfassend in Planung, Bau und Betrieb mit einzubeziehen&lt;\/div&gt;\"  data-mobile-support=\"0\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex='0' role='link'>SNBS<\/span> Gold Standard, focusing on photovoltaics, heat recovery, green roofs and a compact design with biodiversity zones between the buildings.<br><br>The mobility strategy prioritises slow traffic. Cycle, foot and tram connections link the neighbourhood with Basel-Stadt, the Birspark recreational area and the Hagnau sites. The principle of &ldquo;open space through density&rdquo; demonstrates its power here: a better quality of life through compact, intelligently organised construction.<br><br><strong>Cooperation and implementation<\/strong><br>The site development is financed by value-added levies on landowners in Hagnau and through public-private cooperation with the municipality of Muttenz. The neighbourhood planning process, which was approved after intensive public participation, forms the basis for the coordinated overall development of Hagnau East, Hagnau West and the Sch&auml;nzli site.<br><br>Construction of the high-rise buildings began in spring 2025 and will be completed in stages by 2029. While Am Sch&auml;nzli is growing, the southern river area remains undeveloped and is becoming the backbone of a coherent green network between the city and the countryside.<br><br><strong>A model for the future of cities and nature<\/strong><br>The Sch&auml;nzli project is symbolic of the new generation of Swiss urban development: ecologically regenerative, architecturally precise, socially integrated. It proves that economic density and ecological diversity are not mutually exclusive, but can reinforce each other.<br><br>With &ldquo;Aqua fera&rdquo;, the Birs is not only being renaturalised, it is being reintroduced into everyday urban life. Muttenz is thus demonstrating how forward-looking planning can harmonise open space, climate resilience and urban quality of life. The Sch&auml;nzli is becoming a living transition between city and nature and a powerful symbol for the return of wild waters.<\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>With the Sch\u00e4nzli site, Muttenz is launching a flagship project for ecological urban development and sustainable natural spaces. The winning project, &#8220;Aqua fera&#8221;, is bringing the Birs river back to life and creating an innovative neighbourhood at the gateway to Basel.<\/p>\n","protected":false},"author":57,"featured_media":149298,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"pmpro_default_level":"","inline_featured_image":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[55990,56002,22698],"tags":[14593,57179,12525,12526,12528,41097],"class_list":["post-149297","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-districts-areas","category-residential","category-sustainability","tag-arealentwicklung-en","tag-flussrevitalisierung","tag-immoinvest-en","tag-immonews-en","tag-news-en","tag-verdichtung-en","pmpro-has-access"],"acf":{"bild_mit_ki_erstellt_worden":"","lead":"With the Sch\u00e4nzli site, Muttenz is launching a flagship project for ecological urban development and sustainable natural spaces. The winning project, \"Aqua fera\", is bringing the Birs river back to life and creating an innovative neighbourhood at the gateway to Basel.\r\n","autor":"Karin Ibach","ort":"","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":""},"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.0.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"With the Sch\u00e4nzli site, Muttenz is launching a flagship project for ecological urban development and sustainable natural spaces. The winning project, &quot;Aqua fera&quot;, is bringing the Birs river back to life and creating an innovative neighbourhood at the gateway to Basel.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"immoinv_redakteur\"\/>\n\t<meta name=\"google-site-verification\" content=\"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.0.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Return of the wild waters at Sch\u00e4nzli - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:description\" content=\"With the Sch\u00e4nzli site, Muttenz is launching a flagship project for ecological urban development and sustainable natural spaces. The winning project, &quot;Aqua fera&quot;, is bringing the Birs river back to life and creating an innovative neighbourhood at the gateway to Basel.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/02\/HalterAG_Visualisierung_HagnauWest_BirsTower_2-1-scaled-1-e1770966898268.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/02\/HalterAG_Visualisierung_HagnauWest_BirsTower_2-1-scaled-1-e1770966898268.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1893\" \/>\n\t\t<meta property=\"og:image:height\" content=\"946\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-02-16T07:20:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-02-13T07:27:15+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Return of the wild waters at Sch\u00e4nzli - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta name=\"twitter:description\" content=\"With the Sch\u00e4nzli site, Muttenz is launching a flagship project for ecological urban development and sustainable natural spaces. The winning project, &quot;Aqua fera&quot;, is bringing the Birs river back to life and creating an innovative neighbourhood at the gateway to Basel.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/02\/HalterAG_Visualisierung_HagnauWest_BirsTower_2-1-scaled-1-e1770966898268.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/rueckkehr-der-wilden-wasser-am-schaenzli\\\/#blogposting\",\"name\":\"Return of the wild waters at Sch\\u00e4nzli - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"headline\":\"Return of the wild waters at Sch\\u00e4nzli\",\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immoinv_redakteur\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/HalterAG_Visualisierung_HagnauWest_BirsTower_2-1-scaled-1-e1770966898268.jpg\",\"width\":1893,\"height\":946,\"caption\":\"www.nightnurse.ch\"},\"datePublished\":\"2026-02-16T08:20:00+01:00\",\"dateModified\":\"2026-02-13T08:27:15+01:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/rueckkehr-der-wilden-wasser-am-schaenzli\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/rueckkehr-der-wilden-wasser-am-schaenzli\\\/#webpage\"},\"articleSection\":\"Districts \\\/ Areas, Residential, Sustainability, Arealentwicklung, Flussrevitalisierung, Immoinvest, immoNews, News, Verdichtung, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/rueckkehr-der-wilden-wasser-am-schaenzli\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/#listItem\",\"name\":\"Trends\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/#listItem\",\"position\":2,\"name\":\"Trends\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/sustainability\\\/#listItem\",\"name\":\"Sustainability\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/sustainability\\\/#listItem\",\"position\":3,\"name\":\"Sustainability\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/sustainability\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/rueckkehr-der-wilden-wasser-am-schaenzli\\\/#listItem\",\"name\":\"Return of the wild waters at Sch\\u00e4nzli\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/#listItem\",\"name\":\"Trends\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/rueckkehr-der-wilden-wasser-am-schaenzli\\\/#listItem\",\"position\":4,\"name\":\"Return of the wild waters at Sch\\u00e4nzli\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/trends-en\\\/sustainability\\\/#listItem\",\"name\":\"Sustainability\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"email\":\"admin@immomedia.ag\",\"telephone\":\"+41444420002\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/immoinvest_sm-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/rueckkehr-der-wilden-wasser-am-schaenzli\\\/#organizationLogo\",\"width\":2560,\"height\":1340},\"image\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/rueckkehr-der-wilden-wasser-am-schaenzli\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Immoinvest\\\/100077962920504\\\/\",\"https:\\\/\\\/x.com\\\/i\\\/flow\\\/login?redirect_after_login=immoinvest_ch\",\"https:\\\/\\\/www.instagram.com\\\/immoinvest_ch\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/immoinvest-swiss\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immoinv_redakteur\\\/#author\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immoinv_redakteur\\\/\",\"name\":\"immoinv_redakteur\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/rueckkehr-der-wilden-wasser-am-schaenzli\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c880e25d853edfb649661cf7cf8a7571fd0af3883a77197f45a3f15520d284a3?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"immoinv_redakteur\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/rueckkehr-der-wilden-wasser-am-schaenzli\\\/#webpage\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/rueckkehr-der-wilden-wasser-am-schaenzli\\\/\",\"name\":\"Return of the wild waters at Sch\\u00e4nzli - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"With the Sch\\u00e4nzli site, Muttenz is launching a flagship project for ecological urban development and sustainable natural spaces. The winning project, \\\"Aqua fera\\\", is bringing the Birs river back to life and creating an innovative neighbourhood at the gateway to Basel.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/rueckkehr-der-wilden-wasser-am-schaenzli\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immoinv_redakteur\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immoinv_redakteur\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/HalterAG_Visualisierung_HagnauWest_BirsTower_2-1-scaled-1-e1770966898268.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/rueckkehr-der-wilden-wasser-am-schaenzli\\\/#mainImage\",\"width\":1893,\"height\":946,\"caption\":\"www.nightnurse.ch\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/rueckkehr-der-wilden-wasser-am-schaenzli\\\/#mainImage\"},\"datePublished\":\"2026-02-16T08:20:00+01:00\",\"dateModified\":\"2026-02-13T08:27:15+01:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Return of the wild waters at Sch\u00e4nzli - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"With the Sch\u00e4nzli site, Muttenz is launching a flagship project for ecological urban development and sustainable natural spaces. The winning project, \"Aqua fera\", is bringing the Birs river back to life and creating an innovative neighbourhood at the gateway to Basel.","canonical_url":"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/#blogposting","name":"Return of the wild waters at Sch\u00e4nzli - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","headline":"Return of the wild waters at Sch\u00e4nzli","author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immoinv_redakteur\/#author"},"publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/02\/HalterAG_Visualisierung_HagnauWest_BirsTower_2-1-scaled-1-e1770966898268.jpg","width":1893,"height":946,"caption":"www.nightnurse.ch"},"datePublished":"2026-02-16T08:20:00+01:00","dateModified":"2026-02-13T08:27:15+01:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/#webpage"},"isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/#webpage"},"articleSection":"Districts \/ Areas, Residential, Sustainability, Arealentwicklung, Flussrevitalisierung, Immoinvest, immoNews, News, Verdichtung, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.immo-invest.ch\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/#listItem","name":"Trends"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/#listItem","position":2,"name":"Trends","item":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/sustainability\/#listItem","name":"Sustainability"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/sustainability\/#listItem","position":3,"name":"Sustainability","item":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/sustainability\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/#listItem","name":"Return of the wild waters at Sch\u00e4nzli"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/#listItem","name":"Trends"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/#listItem","position":4,"name":"Return of the wild waters at Sch\u00e4nzli","previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/sustainability\/#listItem","name":"Sustainability"}}]},{"@type":"Organization","@id":"https:\/\/www.immo-invest.ch\/en\/#organization","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","url":"https:\/\/www.immo-invest.ch\/en\/","email":"admin@immomedia.ag","telephone":"+41444420002","logo":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/09\/immoinvest_sm-scaled.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/#organizationLogo","width":2560,"height":1340},"image":{"@id":"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","https:\/\/x.com\/i\/flow\/login?redirect_after_login=immoinvest_ch","https:\/\/www.instagram.com\/immoinvest_ch\/","https:\/\/www.linkedin.com\/company\/immoinvest-swiss"]},{"@type":"Person","@id":"https:\/\/www.immo-invest.ch\/en\/author\/immoinv_redakteur\/#author","url":"https:\/\/www.immo-invest.ch\/en\/author\/immoinv_redakteur\/","name":"immoinv_redakteur","image":{"@type":"ImageObject","@id":"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/c880e25d853edfb649661cf7cf8a7571fd0af3883a77197f45a3f15520d284a3?s=96&d=mm&r=g","width":96,"height":96,"caption":"immoinv_redakteur"}},{"@type":"WebPage","@id":"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/#webpage","url":"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/","name":"Return of the wild waters at Sch\u00e4nzli - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"With the Sch\u00e4nzli site, Muttenz is launching a flagship project for ecological urban development and sustainable natural spaces. The winning project, \"Aqua fera\", is bringing the Birs river back to life and creating an innovative neighbourhood at the gateway to Basel.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/#breadcrumblist"},"author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immoinv_redakteur\/#author"},"creator":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immoinv_redakteur\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/02\/HalterAG_Visualisierung_HagnauWest_BirsTower_2-1-scaled-1-e1770966898268.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/#mainImage","width":1893,"height":946,"caption":"www.nightnurse.ch"},"primaryImageOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/#mainImage"},"datePublished":"2026-02-16T08:20:00+01:00","dateModified":"2026-02-13T08:27:15+01:00"},{"@type":"WebSite","@id":"https:\/\/www.immo-invest.ch\/en\/#website","url":"https:\/\/www.immo-invest.ch\/en\/","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien","og:type":"article","og:title":"Return of the wild waters at Sch\u00e4nzli - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","og:description":"With the Sch\u00e4nzli site, Muttenz is launching a flagship project for ecological urban development and sustainable natural spaces. The winning project, &quot;Aqua fera&quot;, is bringing the Birs river back to life and creating an innovative neighbourhood at the gateway to Basel.","og:url":"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/","og:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/02\/HalterAG_Visualisierung_HagnauWest_BirsTower_2-1-scaled-1-e1770966898268.jpg","og:image:secure_url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/02\/HalterAG_Visualisierung_HagnauWest_BirsTower_2-1-scaled-1-e1770966898268.jpg","og:image:width":1893,"og:image:height":946,"article:published_time":"2026-02-16T07:20:00+00:00","article:modified_time":"2026-02-13T07:27:15+00:00","article:publisher":"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","twitter:card":"summary_large_image","twitter:site":"@i","twitter:title":"Return of the wild waters at Sch\u00e4nzli - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","twitter:description":"With the Sch\u00e4nzli site, Muttenz is launching a flagship project for ecological urban development and sustainable natural spaces. The winning project, &quot;Aqua fera&quot;, is bringing the Birs river back to life and creating an innovative neighbourhood at the gateway to Basel.","twitter:creator":"@i","twitter:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/02\/HalterAG_Visualisierung_HagnauWest_BirsTower_2-1-scaled-1-e1770966898268.jpg"},"aioseo_meta_data":{"post_id":"149297","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"titles":[],"descriptions":[],"socialPosts":{"email":[],"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-02-13 07:27:17","updated":"2026-02-16 07:29:00","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/\" title=\"Trends\">Trends<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/sustainability\/\" title=\"Sustainability\">Sustainability<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tReturn of the wild waters at Sch\u00e4nzli\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.immo-invest.ch\/en\/"},{"label":"Trends","link":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/"},{"label":"Sustainability","link":"https:\/\/www.immo-invest.ch\/en\/category\/trends-en\/sustainability\/"},{"label":"Return of the wild waters at Sch\u00e4nzli","link":"https:\/\/www.immo-invest.ch\/en\/rueckkehr-der-wilden-wasser-am-schaenzli\/"}],"featured_image_src":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2026\/02\/HalterAG_Visualisierung_HagnauWest_BirsTower_2-1-scaled-1-e1770966898268-336x168.jpg","_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/149297","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/57"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=149297"}],"version-history":[{"count":2,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/149297\/revisions"}],"predecessor-version":[{"id":149306,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/149297\/revisions\/149306"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/149298"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=149297"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=149297"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=149297"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}