{"id":140839,"date":"2025-10-08T12:20:00","date_gmt":"2025-10-08T10:20:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=140839"},"modified":"2025-10-06T09:40:52","modified_gmt":"2025-10-06T07:40:52","slug":"solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf","status":"publish","type":"post","link":"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/","title":{"rendered":"Solar power plant above Klosters commences partial operation"},"content":{"rendered":"<p class=\"bodytext\">The first 15 per cent of Madrisa Solar feeds electricity into the grid. According to a <a href=\"https:\/\/www.repower.com\/ch\/medienmitteilungen\/madrisasolar-1\" target=\"_blank\" rel=\"noopener\">press release<\/a>, the first 500 solar tables are fitted with 3,000 bifacial solar modules. The electricity will be used to power the neighbouring <a href=\"https:\/\/www.madrisa.ch\/\" target=\"_blank\" rel=\"noopener\">Klosters-Madrisa mountain railways<\/a>.<\/p>\n<p class=\"bodytext\">The solar power plant at 2,000 metres above Klosters Dorf is set to achieve an output of 11 megawatt peak when fully built on an area of 150,000 square metres with around 20,000 solar modules. Of the 17 gigawatt hours of electricity, 40 per cent will be generated in the winter months between October and March. Commissioning of the entire plant is scheduled for autumn 2027. By autumn 2026, 50 to 60 percent of the output should already be available.<\/p>\n<p class=\"bodytext\">Madrisa Solar AG is a joint venture between <a href=\"https:\/\/www.repower.com\" target=\"_blank\" rel=\"noopener\">Repower<\/a>, <a href=\"https:\/\/www.ekz.ch\/\" target=\"_blank\" rel=\"noopener\">EKZ<\/a> and the municipality of Klosters, each of which holds a one-third stake. Madrisa Solar is the first solar power plant of the national solar express to feed electricity into the grid.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Madrisa Solar above Klosters Dorf has been connected to the grid with around 15 per cent of its planned output. This makes it the first Alpine solar power plant to feed electricity into the grid as part of the national solar express programme. The entire plant is scheduled for completion in autumn 2027.<\/p>\n","protected":false},"author":2,"featured_media":140834,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"pmpro_default_level":"","inline_featured_image":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[12482,22349,12476,12485,12487],"tags":[13822,12525,12526,54899,12528,54900,46628],"class_list":["post-140839","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","category-graubuenden-en","category-immonews","category-projects-en","category-regions-en","tag-erneuerbare-energie-en","tag-immoinvest-en","tag-immonews-en","tag-madrisa-solar","tag-news-en","tag-solarexpress","tag-solarkraftwerk-en","pmpro-has-access"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"Madrisa Solar above Klosters Dorf has been connected to the grid with around 15 per cent of its planned output. This makes it the first Alpine solar power plant to feed electricity into the grid as part of the national solar express programme. The entire plant is scheduled for completion in autumn 2027.","autor":"ce\/ug","ort":"Klosters GR","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":""},"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.0.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Madrisa Solar above Klosters Dorf has been connected to the grid with around 15 per cent of its planned output. This makes it the first Alpine solar power plant to feed electricity into the grid as part of the national solar express programme. The entire plant is scheduled for completion in autumn 2027.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"immovestuser\"\/>\n\t<meta name=\"google-site-verification\" content=\"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.0.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Solar power plant above Klosters commences partial operation - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:description\" content=\"Madrisa Solar above Klosters Dorf has been connected to the grid with around 15 per cent of its planned output. This makes it the first Alpine solar power plant to feed electricity into the grid as part of the national solar express programme. The entire plant is scheduled for completion in autumn 2027.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2025\/09\/banoviag_large_alpine_solar_power_plant_on_mountain_plateau_r_de8bd247-8c87-4e73-ac0e-296b64153956_1.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2025\/09\/banoviag_large_alpine_solar_power_plant_on_mountain_plateau_r_de8bd247-8c87-4e73-ac0e-296b64153956_1.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2025-10-08T10:20:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-10-06T07:40:52+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Solar power plant above Klosters commences partial operation - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Madrisa Solar above Klosters Dorf has been connected to the grid with around 15 per cent of its planned output. This makes it the first Alpine solar power plant to feed electricity into the grid as part of the national solar express programme. The entire plant is scheduled for completion in autumn 2027.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2025\/09\/banoviag_large_alpine_solar_power_plant_on_mountain_plateau_r_de8bd247-8c87-4e73-ac0e-296b64153956_1.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\\\/#blogposting\",\"name\":\"Solar power plant above Klosters commences partial operation - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"headline\":\"Solar power plant above Klosters commences partial operation\",\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/banoviag_large_alpine_solar_power_plant_on_mountain_plateau_r_de8bd247-8c87-4e73-ac0e-296b64153956_1.png\",\"width\":1536,\"height\":768},\"datePublished\":\"2025-10-08T12:20:00+02:00\",\"dateModified\":\"2025-10-06T09:40:52+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\\\/#webpage\"},\"articleSection\":\"Energy, Graub\\u00fcnden, immoNews, Projects, Regions, erneuerbare Energie, Immoinvest, immoNews, Madrisa Solar, News, Solarexpress, Solarkraftwerk, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"position\":2,\"name\":\"Regions\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"position\":3,\"name\":\"Switzerland\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/#listItem\",\"name\":\"Eastern Switzerland\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/#listItem\",\"position\":4,\"name\":\"Eastern Switzerland\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/graubuenden-en\\\/#listItem\",\"name\":\"Graub\\u00fcnden\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/graubuenden-en\\\/#listItem\",\"position\":5,\"name\":\"Graub\\u00fcnden\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/graubuenden-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\\\/#listItem\",\"name\":\"Solar power plant above Klosters commences partial operation\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/#listItem\",\"name\":\"Eastern Switzerland\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\\\/#listItem\",\"position\":6,\"name\":\"Solar power plant above Klosters commences partial operation\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/eastern-switzerland\\\/graubuenden-en\\\/#listItem\",\"name\":\"Graub\\u00fcnden\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"email\":\"admin@immomedia.ag\",\"telephone\":\"+41444420002\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/immoinvest_sm-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\\\/#organizationLogo\",\"width\":2560,\"height\":1340},\"image\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Immoinvest\\\/100077962920504\\\/\",\"https:\\\/\\\/x.com\\\/i\\\/flow\\\/login?redirect_after_login=immoinvest_ch\",\"https:\\\/\\\/www.instagram.com\\\/immoinvest_ch\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/immoinvest-swiss\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/\",\"name\":\"immovestuser\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"immovestuser\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\\\/#webpage\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\\\/\",\"name\":\"Solar power plant above Klosters commences partial operation - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Madrisa Solar above Klosters Dorf has been connected to the grid with around 15 per cent of its planned output. This makes it the first Alpine solar power plant to feed electricity into the grid as part of the national solar express programme. The entire plant is scheduled for completion in autumn 2027.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/banoviag_large_alpine_solar_power_plant_on_mountain_plateau_r_de8bd247-8c87-4e73-ac0e-296b64153956_1.png\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\\\/#mainImage\",\"width\":1536,\"height\":768},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\\\/#mainImage\"},\"datePublished\":\"2025-10-08T12:20:00+02:00\",\"dateModified\":\"2025-10-06T09:40:52+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Solar power plant above Klosters commences partial operation - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Madrisa Solar above Klosters Dorf has been connected to the grid with around 15 per cent of its planned output. This makes it the first Alpine solar power plant to feed electricity into the grid as part of the national solar express programme. The entire plant is scheduled for completion in autumn 2027.","canonical_url":"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/#blogposting","name":"Solar power plant above Klosters commences partial operation - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","headline":"Solar power plant above Klosters commences partial operation","author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2025\/09\/banoviag_large_alpine_solar_power_plant_on_mountain_plateau_r_de8bd247-8c87-4e73-ac0e-296b64153956_1.png","width":1536,"height":768},"datePublished":"2025-10-08T12:20:00+02:00","dateModified":"2025-10-06T09:40:52+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/#webpage"},"isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/#webpage"},"articleSection":"Energy, Graub\u00fcnden, immoNews, Projects, Regions, erneuerbare Energie, Immoinvest, immoNews, Madrisa Solar, News, Solarexpress, Solarkraftwerk, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.immo-invest.ch\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","position":2,"name":"Regions","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","position":3,"name":"Switzerland","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/#listItem","name":"Eastern Switzerland"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/#listItem","position":4,"name":"Eastern Switzerland","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/graubuenden-en\/#listItem","name":"Graub\u00fcnden"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/graubuenden-en\/#listItem","position":5,"name":"Graub\u00fcnden","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/graubuenden-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/#listItem","name":"Solar power plant above Klosters commences partial operation"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/#listItem","name":"Eastern Switzerland"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/#listItem","position":6,"name":"Solar power plant above Klosters commences partial operation","previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/graubuenden-en\/#listItem","name":"Graub\u00fcnden"}}]},{"@type":"Organization","@id":"https:\/\/www.immo-invest.ch\/en\/#organization","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","url":"https:\/\/www.immo-invest.ch\/en\/","email":"admin@immomedia.ag","telephone":"+41444420002","logo":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/09\/immoinvest_sm-scaled.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/#organizationLogo","width":2560,"height":1340},"image":{"@id":"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","https:\/\/x.com\/i\/flow\/login?redirect_after_login=immoinvest_ch","https:\/\/www.instagram.com\/immoinvest_ch\/","https:\/\/www.linkedin.com\/company\/immoinvest-swiss"]},{"@type":"Person","@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author","url":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/","name":"immovestuser","image":{"@type":"ImageObject","@id":"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g","width":96,"height":96,"caption":"immovestuser"}},{"@type":"WebPage","@id":"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/#webpage","url":"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/","name":"Solar power plant above Klosters commences partial operation - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Madrisa Solar above Klosters Dorf has been connected to the grid with around 15 per cent of its planned output. This makes it the first Alpine solar power plant to feed electricity into the grid as part of the national solar express programme. The entire plant is scheduled for completion in autumn 2027.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/#breadcrumblist"},"author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"creator":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2025\/09\/banoviag_large_alpine_solar_power_plant_on_mountain_plateau_r_de8bd247-8c87-4e73-ac0e-296b64153956_1.png","@id":"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/#mainImage","width":1536,"height":768},"primaryImageOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/#mainImage"},"datePublished":"2025-10-08T12:20:00+02:00","dateModified":"2025-10-06T09:40:52+02:00"},{"@type":"WebSite","@id":"https:\/\/www.immo-invest.ch\/en\/#website","url":"https:\/\/www.immo-invest.ch\/en\/","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien","og:type":"article","og:title":"Solar power plant above Klosters commences partial operation - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","og:description":"Madrisa Solar above Klosters Dorf has been connected to the grid with around 15 per cent of its planned output. This makes it the first Alpine solar power plant to feed electricity into the grid as part of the national solar express programme. The entire plant is scheduled for completion in autumn 2027.","og:url":"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/","og:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2025\/09\/banoviag_large_alpine_solar_power_plant_on_mountain_plateau_r_de8bd247-8c87-4e73-ac0e-296b64153956_1.png","og:image:secure_url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2025\/09\/banoviag_large_alpine_solar_power_plant_on_mountain_plateau_r_de8bd247-8c87-4e73-ac0e-296b64153956_1.png","og:image:width":1536,"og:image:height":768,"article:published_time":"2025-10-08T10:20:00+00:00","article:modified_time":"2025-10-06T07:40:52+00:00","article:publisher":"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","twitter:card":"summary_large_image","twitter:site":"@i","twitter:title":"Solar power plant above Klosters commences partial operation - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","twitter:description":"Madrisa Solar above Klosters Dorf has been connected to the grid with around 15 per cent of its planned output. This makes it the first Alpine solar power plant to feed electricity into the grid as part of the national solar express programme. The entire plant is scheduled for completion in autumn 2027.","twitter:creator":"@i","twitter:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2025\/09\/banoviag_large_alpine_solar_power_plant_on_mountain_plateau_r_de8bd247-8c87-4e73-ac0e-296b64153956_1.png"},"aioseo_meta_data":{"post_id":"140839","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"titles":[],"descriptions":[],"socialPosts":{"email":[],"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2025-10-03 07:08:24","updated":"2025-10-25 02:46:13","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/\" title=\"Regions\">Regions<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/\" title=\"Switzerland\">Switzerland<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/\" title=\"Eastern Switzerland\">Eastern Switzerland<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/graubuenden-en\/\" title=\"Graub\u00fcnden\">Graub\u00fcnden<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tSolar power plant above Klosters commences partial operation\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.immo-invest.ch\/en\/"},{"label":"Regions","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/"},{"label":"Switzerland","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/"},{"label":"Eastern Switzerland","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/"},{"label":"Graub\u00fcnden","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/eastern-switzerland\/graubuenden-en\/"},{"label":"Solar power plant above Klosters commences partial operation","link":"https:\/\/www.immo-invest.ch\/en\/solarkraftwerk-oberhalb-klosters-nimmt-teilbetrieb-auf\/"}],"featured_image_src":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2025\/09\/banoviag_large_alpine_solar_power_plant_on_mountain_plateau_r_de8bd247-8c87-4e73-ac0e-296b64153956_1-336x168.png","_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/140839","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=140839"}],"version-history":[{"count":0,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/140839\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/140834"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=140839"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=140839"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=140839"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}