{"id":121911,"date":"2024-12-17T16:00:00","date_gmt":"2024-12-17T15:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=121911"},"modified":"2024-12-17T10:40:39","modified_gmt":"2024-12-17T09:40:39","slug":"letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz","status":"publish","type":"post","link":"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/","title":{"rendered":"Final construction phase for sustainable development in Rotkreuz"},"content":{"rendered":"\n\n<p class=\"bodytext wp-block-paragraph\"><a href=\"https:\/\/zugestates.ch\/\" target=\"_blank\" rel=\"noopener\">Zug Estates<\/a> is tackling the final construction project in the development of the Suurstoffi site in Rotkreuz, which began in 2010. The Zug real estate company announced in a <a href=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=redirect&#038;url=d381948a8837c9b9ade064d24390b3d0&#038;application_id=2045383&#038;site_id=news_data&#038;application_name=news\" target=\"_blank\" rel=\"noopener\">press release<\/a> that the ground-breaking ceremony for the two new buildings Suurstoffi 43 and 45 was held at the beginning of December together with representatives from the authorities and project partners. Together with a central park, they are due to be completed by mid-2027.<\/p>\n\n\n\n\n\n<p class=\"bodytext wp-block-paragraph\">Zug Estates is creating around 14,400 square metres of office and training space in the two new properties. A further 1,100 square metres have been designed as living space for student accommodation. Once completed, the Suurstoffi 45 property will be home to the Central Switzerland Health Education Centre<a href=\"https:\/\/xund.ch\/\" target=\"_blank\" rel=\"noopener\">(XUND<\/a>). The training centre is relocating from Alpnach OW to Rotkreuz in order to meet the growing demand for practical healthcare training and changing training models. XUND and Zug Estates signed a long-term rental agreement for Suurstoffi 45 in September.<\/p>\n\n\n\n\n\n<p class=\"bodytext wp-block-paragraph\">The final development project for the site &#8220;fits seamlessly into the Suurstoffi site, both architecturally and in terms of sustainability&#8221;, writes Zug Estates. &#8220;The existing, almost emission-free energy system&#8221; will have another geothermal probe field. The proportion of grey energy will be lower than in comparable properties thanks to a reduced basement level and the optimisation of fa\u00e7ades, building services and statics.<\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>Zug Estates has celebrated the ground-breaking ceremony for the final new-build project on the Suurstoffi site in Rotkreuz. Two buildings and a central park should be completed by mid-2027. The Central Switzerland Health Education Centre will move into one of the new buildings.<\/p>\n","protected":false},"author":2,"featured_media":121906,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"pmpro_default_level":"","_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[12476,12489,12485,22698,12504],"tags":[51184,13443,12525,12526,12847,12528,51185,51186,12814],"class_list":["post-121911","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-immonews","category-new-construction","category-projects-en","category-sustainability","category-region-zug-en","tag-buero-2-en","tag-energieeffizienz-en","tag-immoinvest-en","tag-immonews-en","tag-nachhaltigkeit-en","tag-news-en","tag-schulungsflaechen-en","tag-studentisches-wohnen-en","tag-zentralschweiz-en","pmpro-has-access"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"Zug Estates has celebrated the ground-breaking ceremony for the final new-build project on the Suurstoffi site in Rotkreuz. Two buildings and a central park should be completed by mid-2027. The Central Switzerland Health Education Centre will move into one of the new buildings.","autor":"ce\/hs","ort":"Zug\/Rotkreuz ZG","bildunterschrift":"","zusammenfassung":"","bild_im_grid":false,"gallerie":"","newsim":""},"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Zug Estates has celebrated the ground-breaking ceremony for the final new-build project on the Suurstoffi site in Rotkreuz. Two buildings and a central park should be completed by mid-2027. The Central Switzerland Health Education Centre will move into one of the new buildings.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"immovestuser\"\/>\n\t<meta name=\"google-site-verification\" content=\"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Final construction phase for sustainable development in Rotkreuz - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:description\" content=\"Zug Estates has celebrated the ground-breaking ceremony for the final new-build project on the Suurstoffi site in Rotkreuz. Two buildings and a central park should be completed by mid-2027. The Central Switzerland Health Education Centre will move into one of the new buildings.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/12\/immo-invest_zug_nachhaltigkeit_suurstoffi_energieeffizienz_neubau.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/12\/immo-invest_zug_nachhaltigkeit_suurstoffi_energieeffizienz_neubau.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-12-17T15:00:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-12-17T09:40:39+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Final construction phase for sustainable development in Rotkreuz - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Zug Estates has celebrated the ground-breaking ceremony for the final new-build project on the Suurstoffi site in Rotkreuz. Two buildings and a central park should be completed by mid-2027. The Central Switzerland Health Education Centre will move into one of the new buildings.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/12\/immo-invest_zug_nachhaltigkeit_suurstoffi_energieeffizienz_neubau.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\\\/#blogposting\",\"name\":\"Final construction phase for sustainable development in Rotkreuz - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"headline\":\"Final construction phase for sustainable development in Rotkreuz\",\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/immo-invest_zug_nachhaltigkeit_suurstoffi_energieeffizienz_neubau.png\",\"width\":1536,\"height\":768},\"datePublished\":\"2024-12-17T16:00:00+01:00\",\"dateModified\":\"2024-12-17T10:40:39+01:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\\\/#webpage\"},\"articleSection\":\"immoNews, New construction, Projects, Sustainability, Zug, buero, Energieeffizienz, Immoinvest, immoNews, Nachhaltigkeit, News, schulungsflaechen, studentisches wohnen, Zentralschweiz, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"position\":2,\"name\":\"Regions\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"position\":3,\"name\":\"Switzerland\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zentralschweiz-en\\\/#listItem\",\"name\":\"Zentralschweiz\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zentralschweiz-en\\\/#listItem\",\"position\":4,\"name\":\"Zentralschweiz\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zentralschweiz-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zentralschweiz-en\\\/region-zug-en\\\/#listItem\",\"name\":\"Zug\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zentralschweiz-en\\\/region-zug-en\\\/#listItem\",\"position\":5,\"name\":\"Zug\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zentralschweiz-en\\\/region-zug-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\\\/#listItem\",\"name\":\"Final construction phase for sustainable development in Rotkreuz\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zentralschweiz-en\\\/#listItem\",\"name\":\"Zentralschweiz\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\\\/#listItem\",\"position\":6,\"name\":\"Final construction phase for sustainable development in Rotkreuz\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zentralschweiz-en\\\/region-zug-en\\\/#listItem\",\"name\":\"Zug\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"email\":\"admin@immomedia.ag\",\"telephone\":\"+41444420002\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/immoinvest_sm-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\\\/#organizationLogo\",\"width\":2560,\"height\":1340},\"image\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Immoinvest\\\/100077962920504\\\/\",\"https:\\\/\\\/x.com\\\/i\\\/flow\\\/login?redirect_after_login=immoinvest_ch\",\"https:\\\/\\\/www.instagram.com\\\/immoinvest_ch\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/immoinvest-swiss\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/\",\"name\":\"immovestuser\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"immovestuser\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\\\/#webpage\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\\\/\",\"name\":\"Final construction phase for sustainable development in Rotkreuz - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Zug Estates has celebrated the ground-breaking ceremony for the final new-build project on the Suurstoffi site in Rotkreuz. Two buildings and a central park should be completed by mid-2027. The Central Switzerland Health Education Centre will move into one of the new buildings.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/immo-invest_zug_nachhaltigkeit_suurstoffi_energieeffizienz_neubau.png\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\\\/#mainImage\",\"width\":1536,\"height\":768},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\\\/#mainImage\"},\"datePublished\":\"2024-12-17T16:00:00+01:00\",\"dateModified\":\"2024-12-17T10:40:39+01:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Final construction phase for sustainable development in Rotkreuz - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Zug Estates has celebrated the ground-breaking ceremony for the final new-build project on the Suurstoffi site in Rotkreuz. Two buildings and a central park should be completed by mid-2027. The Central Switzerland Health Education Centre will move into one of the new buildings.","canonical_url":"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/#blogposting","name":"Final construction phase for sustainable development in Rotkreuz - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","headline":"Final construction phase for sustainable development in Rotkreuz","author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/12\/immo-invest_zug_nachhaltigkeit_suurstoffi_energieeffizienz_neubau.png","width":1536,"height":768},"datePublished":"2024-12-17T16:00:00+01:00","dateModified":"2024-12-17T10:40:39+01:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/#webpage"},"isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/#webpage"},"articleSection":"immoNews, New construction, Projects, Sustainability, Zug, buero, Energieeffizienz, Immoinvest, immoNews, Nachhaltigkeit, News, schulungsflaechen, studentisches wohnen, Zentralschweiz, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.immo-invest.ch\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","position":2,"name":"Regions","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","position":3,"name":"Switzerland","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zentralschweiz-en\/#listItem","name":"Zentralschweiz"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zentralschweiz-en\/#listItem","position":4,"name":"Zentralschweiz","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zentralschweiz-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zentralschweiz-en\/region-zug-en\/#listItem","name":"Zug"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zentralschweiz-en\/region-zug-en\/#listItem","position":5,"name":"Zug","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zentralschweiz-en\/region-zug-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/#listItem","name":"Final construction phase for sustainable development in Rotkreuz"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zentralschweiz-en\/#listItem","name":"Zentralschweiz"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/#listItem","position":6,"name":"Final construction phase for sustainable development in Rotkreuz","previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zentralschweiz-en\/region-zug-en\/#listItem","name":"Zug"}}]},{"@type":"Organization","@id":"https:\/\/www.immo-invest.ch\/en\/#organization","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","url":"https:\/\/www.immo-invest.ch\/en\/","email":"admin@immomedia.ag","telephone":"+41444420002","logo":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/09\/immoinvest_sm-scaled.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/#organizationLogo","width":2560,"height":1340},"image":{"@id":"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","https:\/\/x.com\/i\/flow\/login?redirect_after_login=immoinvest_ch","https:\/\/www.instagram.com\/immoinvest_ch\/","https:\/\/www.linkedin.com\/company\/immoinvest-swiss"]},{"@type":"Person","@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author","url":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/","name":"immovestuser","image":{"@type":"ImageObject","@id":"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g","width":96,"height":96,"caption":"immovestuser"}},{"@type":"WebPage","@id":"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/#webpage","url":"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/","name":"Final construction phase for sustainable development in Rotkreuz - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Zug Estates has celebrated the ground-breaking ceremony for the final new-build project on the Suurstoffi site in Rotkreuz. Two buildings and a central park should be completed by mid-2027. The Central Switzerland Health Education Centre will move into one of the new buildings.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/#breadcrumblist"},"author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"creator":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/12\/immo-invest_zug_nachhaltigkeit_suurstoffi_energieeffizienz_neubau.png","@id":"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/#mainImage","width":1536,"height":768},"primaryImageOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/#mainImage"},"datePublished":"2024-12-17T16:00:00+01:00","dateModified":"2024-12-17T10:40:39+01:00"},{"@type":"WebSite","@id":"https:\/\/www.immo-invest.ch\/en\/#website","url":"https:\/\/www.immo-invest.ch\/en\/","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien","og:type":"article","og:title":"Final construction phase for sustainable development in Rotkreuz - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","og:description":"Zug Estates has celebrated the ground-breaking ceremony for the final new-build project on the Suurstoffi site in Rotkreuz. Two buildings and a central park should be completed by mid-2027. The Central Switzerland Health Education Centre will move into one of the new buildings.","og:url":"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/","og:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/12\/immo-invest_zug_nachhaltigkeit_suurstoffi_energieeffizienz_neubau.png","og:image:secure_url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/12\/immo-invest_zug_nachhaltigkeit_suurstoffi_energieeffizienz_neubau.png","og:image:width":1536,"og:image:height":768,"article:published_time":"2024-12-17T15:00:00+00:00","article:modified_time":"2024-12-17T09:40:39+00:00","article:publisher":"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","twitter:card":"summary_large_image","twitter:site":"@i","twitter:title":"Final construction phase for sustainable development in Rotkreuz - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","twitter:description":"Zug Estates has celebrated the ground-breaking ceremony for the final new-build project on the Suurstoffi site in Rotkreuz. Two buildings and a central park should be completed by mid-2027. The Central Switzerland Health Education Centre will move into one of the new buildings.","twitter:creator":"@i","twitter:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/12\/immo-invest_zug_nachhaltigkeit_suurstoffi_energieeffizienz_neubau.png"},"aioseo_meta_data":{"post_id":"121911","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-12-17 09:40:39","updated":"2025-10-24 14:43:14","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/\" title=\"Regions\">Regions<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/\" title=\"Switzerland\">Switzerland<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zentralschweiz-en\/\" title=\"Zentralschweiz\">Zentralschweiz<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zentralschweiz-en\/region-zug-en\/\" title=\"Zug\">Zug<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tFinal construction phase for sustainable development in Rotkreuz\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.immo-invest.ch\/en\/"},{"label":"Regions","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/"},{"label":"Switzerland","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/"},{"label":"Zentralschweiz","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zentralschweiz-en\/"},{"label":"Zug","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zentralschweiz-en\/region-zug-en\/"},{"label":"Final construction phase for sustainable development in Rotkreuz","link":"https:\/\/www.immo-invest.ch\/en\/letzte-bauetappe-fuer-nachhaltige-entwicklung-in-rotkreuz\/"}],"featured_image_src":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/12\/immo-invest_zug_nachhaltigkeit_suurstoffi_energieeffizienz_neubau-336x168.png","_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/121911","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=121911"}],"version-history":[{"count":0,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/121911\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/121906"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=121911"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=121911"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=121911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}