{"id":118632,"date":"2024-10-30T14:26:59","date_gmt":"2024-10-30T13:26:59","guid":{"rendered":"https:\/\/www.immo-invest.ch\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/"},"modified":"2024-10-30T14:32:29","modified_gmt":"2024-10-30T13:32:29","slug":"solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb","status":"publish","type":"post","link":"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/","title":{"rendered":"Solar power: first system of the second project in operation"},"content":{"rendered":"<p class=\"bodytext\"><a href=\"https:\/\/zauggag.com\/\" target=\"_blank\" rel=\"noopener\">Zaugg Schlieren AG<\/a> put the first third of its second solar plant in Schlieren into operation in mid-October. The corresponding building permit was only applied for at the end of February, the Schlieren-based packaging and logistics specialist reports in a <a href=\"https:\/\/www.linkedin.com\/posts\/zaugg-emballeur-ag_pack-send-shipping-activity-7252951603941404672-iVYG\" target=\"_blank\" rel=\"noopener\">post<\/a> on LinkedIn. The installed capacity is stated as 98.28 kilowatts peak. This means that around 95 megawatt hours of solar power can be produced each year.<\/p>\n<p class=\"bodytext\">By 2026, Zaugg Schlieren plans to have installed solar systems with a total output of 271.47 kilowatts peak. This means that around 263 megawatt hours of solar power can be generated each year. The company was founded in 1977 by Werner Zaugg on the site of the recently decommissioned gasworks in Schlieren. Since 2011 <a href=\"https:\/\/zauggag.com\/unternehmen\/\" target=\"_blank\" rel=\"noopener\">,<\/a> Switzerland&#8217;s first professional transport packaging and crate manufacturer has also been represented with a site in China.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Zaugg Schlieren AG commissioned the first third of its second solar plant in mid-October. The installed capacity is 98.28 kilowatts peak, which means that around 95 megawatt hours of solar power can be produced annually. The company plans to install solar systems with a total output of 271.47 kilowatts peak by 2026.<\/p>\n","protected":false},"author":2,"featured_media":118627,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"pmpro_default_level":"","inline_featured_image":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[22697,12476,22698,12493],"tags":[40232,12525,12526,12528,12750,50263],"class_list":["post-118632","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company","category-immonews","category-sustainability","category-region-zurich-en","tag-erneuerbare-energien-en","tag-immoinvest-en","tag-immonews-en","tag-news-en","tag-solarenergie-en","tag-zaugg-schlieren-en","pmpro-has-access"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"Zaugg Schlieren AG commissioned the first third of its second solar plant in mid-October. The installed capacity is 98.28 kilowatts peak, which means that around 95 megawatt hours of solar power can be produced annually. The company plans to install solar systems with a total output of 271.47 kilowatts peak by 2026.","autor":"","ort":"Schlieren ZH","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":""},"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Zaugg Schlieren AG commissioned the first third of its second solar plant in mid-October. The installed capacity is 98.28 kilowatts peak, which means that around 95 megawatt hours of solar power can be produced annually. The company plans to install solar systems with a total output of 271.47 kilowatts peak by 2026.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"immovestuser\"\/>\n\t<meta name=\"google-site-verification\" content=\"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Solar power: first system of the second project in operation - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:description\" content=\"Zaugg Schlieren AG commissioned the first third of its second solar plant in mid-October. The installed capacity is 98.28 kilowatts peak, which means that around 95 megawatt hours of solar power can be produced annually. The company plans to install solar systems with a total output of 271.47 kilowatts peak by 2026.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/10\/Unbenannt-39.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/10\/Unbenannt-39.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-10-30T13:26:59+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-10-30T13:32:29+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Solar power: first system of the second project in operation - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Zaugg Schlieren AG commissioned the first third of its second solar plant in mid-October. The installed capacity is 98.28 kilowatts peak, which means that around 95 megawatt hours of solar power can be produced annually. The company plans to install solar systems with a total output of 271.47 kilowatts peak by 2026.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/10\/Unbenannt-39.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\\\/#blogposting\",\"name\":\"Solar power: first system of the second project in operation - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"headline\":\"Solar power: first system of the second project in operation\",\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Unbenannt-39.png\",\"width\":1024,\"height\":1024},\"datePublished\":\"2024-10-30T14:26:59+01:00\",\"dateModified\":\"2024-10-30T14:32:29+01:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\\\/#webpage\"},\"articleSection\":\"Company, immoNews, Sustainability, Zurich, Erneuerbare Energien, Immoinvest, immoNews, News, Solarenergie, Zaugg Schlieren, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"position\":2,\"name\":\"Regions\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"position\":3,\"name\":\"Switzerland\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zurich-en\\\/#listItem\",\"name\":\"Zurich\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zurich-en\\\/#listItem\",\"position\":4,\"name\":\"Zurich\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zurich-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\\\/#listItem\",\"name\":\"Solar power: first system of the second project in operation\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\\\/#listItem\",\"position\":5,\"name\":\"Solar power: first system of the second project in operation\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/region-zurich-en\\\/#listItem\",\"name\":\"Zurich\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"email\":\"admin@immomedia.ag\",\"telephone\":\"+41444420002\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/immoinvest_sm-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\\\/#organizationLogo\",\"width\":2560,\"height\":1340},\"image\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Immoinvest\\\/100077962920504\\\/\",\"https:\\\/\\\/x.com\\\/i\\\/flow\\\/login?redirect_after_login=immoinvest_ch\",\"https:\\\/\\\/www.instagram.com\\\/immoinvest_ch\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/immoinvest-swiss\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/\",\"name\":\"immovestuser\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"immovestuser\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\\\/#webpage\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\\\/\",\"name\":\"Solar power: first system of the second project in operation - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Zaugg Schlieren AG commissioned the first third of its second solar plant in mid-October. The installed capacity is 98.28 kilowatts peak, which means that around 95 megawatt hours of solar power can be produced annually. The company plans to install solar systems with a total output of 271.47 kilowatts peak by 2026.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Unbenannt-39.png\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\\\/#mainImage\",\"width\":1024,\"height\":1024},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\\\/#mainImage\"},\"datePublished\":\"2024-10-30T14:26:59+01:00\",\"dateModified\":\"2024-10-30T14:32:29+01:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Solar power: first system of the second project in operation - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Zaugg Schlieren AG commissioned the first third of its second solar plant in mid-October. The installed capacity is 98.28 kilowatts peak, which means that around 95 megawatt hours of solar power can be produced annually. The company plans to install solar systems with a total output of 271.47 kilowatts peak by 2026.","canonical_url":"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/#blogposting","name":"Solar power: first system of the second project in operation - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","headline":"Solar power: first system of the second project in operation","author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/10\/Unbenannt-39.png","width":1024,"height":1024},"datePublished":"2024-10-30T14:26:59+01:00","dateModified":"2024-10-30T14:32:29+01:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/#webpage"},"isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/#webpage"},"articleSection":"Company, immoNews, Sustainability, Zurich, Erneuerbare Energien, Immoinvest, immoNews, News, Solarenergie, Zaugg Schlieren, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.immo-invest.ch\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","position":2,"name":"Regions","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","position":3,"name":"Switzerland","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/#listItem","name":"Zurich"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/#listItem","position":4,"name":"Zurich","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/#listItem","name":"Solar power: first system of the second project in operation"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/#listItem","position":5,"name":"Solar power: first system of the second project in operation","previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/#listItem","name":"Zurich"}}]},{"@type":"Organization","@id":"https:\/\/www.immo-invest.ch\/en\/#organization","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","url":"https:\/\/www.immo-invest.ch\/en\/","email":"admin@immomedia.ag","telephone":"+41444420002","logo":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/09\/immoinvest_sm-scaled.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/#organizationLogo","width":2560,"height":1340},"image":{"@id":"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","https:\/\/x.com\/i\/flow\/login?redirect_after_login=immoinvest_ch","https:\/\/www.instagram.com\/immoinvest_ch\/","https:\/\/www.linkedin.com\/company\/immoinvest-swiss"]},{"@type":"Person","@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author","url":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/","name":"immovestuser","image":{"@type":"ImageObject","@id":"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g","width":96,"height":96,"caption":"immovestuser"}},{"@type":"WebPage","@id":"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/#webpage","url":"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/","name":"Solar power: first system of the second project in operation - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Zaugg Schlieren AG commissioned the first third of its second solar plant in mid-October. The installed capacity is 98.28 kilowatts peak, which means that around 95 megawatt hours of solar power can be produced annually. The company plans to install solar systems with a total output of 271.47 kilowatts peak by 2026.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/#breadcrumblist"},"author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"creator":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/10\/Unbenannt-39.png","@id":"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/#mainImage","width":1024,"height":1024},"primaryImageOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/#mainImage"},"datePublished":"2024-10-30T14:26:59+01:00","dateModified":"2024-10-30T14:32:29+01:00"},{"@type":"WebSite","@id":"https:\/\/www.immo-invest.ch\/en\/#website","url":"https:\/\/www.immo-invest.ch\/en\/","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien","og:type":"article","og:title":"Solar power: first system of the second project in operation - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","og:description":"Zaugg Schlieren AG commissioned the first third of its second solar plant in mid-October. The installed capacity is 98.28 kilowatts peak, which means that around 95 megawatt hours of solar power can be produced annually. The company plans to install solar systems with a total output of 271.47 kilowatts peak by 2026.","og:url":"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/","og:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/10\/Unbenannt-39.png","og:image:secure_url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/10\/Unbenannt-39.png","og:image:width":1024,"og:image:height":1024,"article:published_time":"2024-10-30T13:26:59+00:00","article:modified_time":"2024-10-30T13:32:29+00:00","article:publisher":"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","twitter:card":"summary_large_image","twitter:site":"@i","twitter:title":"Solar power: first system of the second project in operation - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","twitter:description":"Zaugg Schlieren AG commissioned the first third of its second solar plant in mid-October. The installed capacity is 98.28 kilowatts peak, which means that around 95 megawatt hours of solar power can be produced annually. The company plans to install solar systems with a total output of 271.47 kilowatts peak by 2026.","twitter:creator":"@i","twitter:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/10\/Unbenannt-39.png"},"aioseo_meta_data":{"post_id":"118632","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-10-30 13:28:54","updated":"2025-10-24 12:24:15","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/\" title=\"Regions\">Regions<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/\" title=\"Switzerland\">Switzerland<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/\" title=\"Zurich\">Zurich<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tSolar power: first system of the second project in operation\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.immo-invest.ch\/en\/"},{"label":"Regions","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/"},{"label":"Switzerland","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/"},{"label":"Zurich","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/region-zurich-en\/"},{"label":"Solar power: first system of the second project in operation","link":"https:\/\/www.immo-invest.ch\/en\/solarstrom-erste-anlage-des-zweiten-projekts-in-betrieb\/"}],"featured_image_src":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/10\/Unbenannt-39-336x168.png","_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/118632","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=118632"}],"version-history":[{"count":0,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/118632\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/118627"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=118632"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=118632"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=118632"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}