{"id":118257,"date":"2024-10-28T16:00:00","date_gmt":"2024-10-28T15:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=118257"},"modified":"2024-10-28T11:59:15","modified_gmt":"2024-10-28T10:59:15","slug":"solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt","status":"publish","type":"post","link":"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/","title":{"rendered":"Solar park project completed five months earlier than planned"},"content":{"rendered":"<p class=\"bodytext\"><a href=\"https:\/\/www.nexans.ch\/de\/\" target=\"_blank\" rel=\"noopener\">Nexans Switzerland<\/a> has commissioned its new solar park at the Cortaillod site five months ahead of schedule. It consists of ten individual systems, each of which was installed on a different roof. These independent units were then connected together to form a higher-level system. According to a <a href=\"https:\/\/www.nexans.ch\/de\/News\/news\/details\/2024\/10\/ISPV.html\" target=\"_blank\" rel=\"noopener\">statement from<\/a> the cable manufacturer, this required adaptations to the specific architectural and structural features.<\/p>\n<p class=\"bodytext\">This approach made it possible to completely avoid interfering with production activities at the site during the installation work. &ldquo;The result: a 100 per cent successful commissioning, almost five months earlier than planned.&rdquo;<\/p>\n<p class=\"bodytext\">Since the summer of 2023, a team of <a href=\"https:\/\/www.groupe-e.ch\/de\" target=\"_blank\" rel=\"noopener\">Groupe E Greenwatt<\/a> specialists from the Boudry NE site has installed over 4,000 solar modules, each with a capacity of 430 watts, &ldquo;under demanding technical conditions&rdquo;. The solar park has a total output of 1.7 megawatts. Together with a 700 kilowatt system previously installed by Groupe E, Nexans now achieves a self-consumption rate estimated at over 90 per cent.<\/p>\n<p class=\"bodytext\">&ldquo;This strategic partnership supports our goal of continuing to reduce our environmental footprint and develop our business sustainably, and strengthens our energy resilience,&rdquo; Nexans Switzerland CEO Marco Spinelli is quoted as saying. &ldquo;Even without these plants, Nexans only consumes electricity that comes 100 per cent from renewable sources, and has done so since the beginning of the year.&rdquo;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>With the help of Groupe E Greenwatt, Nexans has put 4000 solar modules with an output of 1.7 megawatts into operation on ten roofs at its site in Cortaillod. With a system installed in 2015, the cable manufacturer now covers over 90 per cent of its own requirements.<\/p>\n","protected":false},"author":2,"featured_media":67178,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"pmpro_default_level":"","inline_featured_image":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[12482,12476,44777,22698],"tags":[50161,18754,43096,40232,12564,12525,12526,12847,12528,12586,32585,15691],"class_list":["post-118257","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","category-immonews","category-neuenburg-en","category-sustainability","tag-cortaillod-en","tag-eigenverbrauch-en","tag-energieautarkie-en","tag-erneuerbare-energien-en","tag-immobilien-en","tag-immoinvest-en","tag-immonews-en","tag-nachhaltigkeit-en","tag-news-en","tag-schweiz-en","tag-solarmodule-en","tag-solarpark-en","pmpro-has-access"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"With the help of Groupe E Greenwatt, Nexans has put 4000 solar modules with an output of 1.7 megawatts into operation on ten roofs at its site in Cortaillod. With a system installed in 2015, the cable manufacturer now covers over 90 per cent of its own requirements.","autor":"ce\/mm","ort":"Cortaillod NE\/Granges-Paccot FR","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":""},"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.0.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"With the help of Groupe E Greenwatt, Nexans has put 4000 solar modules with an output of 1.7 megawatts into operation on ten roofs at its site in Cortaillod. With a system installed in 2015, the cable manufacturer now covers over 90 per cent of its own requirements.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"immovestuser\"\/>\n\t<meta name=\"google-site-verification\" content=\"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.0.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Solar park project completed five months earlier than planned - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta property=\"og:description\" content=\"With the help of Groupe E Greenwatt, Nexans has put 4000 solar modules with an output of 1.7 megawatts into operation on ten roofs at its site in Cortaillod. With a system installed in 2015, the cable manufacturer now covers over 90 per cent of its own requirements.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/11\/solar_15-scaled.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/11\/solar_15-scaled.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-10-28T15:00:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-10-28T10:59:15+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Solar park project completed five months earlier than planned - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien\" \/>\n\t\t<meta name=\"twitter:description\" content=\"With the help of Groupe E Greenwatt, Nexans has put 4000 solar modules with an output of 1.7 megawatts into operation on ten roofs at its site in Cortaillod. With a system installed in 2015, the cable manufacturer now covers over 90 per cent of its own requirements.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@i\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/11\/solar_15-scaled.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\\\/#blogposting\",\"name\":\"Solar park project completed five months earlier than planned - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"headline\":\"Solar park project completed five months earlier than planned\",\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/solar_15-scaled.jpg\",\"width\":2560,\"height\":1920},\"datePublished\":\"2024-10-28T16:00:00+01:00\",\"dateModified\":\"2024-10-28T11:59:15+01:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\\\/#webpage\"},\"articleSection\":\"Energy, immoNews, Neuenburg, Sustainability, Cortaillod, Eigenverbrauch, Energieautarkie, Erneuerbare Energien, immobilien, Immoinvest, immoNews, Nachhaltigkeit, News, Schweiz, Solarmodule, Solarpark, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"position\":2,\"name\":\"Regions\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"position\":3,\"name\":\"Switzerland\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/espace-mittelland\\\/#listItem\",\"name\":\"Espace Mittelland\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/#listItem\",\"name\":\"Regions\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/espace-mittelland\\\/#listItem\",\"position\":4,\"name\":\"Espace Mittelland\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/espace-mittelland\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/espace-mittelland\\\/neuenburg-en\\\/#listItem\",\"name\":\"Neuenburg\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/#listItem\",\"name\":\"Switzerland\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/espace-mittelland\\\/neuenburg-en\\\/#listItem\",\"position\":5,\"name\":\"Neuenburg\",\"item\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/espace-mittelland\\\/neuenburg-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\\\/#listItem\",\"name\":\"Solar park project completed five months earlier than planned\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/espace-mittelland\\\/#listItem\",\"name\":\"Espace Mittelland\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\\\/#listItem\",\"position\":6,\"name\":\"Solar park project completed five months earlier than planned\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/category\\\/regions-en\\\/switzerland\\\/espace-mittelland\\\/neuenburg-en\\\/#listItem\",\"name\":\"Neuenburg\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"email\":\"admin@immomedia.ag\",\"telephone\":\"+41444420002\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/immoinvest_sm-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\\\/#organizationLogo\",\"width\":2560,\"height\":1340},\"image\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Immoinvest\\\/100077962920504\\\/\",\"https:\\\/\\\/x.com\\\/i\\\/flow\\\/login?redirect_after_login=immoinvest_ch\",\"https:\\\/\\\/www.instagram.com\\\/immoinvest_ch\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/immoinvest-swiss\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/\",\"name\":\"immovestuser\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"immovestuser\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\\\/#webpage\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\\\/\",\"name\":\"Solar park project completed five months earlier than planned - immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"With the help of Groupe E Greenwatt, Nexans has put 4000 solar modules with an output of 1.7 megawatts into operation on ten roofs at its site in Cortaillod. With a system installed in 2015, the cable manufacturer now covers over 90 per cent of its own requirements.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/author\\\/immovestuser\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/solar_15-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\\\/#mainImage\",\"width\":2560,\"height\":1920},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\\\/#mainImage\"},\"datePublished\":\"2024-10-28T16:00:00+01:00\",\"dateModified\":\"2024-10-28T11:59:15+01:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/\",\"name\":\"immo!nvest - Die Plattform f\\u00fcr Standorte und Immobilien\",\"description\":\"Die\\u00a0Plattform f\\u00fcr Standorte und Immobilien\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.immo-invest.ch\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Solar park project completed five months earlier than planned - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"With the help of Groupe E Greenwatt, Nexans has put 4000 solar modules with an output of 1.7 megawatts into operation on ten roofs at its site in Cortaillod. With a system installed in 2015, the cable manufacturer now covers over 90 per cent of its own requirements.","canonical_url":"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"fHJKvgWpZCR2zVBHWfkQeFXC11qieUSff0HGNYfuyLA","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/#blogposting","name":"Solar park project completed five months earlier than planned - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","headline":"Solar park project completed five months earlier than planned","author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/11\/solar_15-scaled.jpg","width":2560,"height":1920},"datePublished":"2024-10-28T16:00:00+01:00","dateModified":"2024-10-28T11:59:15+01:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/#webpage"},"isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/#webpage"},"articleSection":"Energy, immoNews, Neuenburg, Sustainability, Cortaillod, Eigenverbrauch, Energieautarkie, Erneuerbare Energien, immobilien, Immoinvest, immoNews, Nachhaltigkeit, News, Schweiz, Solarmodule, Solarpark, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.immo-invest.ch\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","position":2,"name":"Regions","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","position":3,"name":"Switzerland","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/espace-mittelland\/#listItem","name":"Espace Mittelland"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/#listItem","name":"Regions"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/espace-mittelland\/#listItem","position":4,"name":"Espace Mittelland","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/espace-mittelland\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/espace-mittelland\/neuenburg-en\/#listItem","name":"Neuenburg"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/#listItem","name":"Switzerland"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/espace-mittelland\/neuenburg-en\/#listItem","position":5,"name":"Neuenburg","item":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/espace-mittelland\/neuenburg-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/#listItem","name":"Solar park project completed five months earlier than planned"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/espace-mittelland\/#listItem","name":"Espace Mittelland"}},{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/#listItem","position":6,"name":"Solar park project completed five months earlier than planned","previousItem":{"@type":"ListItem","@id":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/espace-mittelland\/neuenburg-en\/#listItem","name":"Neuenburg"}}]},{"@type":"Organization","@id":"https:\/\/www.immo-invest.ch\/en\/#organization","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","url":"https:\/\/www.immo-invest.ch\/en\/","email":"admin@immomedia.ag","telephone":"+41444420002","logo":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2024\/09\/immoinvest_sm-scaled.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/#organizationLogo","width":2560,"height":1340},"image":{"@id":"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","https:\/\/x.com\/i\/flow\/login?redirect_after_login=immoinvest_ch","https:\/\/www.instagram.com\/immoinvest_ch\/","https:\/\/www.linkedin.com\/company\/immoinvest-swiss"]},{"@type":"Person","@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author","url":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/","name":"immovestuser","image":{"@type":"ImageObject","@id":"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8e01f4d99f2eeea7a362ebb93305e1172a70e9293ba250f897a65c39f54cdd1e?s=96&d=mm&r=g","width":96,"height":96,"caption":"immovestuser"}},{"@type":"WebPage","@id":"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/#webpage","url":"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/","name":"Solar park project completed five months earlier than planned - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"With the help of Groupe E Greenwatt, Nexans has put 4000 solar modules with an output of 1.7 megawatts into operation on ten roofs at its site in Cortaillod. With a system installed in 2015, the cable manufacturer now covers over 90 per cent of its own requirements.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.immo-invest.ch\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/#breadcrumblist"},"author":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"creator":{"@id":"https:\/\/www.immo-invest.ch\/en\/author\/immovestuser\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/11\/solar_15-scaled.jpg","@id":"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/#mainImage","width":2560,"height":1920},"primaryImageOfPage":{"@id":"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/#mainImage"},"datePublished":"2024-10-28T16:00:00+01:00","dateModified":"2024-10-28T11:59:15+01:00"},{"@type":"WebSite","@id":"https:\/\/www.immo-invest.ch\/en\/#website","url":"https:\/\/www.immo-invest.ch\/en\/","name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","description":"Die\u00a0Plattform f\u00fcr Standorte und Immobilien","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.immo-invest.ch\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien - Die\u00a0Plattform f\u00fcr Standorte und Immobilien","og:type":"article","og:title":"Solar park project completed five months earlier than planned - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","og:description":"With the help of Groupe E Greenwatt, Nexans has put 4000 solar modules with an output of 1.7 megawatts into operation on ten roofs at its site in Cortaillod. With a system installed in 2015, the cable manufacturer now covers over 90 per cent of its own requirements.","og:url":"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/","og:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/11\/solar_15-scaled.jpg","og:image:secure_url":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/11\/solar_15-scaled.jpg","og:image:width":2560,"og:image:height":1920,"article:published_time":"2024-10-28T15:00:00+00:00","article:modified_time":"2024-10-28T10:59:15+00:00","article:publisher":"https:\/\/www.facebook.com\/people\/Immoinvest\/100077962920504\/","twitter:card":"summary_large_image","twitter:site":"@i","twitter:title":"Solar park project completed five months earlier than planned - immo!nvest - Die Plattform f\u00fcr Standorte und Immobilien","twitter:description":"With the help of Groupe E Greenwatt, Nexans has put 4000 solar modules with an output of 1.7 megawatts into operation on ten roofs at its site in Cortaillod. With a system installed in 2015, the cable manufacturer now covers over 90 per cent of its own requirements.","twitter:creator":"@i","twitter:image":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/11\/solar_15-scaled.jpg"},"aioseo_meta_data":{"post_id":"118257","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-10-28 10:59:16","updated":"2025-10-24 12:11:15","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/\" title=\"Regions\">Regions<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/\" title=\"Switzerland\">Switzerland<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/espace-mittelland\/\" title=\"Espace Mittelland\">Espace Mittelland<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/espace-mittelland\/neuenburg-en\/\" title=\"Neuenburg\">Neuenburg<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tSolar park project completed five months earlier than planned\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.immo-invest.ch\/en\/"},{"label":"Regions","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/"},{"label":"Switzerland","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/"},{"label":"Espace Mittelland","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/espace-mittelland\/"},{"label":"Neuenburg","link":"https:\/\/www.immo-invest.ch\/en\/category\/regions-en\/switzerland\/espace-mittelland\/neuenburg-en\/"},{"label":"Solar park project completed five months earlier than planned","link":"https:\/\/www.immo-invest.ch\/en\/solarpark-projekt-fuenf-monate-frueher-als-geplant-fertiggestellt\/"}],"featured_image_src":"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/11\/solar_15-336x168.jpg","_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/118257","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=118257"}],"version-history":[{"count":0,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/118257\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/67178"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=118257"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=118257"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=118257"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}