According to a media release<\/a> , Primeo Energie<\/a> is building a new underground heating center for the existing heating network between the indoor swimming pool and the music school in Neuallschwil. The foundation stone was officially laid on Wednesday. The system is operated with two wood-burning boilers with an output of 840 kilowatts each. In addition, a heat pump uses the environmental heat and waste heat from the indoor pool. This generates 80 percent of the energy required. The plant will go into operation in early summer 2021.<\/p>\n "The community and Primeo Energie are setting another example for a renewable, CO2-neutral heating supply", said Nicole Nüssli-Kaiser, President of the City Council. "With this central heating system, we not only heat the school building, but also enable the entire district to rely on renewable thermal energy."<\/p>\n This new heating center is another piece of the puzzle in the heating network, the message goes on to say. It will be connected by a pipeline to the heating network, which is also primarily fired with wood chips, at the old people's center at Bachgraben. This enabled synergies to be used between the two district heating networks. Further properties are to be connected to the network. By merging several centers, security of supply will also be increased.<\/p>\n","protected":false},"excerpt":{"rendered":" M\u00fcnchenstein BL – Primo Energie errichtet derzeit eine neue unterirdische W\u00e4rmezentrale f\u00fcr den bestehenden W\u00e4rmeverbund in Neuallschwil. Damit wird das ganze Quartier samt Schulhaus und Hallenbad mit CO2-neutraler W\u00e4rme versorgt.<\/p>\n","protected":false},"author":2,"featured_media":21236,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","inline_featured_image":false},"categories":[12482,12476],"tags":[12535,14716,12521,12525,13694,12528,20280,20048],"acf":[],"_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts\/29829"}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/comments?post=29829"}],"version-history":[{"count":0,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts\/29829\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/media\/21236"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/media?parent=29829"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/categories?post=29829"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/tags?post=29829"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}