A new wastewater treatment plant is being built in S-chanf. The Upper Engadine ARA is scheduled to start operations in mid-2021. Repower<\/a> has installed a solar system with an area of 5800 square meters and 3447 solar modules on the roof of the system. The plant has an output of 1.1 megawatts and an expected annual output of 1.45 gigawatt hours. That corresponds to the consumption of 325 households, writes the Graubünden energy supplier in a press release<\/a> . The system was designed in such a way that it can withstand heavy snowfall. The modules themselves have a total weight of 69 tons.<\/p>\n The system has now been put into operation. Repower has invested 1.7 million francs.<\/p>\n The ARA itself is operated with a combined heat and power unit. This means that electricity consumption on site can be optimized with the aim of using as much solar power as possible on site.<\/p>\n","protected":false},"excerpt":{"rendered":" Repower hat eine Solaranlage auf dem Dach der ARA Oberengadin in Betrieb genommen. Die 5800 Quadratmeter grosse Anlage ist mit einer Leistung von 1,1 Megawatt und einer voraussichtlichen Produktion von 1,45 Gigawattstunden die gr\u00f6sste im Engadin.<\/p>\n","protected":false},"author":2,"featured_media":21201,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","inline_featured_image":false},"categories":[12482,12476],"tags":[18318,18319,12521,12525,12526,12528,15324,12530,12778,14396,12750,18320],"acf":[],"_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts\/27769"}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/comments?post=27769"}],"version-history":[{"count":0,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts\/27769\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/media\/21201"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/media?parent=27769"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/categories?post=27769"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/tags?post=27769"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}