In<\/a> awarding this year's Eurosolar prizes, Eurosolar honored the Zurich company Felix Partner Architektur<\/span><\/a> in the solar architecture category for realizing a project at Bergün GR. According to a press release,<\/a> a 350-year-old Graubünden farmhouse in Latsch was converted into a modern zero-energy house through consistent use of solar energy. The historical substance was preserved.<\/p>\n The European Solar Prize has been awarded by Eurosolar since 1994 for particularly eligible projects in the field of renewable energies. Eurosolar is the short form of European Association for Renewable Energies e. V. The association has its seat in Bonn. The winners in the categories of municipalities, solar architecture, industry, regional associations, mobility, media and education contribute with their outstanding projects to regenerative and decentralized energy supply in Europe, according to the media release.<\/p>\n Eurosolar President Peter Droege is quoted as saying that the award-winning projects are perfect examples of the ongoing transformation of the energy system: "Today's award winners show how the world can become completely renewable."<\/p>\n In addition to the award for the best project in the solar architecture category by the Swiss architects, other award winners are highlighted in the communication. Such an island community that owns, manages and maintains its own energy network that supplies all residents with renewable electricity. There is also a film director who raises awareness of the ecological and social effects of coal power. And also to a so-called social enterprise, which enables an independent and low-carbon energy supply with mobile biogas technology.<\/p>\n","protected":false},"excerpt":{"rendered":" \u00a0Dem Z\u00fcrcher Architekturb\u00fcro Felix Partner ist der diesj\u00e4hrige Europ\u00e4ische Solarpreis in der Kategorie Solararchitektur verliehen worden. Ausgezeichnet wurde der Umbau eines alten B\u00fcndner Bauernhauses zu einem Nullenergiehaus.<\/p>\n","protected":false},"author":2,"featured_media":23391,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","inline_featured_image":false},"categories":[12482,12476],"tags":[12521,12525,12526,12528,12530,15637,12750,15638,13373,14993],"acf":[],"_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts\/23390"}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/comments?post=23390"}],"version-history":[{"count":0,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts\/23390\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/media\/23391"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/media?parent=23390"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/categories?post=23390"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/tags?post=23390"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}