Last year, the Swiss Energypark achieved<\/a> a production record for the generation of energy from wind power, hydropower and solar power. The amount of energy is stated in a press release<\/a> as 127 gigawatt hours. In mathematical terms, this corresponds to the consumption of 28,200 households.<\/p>\n The Swiss Energypark, founded in 2016 on the initiative of Bern-based BKW Energie AG<\/a> and the cantons of Bern and Jura, produces electricity in the Juvent<\/a> wind power plant, the Mont-Soleil<\/a> solar power plant and the La Goule<\/a> hydropower plant on the Doubs. The region, which corresponds to the supply area of La Goule, was able to cover 86 percent of its needs with local renewable energy from sustainable sources, according to the announcement. Such a quota is unique in Switzerland at this level.<\/p>\n In the communication from Energypark and BKW it is pointed out that the supplied region is suitable as a test field for future developments in energy supply. Because the energy mix of wind power, hydropower and solar energy leads to the compensation of underproduction in one of the sectors. The stable high-pressure weather in 2020 increased solar power production, while the yield from hydropower decreased due to the temporary low water of the Doubs.<\/p>\n The Juvent wind power plant generated almost 85 gigawatt hours in 2020, which is the highest value ever achieved at a location in Switzerland and corresponds to the consumption of around 18,900 households. The forecasts made during construction in 2016 were exceeded by 20 percent.<\/p>\n","protected":false},"excerpt":{"rendered":" Der Swiss Energypark hat 2020 ein Rekordergebnis f\u00fcr dezentrale erneuerbare Energie aus der Region erzielt. Der Produktionsrekord belief sich auf 127\u00a0Gigawattstunden. Das entspricht dem Verbrauch von 28\u2019200 Haushalten.<\/p>\n","protected":false},"author":2,"featured_media":22276,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","inline_featured_image":false},"categories":[12482,12476],"tags":[14131,12520,12521,12525,12526,15242,15245,15248,12528,15251,15254],"acf":[],"_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts\/23132"}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/comments?post=23132"}],"version-history":[{"count":0,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts\/23132\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/media\/22276"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/media?parent=23132"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/categories?post=23132"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/tags?post=23132"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}