According to a press release<\/a> from WWZ<\/a> , the construction of the 6.5 kilometer long heat transport pipeline from Perlen to Rotkreuz is in the starting blocks. It is part of the Ennetsee heating network. A challenge of this construction phase is the trenchless crossing under the Reuss and the A14 motorway. To this end, WWZ is starting these days between the sports field of the Root LU sports club and the Rütilöli area in Inwil LU with two pilot drillings for protective plastic pipes. The official start of construction is at the end of March, beginning of April.<\/p>\n The official start of construction of this heat transport pipeline from the Renergia waste incineration plant in Perlen to Rotkreuz is planned for this spring. The district heating pipes would then also be pulled into the protective pipes under the A14 motorway. After completion of the major project, the region should save around 12,000 tons of CO2 annually.<\/p>\n","protected":false},"excerpt":{"rendered":" WWZ macht die ersten Schritte zur Realisierung des W\u00e4rmeverbunds Ennetsee. Der Zuger Strom-, Wasser- und Telekomversorger beginnt mit zwei Pilotbohrungen unter der Autobahn A14 und der Reuss. Sie dienen dem k\u00fcnftigen W\u00e4rmetransport von Perlen LU nach Rotkreuz ZG. <\/p>\n","protected":false},"author":2,"featured_media":21492,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","inline_featured_image":false},"categories":[12487,12493,12476],"tags":[15173,15174,12520,12525,12526,15175,12528,15176,14595,15177,15178,15179],"acf":[],"_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts\/23099"}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/comments?post=23099"}],"version-history":[{"count":0,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts\/23099\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/media\/21492"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/media?parent=23099"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/categories?post=23099"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/tags?post=23099"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}