The office unit in NEST<\/a> called Sprint is intended to set new standards for circular building. The groundbreaking ceremony will take place in mid-April. It should be finished in summer. Sprint is located on the first floor of NEST in Dübendorf. The three-storey modular building is the research and innovation<\/span> center of the Federal Materials Testing and Research Institute ( Empa<\/a> ) and the water research institute of the ETH Domain ( Eawag<\/a> ).<\/p>\n As stated in a press release<\/a> by Empa, those involved in the planning concentrated on finding the most general solutions possible for a later dismantling. In doing so, they follow a design<\/span> approach that facilitates future changes and dismantling to recover systems, components and materials. Today's buildings have to be built in such a way “that their components can be fed back into cycles”, says Kerstin Müller, managing architect at baubüro in situ<\/a> and managing director of Zirkular GmbH<\/a> .<\/p>\n Your colleague Oliver Seidel points out that reusing materials is often associated with lower costs. “But the added value<\/span> lies in another area: Re-use is more sustainable. And in terms of quality there is no loss. ”On the contrary. For example, the aesthetics of an old wooden parquet floor represent added value<\/span>.<\/p>\n "For the first time, Empa is combining the approach of reuse and the market requirements of fast and flexible construction," Enrico Marchesi, innovation<\/span> manager and project manager at NEST, is quoted as saying. "With the new 'Sprint' unit, we want to show that these needs can be met together."<\/p>\n","protected":false},"excerpt":{"rendered":" Im modularen Forschungs- und Innovationsgeb\u00e4ude von Empa und Eawag beginnt der Bau der neuen B\u00fcroeinheit namens Sprint. Die Einheit im ersten Obergeschoss im NEST wird gr\u00f6sstenteils aus r\u00fcckbauf\u00e4higen und wiederverwertbaren Materialien errichtet. <\/p>\n","protected":false},"author":2,"featured_media":21756,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","inline_featured_image":false},"categories":[12487,12493,12476],"tags":[12536,14366,13905,12573,12519,14367,12525,12526,14368,14369,14370,12528],"acf":[],"_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts\/22621"}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/comments?post=22621"}],"version-history":[{"count":0,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts\/22621\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/media\/21756"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/media?parent=22621"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/categories?post=22621"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/tags?post=22621"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}