The symbolic construction work for the expansion of the research campus by Empa<\/a> and Eawag<\/a> in Dübendorf began on Wednesday. The groundbreaking ceremony gave the go-ahead for a new laboratory building. In addition, a multifunctional building and a multi-storey car park are planned on the 20,000 square meter site. According release<\/a> Empa and completion is scheduled for the middle of the 2024th<\/p> The laboratory building will provide space for around 60 new laboratories and offices, the multifunctional building 1000 square meters of office space and space for restaurants on the ground floor. All parking spaces will be moved to the multi-storey car park. A total of 260 vehicles should find space in it. This would make the outside areas more inviting and safer for pedestrians and cyclists. In addition, more greening is possible.<\/p> In the future, research will not only be carried out in, but also on and with the new buildings. Innovations from Empa's laboratories are to be used primarily in the areas of energy and building technology. For example, a field with geothermal probes is planned that will store the waste heat from the buildings and release it again in winter. A research project will then investigate how this innovation<\/span> affects the campus energy supply.<\/p> <\/p>","protected":false},"excerpt":{"rendered":" Die Eidgen\u00f6ssische Materialforschungs- und Pr\u00fcfungsanstalt (Empa) und das Wasserforschungsinstitut Eawag haben den Startschuss zum Bau neuer Geb\u00e4ude auf ihrem Forschungscampus in D\u00fcbendorf gegeben. Sie sollen 2024 fertiggestellt sein. <\/p>\n","protected":false},"author":2,"featured_media":22193,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","inline_featured_image":false},"categories":[12476],"tags":[12533,12535,12536,12573,12519,12525,12526,12528,14109],"acf":[],"_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts\/22482"}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/comments?post=22482"}],"version-history":[{"count":0,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts\/22482\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/media\/22193"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/media?parent=22482"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/categories?post=22482"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/tags?post=22482"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}