With its construction project for the Rieter Campus, Rieter is committed<\/a> to the Winterthur location and to Switzerland as a business location, according to a press release from<\/a> the textile machine manufacturer. The foundation stone for the new customer and technology center as well as the administration building was laid on Wednesday. The company, which has been based in Winterthur for 225 years, is investing around 80 million francs in this<\/p>\n From 2024, the Rieter campus is to offer space for around 700 workplaces on a floor area of over 30,000 square meters. To this end, the company developed an open room concept with a specialist in office architecture. With heat generation via geothermal probes and a 1,300 square meter photovoltaic system, Rieter is relying on renewable energies. “The entrepreneurial focus on sustainable and energy-efficient solutions for yarn production is thus reflected in the overall concept of the campus,” CEO Norbert Klapper is quoted as saying.<\/p>\n In the course of its company history, Rieter has helped shape the city of Winterthur, said Chairman of the Board of Directors Bernhard Jucker. “Now, with the new campus, the foundation is being laid for the future as a leading technology company.”<\/p>\n","protected":false},"excerpt":{"rendered":" Am Mittwoch ist die Grundsteinlegung f\u00fcr den neuen Rieter Campus erfolgt. Bis 2024 sollen das neue Kunden- und Technologiezentrum sowie das Verwaltungsgeb\u00e4ude bezugsbereit sein. Die Investitionen daf\u00fcr belaufen sich auf rund 80 Millionen Franken.<\/p>\n","protected":false},"author":2,"featured_media":21360,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","inline_featured_image":false},"categories":[12476],"tags":[12536,12767,12768,12769,12564,12525,12526,12770,12771,12772,12528,12773,12618,12774,12775,12776],"acf":[],"_links":{"self":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts\/21359"}],"collection":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/comments?post=21359"}],"version-history":[{"count":0,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/posts\/21359\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/media\/21360"}],"wp:attachment":[{"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/media?parent=21359"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/categories?post=21359"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.immo-invest.ch\/dev\/en\/wp-json\/wp\/v2\/tags?post=21359"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}